scindu funding
Wszystkie nabory

Demonstration for Long-duration Battery Energy Storage Systems (BATT4EU Partnership)

Horyzont Europa · Temat konkursu

HORIZON-CL5-2027-05-D2-08

Podsumowanie

Polska firma może skorzystać z tego naboru na B+R.

Funds companies and researchers demonstrating innovative battery storage exceeding eight hours for utility systems and industrial consumers using abundant, sustainable materials.

Kto może złożyć wniosek
Firma może być liderem: SME, large company, startup, research org, university.
Kwota
18 800 000 €Budżet orientacyjny
Termin
15.09.2027 02:00 CESTza 326 dni
Status
Nadchodzącyotwarcie 5 maj 2027
Otwórz na portaluZarejestruj się, aby zachować nabór

Ocena maszynowa na podstawie tekstu naboru; warunki sprawdź u źródła.

Opis

Expected Outcome:

Projects are expected to contribute to all of the following outcomes:

• Demonstrated system-level long-duration energy storage (LDES) solutions, explicitly aimed at enhancing grid stability, resilience, and flexibility in Europe.

• Substantial reduction of Europe's dependence on critical raw materials through the use of abundant, low-cost, and sustainable materials.

• Contribute to strategic insights for a coherent EU-wide stationary storage deployment strategy, enhancing European energy autonomy and sustainability.

• Sufficient and reproducible operational data and insights to serve as reliable input towards detailed technoeconomic analyses.

Scope:

Proposals should focus on system-level demonstrations of innovative long-duration (> 8 hours) battery storage concepts that can effectively support utility-scale energy systems or industrial consumers in achieving energy security and operational sustainability.

Projects are expected to cover all the following points:

• Demonstration of advanced long-duration storage technologies not yet on the market such as novel redox flow batteries (standard or mediated), high-temperature systems, metal-air systems, multivalent chemistries (organic or aqueous), or other non-commercialised technologies or architectures.

• Assessment and definition of use case(s) intended for the proposed technology (front-of-the-meter grid-scale storage, behind-the-meter large industrial energy consumer, firming of renewable generation) along with quantified impact on improved grid resilience, reduced emissions, safety, and lowered energy storage cost.

• Assessment of hybridization potential of complementary energy storage technologies (e.g., redox flow batteries with supercapacitors) to optimize overall system performance for the intended use case(s) and extending system lifecycle.

• Utilization of abundant, low-cost, and sustainable materials, explicitly prioritizing materials with reliable and scalable European supply chains, accompanied by realistic and detailed pathways to production routes at scale.

• Integration of advanced digital technologies, for accurate state-of-charge (SOC), state-of-health (SOH), and lifetime predictions, optimizing battery management systems (BMS), energy management systems (EMS), and overall component performance for extended system longevity.

• Comprehensive techno-economic analyses, including realistic assessments of CAPEX, OPEX, based on measured technical performance metrics (e.g., self-discharge rates, calendar life, cycle life, round-trip efficiency, necessary safety investments) to clearly establish economic viability and competitiveness for the intended use-case in comparison to the commercial, incumbent technology.

• Comprehensive safety assessment at system-level, documenting potential concerns (e.g. flammability, toxicity, explosion potential) and mitigation strategies ahead of widescale adoption of technology.

The Commission initiative for Safe and Sustainable by Design[1] (SSbD) sets a framework for assessing the safety and sustainability of chemicals and materials which should be considered as a reference for project proposals.

Whenever the expected exploitation of project results entails developing, creating, manufacturing and marketing a product or process, or in creating and providing a service, the plan for the exploitation and dissemination of results must include a strategy for such exploitation. The exploitation plans are expected to include preliminary plans for scalability, commercialisation, and deployment (feasibility study, business plan) indicating the possible funding sources to be potentially used (in particular the Innovation Fund).

Proposals could consider the involvement of the European Commission's Joint Research Centre (JRC)[2] whose contribution could consist of performing experimental or desk-top research on battery performance or safety. For further information on the JRC’s possible contribution to the projects, please, search for additional publicly available information on the JRC’s website[3] (EU Science Hub) on the NCP portal, or request specific information from the JRC (JRC-NCP-Network@ec.europa.eu)

JRC will assure that all the other applicants receive the same information on the JRC’s possible contribution to the project (e.g., via the topic-specific FAQs under the Funding and Tenders Portal).

This topic implements the co-programmed European Partnership on Batteries (Batt4EU). As such, projects resulting from this topic will be expected to report on the results to the European Partnership on Batteries (Batt4EU) in support of the monitoring of its KPIs.

Technology Readiness Level - Technology readiness level expected from completed projects

Activities are expected to achieve TRL 6-7 by the end of the project – see General Annex B. Activities may start at any TRL.

[1] https://research-and-innovation.ec.europa.eu/research-area/industrial-research-and-innovation/key-enabling-technologies/chemicals-and-advanced-materials_en

[2] https://joint-research-centre.ec.europa.eu/laboratories-z/battery-energy-storage-testing_en

[3] JRC NCP | Horizon Europe NCP Portal

Kto może złożyć wniosek – szczegóły
Typy wnioskodawców
SME, Large company, Startup, Research org, University
Cel
Badania i innowacje
Znaczenie dla B+R
3 z 3
Polska kwalifikuje się
Tak
Ograniczenie krajów
—
Region
Dowolny
Konsorcjum
Niejasne
Poziom gotowości (TRL)
—
Tematy
  • Long-duration battery storage
  • Grid stability
  • Utility-scale energy storage
  • Sustainable battery materials
  • Industrial energy security

Ocena maszynowa na podstawie tekstu naboru; warunki sprawdź u źródła. 23 paź 2026

Kwoty i koszty
Budżet orientacyjny
18 800 000 €

Budżet tematu z tabeli budżetowej portalu. Limity na projekt i ryczałty są w warunkach konkursu.

Dane naboru
Otwarcie
5 maj 2027
Tryb terminów
Single-stage
Program
Horyzont Europa · 2021 - 2027
Konkurs
HORIZON-CL5-2027-05 · BATTERIES and ENERGY
Rodzaje działań
HORIZON Innovation Actions
Źródło
ec.europa.eu
Sprawdzono
24 paź 2026
Aktualizacja portalu
7 paź 2026

To skrót ze strony źródłowej, nie tekst urzędowy. Kwalifikowalność, warunki i system składania wniosków są u źródła.