scindu funding
All calls

GW-P1 Zadania z zakresu zaopatrzenia w wodę i ograniczenia zużycia wody

WFOŚiGW Warszawa · National call

GW-P1

Summary

Not an R&D call a Polish company can use, by Scindu's rule.

Funds water supply infrastructure and water-saving measures for companies, local governments, public service providers, other legal persons and sole traders.

Who can apply
Companies can lead: SME, large company, startup, municipality, public body, individual, other.
Amount
Budget not stated
Deadline
No deadline
Status
Openopened 23 Mar 2026
Open the official pageRegister to keep this call

Machine-classified from the call text; check eligibility at the source.

Description

The description is on the provider's page.

Who can apply, in detail
Applicant types
SME, Large company, Startup, Municipality, Public body, Individual, Other
Purpose
Energy, environment, infrastructure
R&D relevance
0 of 3
Poland eligible
Yes
Country limit
—
Region
Any
Consortium
Unclear
Readiness level (TRL)
—
Topics
  • Water supply
  • Water treatment
  • Water-saving installations
  • Rainwater reuse

Machine-classified from the call text; check eligibility at the source. 23 Oct 2026

Conditions8

Typed facts extracted from the source documents by Scindu's grant-data review. Each value keeps its own conditions. Unknown means unstated, not zero or unlimited.

Applicant type
JST and their associations; entities providing public services while performing JST own tasks; commercial companies; other legal persons; natural persons conducting business activity
Eligible project scope
water-treatment/water-supply stations and water intakes; new or reconstructed water networks; building connections to water networks; water-saving installations and use of rainwater for economic purposes; other water-supply/water-conservation tasks with ecological effect
Other condition
instrument: loan; qualification: Open-mode intake until allocation exhaustion; the Fund may suspend or terminate earlier.; status: open_as_of_capture; status as of: 2026-10-23; window start: 2026-03-23
Other condition
availability: may be partially remitted only if conditions are met; not automatic; exclusions include: liquidity loans, specified EU/foreign co-funded loans, repayment <=48 months, some network investments without measurable ecological effect, and projects with under-25% of potential ecological effect; max for JST union and 100pct owned company: up to 40% under specified variants and indicator conditions; max for other beneficiaries: up to 30% under specified variants
Other condition
creditworthiness or accepted security required: True; liquidity loan repayment: refundable eligible costs must be repaid within 14 calendar days after beneficiary receives reimbursement; principal grace: up to 24 months on request; public aid rate: EC base rate + at least 1.1 percentage points; minimum 1.5% p.a.; repayment term: up to 10 years; may be extended to 15 years in justified cases on request; specified reduced rate: 0.6 × rate; minimum 1.0% p.a. for gminy with 2024 G index <=1300 and powiaty with 2024 P index <=250; standard rate: 0.9 × bill rediscount rate; minimum 1.5% p.a.
Other condition
grant instrument listed: False; instruments: loan; liquidity-preservation loan; max share of eligible costs percent: 100; multiple instruments require separate agreements: True; same task combined fund support max percent: 100
Other condition
Project location must be in Mazowieckie; Public procurement/competition and transparency rules apply to beneficiaries where applicable; 5-year durability from end date stated in funding contract; costs must be balanced; Fund costs must be post-application under signed agreement
Other condition
applicant employee remuneration as fund cost: expressly ineligible; general hiring ban: False; named staff roles: ; salary or unit pay rates: not specified in reviewed programme; staffing minimum or qualifications: not specified in reviewed programme
Amounts and costs3
Eligible cost
design documentation integral to the investment; earthworks and construction/installation works; geodetic services; investment supervision; other costs necessary to achieve the ecological effect
Eligible cost limit
100

For the same task, combined Fund support under the separately contracted listed forms may not exceed 100% of eligible costs; this aggregate ceiling is distinct from the loan-specific intensity.

Funding intensity
100

Loan only: maximum share of eligible project costs. This is a financing percentage, not a monetary cap or salary rate.

Source documents3
Call facts
Opens
23 Mar 2026
Provider
WFOŚiGW Warszawa
Checked
23 Oct 2026
Review status
Partial review
Reviewed
23 Oct 2026

This is a summary of the source page, not the official text. Eligibility, conditions and the submission system are at the source.