scindu funding
All calls

Sustainable and Competitive Cell Production Techniques for Lithium-ion And Sodium-ion Batteries (BATT4EU Partnership)

Horizon Europe · Grant topic

HORIZON-CL5-2027-02-D2-06

Summary

A Polish company can use this call for R&D.

Funds companies and researchers developing and demonstrating advanced battery manufacturing machinery and flexible pilot lines that reduce costs and environmental impacts.

Who can apply
Companies can lead: SME, large company, startup, research org, university.
Amount
€19M per projectTotal budget €37,800,000
Deadline
31 Mar 2027 02:00 CESTin 158 days
Status
Forthcomingopens 3 Dec 2026
Open on the portalRegister to keep this call

Machine-classified from the call text; check eligibility at the source.

Description

Expected Outcome:

Proposals are expected to contribute to all following points:

• Significantly enhanced competitiveness, resilience, and sustainability of the European battery cell manufacturing industry, achieving measurable reductions in capital expenditure (CAPEX), operational expenditure (OPEX), energy consumption, and environmental footprint compared to state-of-the-art processes.

• Demonstrated advanced manufacturing processes and equipment that substantially decrease battery production costs and improve overall production efficiency and battery quality.

• Established flexible and modular pilot production lines capable of efficiently transitioning between various battery chemistries and compositions, with demonstrated reduction in cross-contamination and effective management of sensitive materials.

Scope:

Proposals are expected to target the development and demonstration of innovative, next-generation battery cell manufacturing processes and machinery. These solutions are expected to explicitly focus on simultaneously achieving significant cost reductions and considerable decreases in energy consumption over the battery lifecycle, while maintaining or improving battery cell quality and sustainability metrics.

Proposals are expected to address all of the following:

• Demonstration of flexible, modular, and reconfigurable machinery to be integrated in manufacturing pilot lines that effectively accommodate transitions between various lithium-ion chemistries/compositions and sodium-ion chemistries.

• Development and demonstration novel mixing systems and novel electrode manufacturing techniques with advanced inline quality control

• Optimization of dry-room cell assembly processes, including the development and validation of advanced assembly equipment and techniques to significantly increase cell assembly throughput rates, reduce overall energy consumption associated with maintaining dry-room conditions, and enhance environmental controls

• Establishment of rapid and energy-efficient cell formation processes, significantly shortening formation and aging times compared to state of the art and enhancing quality assurance.

• Digitalisation of the production line, including in-line quality testing and identification of defects.

• Inclusion of comprehensive techno-economic assessments (TEA) and life-cycle analyses (LCA) to demonstrate clear environmental, economic, and scalability advantages over existing, state-of-the-art battery cell manufacturing practices.

The Commission initiative for Safe and Sustainable by Design[1] (SSbD) sets a framework for assessing the safety and sustainability of chemicals and materials which should be considered as a reference for project proposals.

Whenever the expected exploitation of project results entails developing, creating, manufacturing and marketing a product or process, or in creating and providing a service, the plan for the exploitation and dissemination of results must include a strategy for such exploitation. The exploitation plans are expected to include preliminary plans for scalability, commercialisation, and deployment (feasibility study, business plan) indicating the possible funding sources to be potentially used (in particular the Innovation Fund).

Proposals could consider the involvement of the European Commission's Joint Research Centre (JRC)[2] whose contribution could consist of performing experimental or desk-top research on battery performance or safety. For further information on the JRC’s possible contribution to the projects, please, search for additional publicly available information on the JRC’s website[3] (EU Science Hub) on the NCP portal, or request specific information from the JRC (JRC-NCP-Network@ec.europa.eu)

JRC will assure that all the other applicants receive the same information on the JRC’s possible contribution to the project (e.g., via the topic-specific FAQs under the Funding and Tenders Portal).

This topic implements the co-programmed European Partnership on Batteries (Batt4EU). As such, projects resulting from this topic will be expected to report on the results to the European Partnership on Batteries (Batt4EU) in support of the monitoring of its KPIs.

Technology Readiness Level - Technology readiness level expected from completed projects

Activities are expected to achieve TRL 6-7 by the end of the project – see General Annex B. Activities may start at any TRL.

[1] https://research-and-innovation.ec.europa.eu/research-area/industrial-research-and-innovation/key-enabling-technologies/chemicals-and-advanced-materials_en

[2] https://joint-research-centre.ec.europa.eu/laboratories-z/battery-energy-storage-testing_en

[3] JRC NCP | Horizon Europe NCP Portal

Who can apply, in detail
Applicant types
SME, Large company, Startup, Research org, University
Purpose
Research and innovation
R&D relevance
3 of 3
Poland eligible
Yes
Country limit
—
Region
Any
Consortium
Unclear
Readiness level (TRL)
—
Topics
  • Battery cell manufacturing
  • Lithium-ion batteries
  • Sodium-ion batteries
  • Modular pilot production
  • Low-cost manufacturing equipment

Machine-classified from the call text; check eligibility at the source. 23 Oct 2026

Conditions22

Typed facts extracted from the source documents by Scindu's grant-data review. Each value keeps its own conditions. Unknown means unstated, not zero or unlimited.

Applicant restriction
An entity established in an otherwise eligible country is ineligible to participate if it is directly or indirectly controlled by China or by a legal entity established in China.

Applies to both applicants and other action participants as the topic states “not eligible to participate”; does not resolve how any individual control case is assessed.

Consortium required
Yes

At least three mutually independent legal entities in different countries: at least one in an EU Member State and two others in different EU Member States or Associated Countries. Affiliates do not count toward the minimum.

Other condition
Innovation Action (IA).
Other condition
When satellite-based Earth observation, positioning/navigation or timing data/services are used, beneficiaries must use Copernicus and/or Galileo/EGNOS; other sources may additionally be used.
Other condition
The applicable Horizon Europe MGA describes the action grant as budget-based mixed actual cost: based on actual costs incurred, while allowing other funding forms such as unit costs/contributions, flat-rate costs/contributions, lump sums or financing not linked to costs. The topic-specific legal/financial section directs applicants to General Annex G; it does not name a separate grant form in the reviewed topic provisions.

The final grant agreement and approved Annex 2 specify the applicable budget categories and funding forms. Do not treat the estimate as a salary entitlement or assume every category is reimbursed only as an actual cost.

Other condition
The table expects around 2 projects to be funded under this topic. This is an indicative planning count, not a consortium-size rule or guaranteed award number.

Scope: expected funded projects, not beneficiaries, consortium members or awards guaranteed.

Other condition
Proposals could consider JRC involvement for experimental or desk-top battery-performance or safety research; JRC will ensure other applicants receive the same information about its possible contribution.
Other condition
JRC participation may be as a zero-funded beneficiary or associated partner after selection; it does not participate in proposal preparation or submission.
Other condition
Proposals are expected to establish rapid and energy-efficient cell-formation processes that significantly shorten formation and aging times compared with the state of the art and enhance quality assurance.

This is one of the six topic scope bullets that proposals are expected to address.

Other condition
The granting authority may object to transfer of ownership or exclusive licensing of results for up to four years after the action ends, under the specified Annex 5 provision.
Other condition
The Commission’s Safe and Sustainable by Design initiative should be considered as a reference for project proposals.
Other condition
Expected outcomes include measurable reductions in CAPEX, OPEX, energy use and environmental footprint; advanced manufacturing processes/equipment that lower production cost and improve efficiency/quality; and flexible modular pilot lines enabling chemistry transitions while reducing cross-contamination and managing sensitive materials.
Other condition
Proposals are expected to develop and demonstrate next-generation battery cell manufacturing processes and machinery, targeting cost reductions and lower energy use while maintaining/improving quality and sustainability.
Other condition
Proposals are expected to demonstrate flexible, modular and reconfigurable pilot-line machinery supporting transitions across lithium-ion compositions and sodium-ion chemistries.
Other condition
Proposals are expected to develop and demonstrate novel mixing and electrode-manufacturing techniques with advanced inline quality control.
Other condition
Proposals are expected to optimize dry-room assembly, validating equipment and techniques to increase throughput, reduce dry-room energy use and improve environmental controls.
Other condition
If the expected exploitation involves developing, creating, manufacturing or marketing a product or process, or creating/providing a service, the exploitation and dissemination plan must include an exploitation strategy. The plans are expected to include preliminary scalability, commercialisation and deployment plans, and possible funding sources (particularly the Innovation Fund).
Other condition
Proposals are expected to digitalise the production line, including inline quality testing and defect identification.
Other condition
Proposals are expected to include comprehensive TEA and LCA demonstrating environmental, economic and scalability advantages.
Other condition
Projects are expected to report results to Batt4EU to support monitoring partnership KPIs.
Technology readiness level at end, maximum
7 TRL

Upper endpoint of the expected end-of-project TRL 6–7 range; not a hard ceiling on project ambition.

Technology readiness level at end, minimum
6 TRL

Lower endpoint of the expected end-of-project TRL 6–7 range; activities may start at any TRL. This is an expected range, not a separately stated mandatory floor.

Amounts and costs12
Indicative budget
€37,800,000

Topic budget as stated in the portal's budget table. Lump-sum and per-project limits are in the call conditions.

Eligible cost
Direct-contract natural persons and paid third-party secondments may qualify when assigned to the action, working under employee-like conditions, results belong to the beneficiary unless agreed otherwise, and cost corresponds to actual cost without significant difference from comparable employees. No call-specific position or salary is stated.
Eligible cost
Employee personnel costs are eligible only for beneficiary personnel assigned to the action, employed under contract or equivalent appointing act, and meeting general eligibility conditions. Under the standard actual-cost method the rate is calculated from actual personnel costs and declared action days; the MGA specifies 215 days in the annual-rate formula and requires declared days to be identifiable and verifiable. No topic-specific job, salary amount, headcount or wage entitlement is stated.
Eligible cost
Under the MGA default equipment option, action-used equipment/infrastructure/assets are declared as depreciation based on actual incurred cost and the beneficiary’s accounting practices; only the share corresponding to actual use during the action is eligible. Renting/leasing has its separate MGA condition. The topic pages do not set a special full-purchase-cost option.
Eligible cost
For the actual-cost components of the mixed grant, costs must be incurred by the beneficiary during the action period, declared in an eligible budget category, connected to and necessary for the action, identifiable and verifiable in the accounts, compliant with national tax/labour/social-security law, and reasonable, justified and consistent with sound financial management.
Eligible cost
Indirect costs use the General MGA flat rate of 25% of eligible direct costs, excluding volunteer costs, subcontracting, financial support to third parties and any exempt specific categories. This is an indirect-cost calculation rule, not 25% additional direct-cost funding or a call allocation.
Eligible cost
Action purchases must meet general eligibility rules and usual purchasing practices ensuring best value for money (or lowest price where appropriate) and no conflict of interest. Travel, accommodation and subsistence use actual costs under usual travel practices; other goods, works and services are based on actual costs. Contracting authorities/entities must also follow applicable procurement law.
Eligible cost
Unpaid SME owners and natural-person beneficiaries may declare personnel only under the Annex 2a unit-cost method and general eligibility rules; no topic-specific wage or hiring entitlement is stated.
Eligible cost
Action subcontracting is eligible on actual-cost basis when it meets general eligibility rules and is awarded under the beneficiary’s usual purchasing practices ensuring best value for money (or lowest price where appropriate) and no conflict of interest. Any applicable limits are determined by the signed grant and action conditions; no topic-specific subcontracting cap is stated in these pages.
Funding intensity, maximum
70 percent of eligible costs

Maximum for for-profit entities under IA; non-profit legal entities may receive up to 100%, represented in a separate scoped fact.

Funding intensity, maximum
100 percent of eligible costs

Only for eligible non-profit legal entities under the Innovation Action; the general maximum for other entities is 70%. Final rate fixed in grant agreement.

Expected contribution per project
€18,900,000

Commission estimate of EU contribution per project; different requested amounts are not precluded. Indicative, not a floor, cap or guarantee.

Topic allocation
€37,800,000

Indicative topic allocation, distinct from per-project estimated EU contribution and individual grant amount.

Personnel and services3
  • MGA cost category, not a call-promised hire.

    Other role · Staff cost the grant can fund

    MGA personnel-category route only; assigned to the action, employee-like work conditions, beneficiary ownership of results unless otherwise agreed, actual incurred cost rate not significantly different from comparable employees.

  • MGA cost category, not an advertised role.

    Other role · Staff cost the grant can fund

    Personnel cost category only. Must be assigned to the action and meet MGA Article 6; no hire, headcount or salary entitlement is implied.

  • Conditional cost category, not an advertised role.

    Other role · Staff cost the grant can fund

    Conditional personnel cost category using the specified unit-cost method and general eligibility rules; no topic-specific wage or role entitlement.

Source documents4
Call facts
Opens
3 Dec 2026
Deadline model
Single-stage
Programme
Horizon Europe · 2021 - 2027
Call
HORIZON-CL5-2027-02 · BATTERIES and ENERGY
Types of action
HORIZON Innovation Actions
Checked
24 Oct 2026
Portal updated
7 Oct 2026
Review status
Partial review
Reviewed
23 Oct 2026

This is a summary of the source page, not the official text. Eligibility, conditions and the submission system are at the source.