scindu funding
All calls

Renewable Energy Valleys in Africa to increase energy security and energy access in Africa

Horizon Europe · Grant topic

HORIZON-CL5-2027-02-D3-10

Summary

A Polish company can use this call for R&D.

Supports renewable energy valleys in Africa to improve local energy access, system performance and affordability through EU–Africa cooperation.

Who can apply
Companies can lead: SME, large company, research org, university.
Amount
€4.5M per projectTotal budget €9,000,000
Deadline
31 Mar 2027 02:00 CESTin 158 days
Status
Forthcomingopens 3 Dec 2026
Open on the portalRegister to keep this call

Machine-classified from the call text; check eligibility at the source.

Description

Expected Outcome:

Project results are expected to contribute to all of the following expected outcomes:

• Strengthening of the joint EU-AU Climate Change and Sustainable Energy Collaborative Partnership efforts, with emphasis on improving the visibility of EU Science Diplomacy actions in Africa and supporting Global Gateway Strategy priorities.

• Acceleration of the achievements of the African countries’ targets of the Paris Agreement.

• Increase the roll-out of local or regional renewable energy system solutions for electricity, heat and fuel needs and contribute to a fair trade between Africa and Europe.

• Create new sustainable silks and jobs linked to local or regional renewable energy system value chains and enhance economic growth in local or regional African communities.

• Increase the readiness, reliability, performance and affordability of local or regional renewable energy system solutions in Africa.

Scope:

Renewable energy valleys are understood as decentralised renewable energy systems that offer a viable and efficient solution to the challenges mentioned above. For example, local production and consumption, reduced transmission and distribution losses thanks to the reliance on local networks for energy needs, greater operational flexibility and reduced dependence on expensive fuel imports all contribute to a higher energy autonomy, a more secure supply, and lower, more stable overall energy costs, including for individual citizens. In addition, this alleviates a part of the load on the centralised grid and avoids blockages by the capacity of the grid.

The action should cover either urbanised or rural contexts in Africa. It should contribute to providing sustainable renewable energy access and creating other socio-economic benefits, such as improved health, economic wealth, skills and jobs, while reducing the stress on the environment, notably on biodiversity, adopting a Water Energy Food Ecosystem (WEFE) Nexus approach and following methods of the circular economy [1].

Actions are expected to cover the design, construct, commission and operate the demonstration installation, including aspects of energy needs and energy consumption, of grid stability and grid reinforcement in the region concerned. Actions should also develop and implement a tailored value chain approach, identifying the most suitable manufacturing value chains, on the basis of the local context, local material supply chain(s) and local workforce, with the objective of ensuring sustainable local economic development. A gender sensitive approach could further support the activities, taking into account relevant groups in a vulnerable situation such as rural communities, and women.

African SMEs are expected to play an important role in the overall value chain and to contribute in the identifying the needs. Participation of EU private sector actors should also be encouraged in alignment with the priorities of Global Gateway Strategy. Actions should also include the identification of technical, vocational and educational needs of the workforce and propose relevant training and qualification activities. Actions should finally define a market and business strategy that could take into consideration funding from European and international financial instruments and development finance programmes to ensure impact through a quick and viable commercial take-up of the technological solution demonstrated.

Social innovation should be considered. The business plan is expected to include appropriate consideration of available financial support instruments (local, regional and/or international) to enhance the speedy market deployment of the solution. The aspects of regulatory environment and local communities’ governance needs and/or impacts are also to be considered.

Proposals are expected to include a life cycle analysis showing the impact of the proposed solutions when compared to other technologies/solutions on the environment, on climate change targets and on the social and the economic dimensions, taking a cradle to grave viewpoint, encompassing the design and the operation phases. The life cycle analysis should take a cradle to grave approach. Proposals should adopt a circular economy approach. Whenever negative impacts have been identified, mitigations measures are expected.

As the demonstration installation will be located in Africa, relevant African partners have to participate in the implementation of the project. A balanced involvement in the activities of the projects of European and African partners will be considered an asset in the evaluation. Actions should also participate in and contribute to the African Union[2] - European Union collaborative research action on Climate Change and Sustainable Energy, in particular through cooperation/collaboration with the project LEAP-SE (www.leap-re.eu). Alignment with Global Gateway ongoing activities on renewable energy in Africa should be also prioritized, including the collaboration with EU Delegation and EU private sector actors in Africa, as well as with the Partnership on Food and Nutrition Security and Sustainable Agriculture (FNSSA) and Cluster 6’s topic HORIZON-CL6-2027-02-FARM2FORK-02-two-stage.

Lesson learned from the implementation of European Renewable Energy Valleys projects should be considered. These projects are REFORMERS[3] and CRETE VALLEY[4].

Proven access to necessary land and / or permits for operation at the time of application and / or convincing risk management regarding delayed availability of land or permits are expected in the proposal.

Technology Readiness Level - Technology readiness level expected from completed projects

Activities are expected to achieve TRL 8 by the end of the project – see General Annex B. Activities may start at any TRL.

[1] For an example of a methodology for the assessment of sustainability, circularity and contribution the EU resilience and technological autonomy of clean energy technology in the R&I pipeline, please see Study on circular approaches for a sustainable and affordable clean energy transition

[2] “African Union member states” includes countries whose membership has been temporarily suspended.

[3] https://cordis.europa.eu/project/id/101136211

[4] https://cordis.europa.eu/project/id/101136139

Who can apply, in detail
Applicant types
SME, Large company, Research org, University
Purpose
Research and innovation
R&D relevance
2 of 3
Poland eligible
Yes
Country limit
—
Region
Any
Consortium
Unclear
Readiness level (TRL)
—
Topics
  • Renewable energy valleys
  • Decentralised energy systems
  • Energy access in Africa
  • Renewable heat and fuels

Machine-classified from the call text; check eligibility at the source. 23 Oct 2026

Conditions15

Typed facts extracted from the source documents by Scindu's grant-data review. Each value keeps its own conditions. Unknown means unstated, not zero or unlimited.

Applicant restriction
Entities established in an otherwise eligible country but directly or indirectly controlled by China or by a legal entity established in China are not eligible to participate in this action.

Topic-specific General Annex B critical-technology restriction; it concerns participation, not merely eligibility for Union funding.

Consortium required
Yes

Unless the specific topic conditions provide otherwise, the consortium must include at least three legal entities as beneficiaries, independent from one another and each established in a different country: at least one independent legal entity in an EU Member State and at least two other independent legal entities each in different EU Member States or Associated Countries. Affiliated entities do not count toward any minimum consortium-composition criterion. This is the General Annex B default for this IA topic.

Other condition
The Work Programme classifies this topic as a Innovation Action.
Other condition
African SMEs are expected to play an important role in the overall value chain and in identifying needs.
Other condition
At least two legal entities established in at least two different African Union member states must be beneficiaries in the consortium. This is a topic-specific minimum, not a requirement that all consortium members be African.
Other condition
Legal entities established in all African Union member states are exceptionally eligible for Union funding under this topic.
Other condition
31 March 2027 at 17:00 Brussels local time, as stated for this call in the Work Programme overview.
Other condition
When a project uses satellite-based Earth observation, positioning, navigation and/or related timing data or services, beneficiaries must use Copernicus and/or Galileo/EGNOS; other data and services may also be used.
Other condition
The call overview indicates around 2 project(s) expected to be funded for this topic. This is a planning estimate, not a guaranteed award count or consortium-size rule.

This expected project count is an indicative planning estimate, not a guaranteed number of awards or a consortium-size rule.

Other condition
The proposal is expected to show proven access to necessary land and/or permits for operation at application, or convincing risk management of delays.

For the Quality and efficiency of the implementation criterion, demonstrated access to necessary land and/or permits at application, or convincing risk management of delayed availability, is a major element. The proposal is expected to show proven access or convincing delay-risk management; such risk management may include a mid-term go/no-go decision. This does not assert permits must already have issued in every proposal.

Other condition
renewable energy valleys are decentralised renewable energy systems designed to provide local/regional energy solutions
Other condition
the action should cover urbanised or rural African contexts and demonstrate a locally tailored installation
Other condition
proposals are expected to include a cradle-to-grave life-cycle analysis and a circular-economy approach
Partner requirement
Because the demonstration installation is in Africa, relevant African partners must participate in project implementation; balanced involvement of African and European partners is an evaluation asset.
Technology readiness level at end, minimum
8 TRL

The topic states that activities are expected to reach TRL 8 by project end; it does not set a separate maximum TRL, and activities may start at any TRL.

Amounts and costs4
Indicative budget
€9,000,000

Topic budget as stated in the portal's budget table. Lump-sum and per-project limits are in the call conditions.

Funding intensity, maximumnon-profit legal entity beneficiaries
100 percent of eligible costs per beneficiary

General Annex G allows this entity-category maximum for Innovation Actions; it is not a grant guarantee. For lump-sum grants the rate is already applied in the amount methodology.

Funding intensity, maximumbeneficiaries other than non-profit legal entities
70 percent of eligible costs per beneficiary

General Annex G maximum for Innovation action. For lump-sum/unit grants, funding rate is applied through the amount-setting methodology rather than shown as a separate rate in the grant agreement.

Expected contribution per project
€4,500,000

Commission estimate of EU contribution per project for this exact topic, taken from the full own-topic overview row and the column heading identifying amounts in EUR millions. The Work Programme expressly says this estimate does not preclude proposals requesting different amounts; it is not a fixed ceiling, floor, guarantee, or the topic allocation.

Topic allocation
€9,000,000

Indicative budget allocated to this individual topic; not a per-project grant cap.

Personnel and services1
  • Other role

    Staff cost the grant can fund

    Horizon MGA Annex 2 identifies employees, natural persons under direct contracts and seconded persons as personnel cost categories; employee costs must relate to personnel working for the beneficiary under an employment contract/equivalent appointing act and assigned to the action. This is an eligible cost category, not a required hire or salary entitlement. The topic page does not state job titles, headcount, pay rates or payroll caps.

Source documents4
Call facts
Opens
3 Dec 2026
Deadline model
Single-stage
Programme
Horizon Europe · 2021 - 2027
Call
HORIZON-CL5-2027-02 · BATTERIES and ENERGY
Types of action
HORIZON Innovation Actions
Checked
24 Oct 2026
Portal updated
7 Oct 2026
Review status
Partial review
Reviewed
23 Oct 2026

This is a summary of the source page, not the official text. Eligibility, conditions and the submission system are at the source.