scindu funding
All calls

Support to the implementation of an EU policy framework for CO2 transport and storage infrastructure

Horizon Europe · Grant topic

HORIZON-CL5-2027-05-D3-31

Summary

Not an R&D call a Polish company can use, by Scindu's rule.

Funds stakeholder support for implementing CO2 infrastructure policy, covering regulation, interoperability, market structures, investment incentives and infrastructure repurposing.

Who can apply
Companies can lead: SME, large company, startup, research org, university, public body.
Amount
€5M per projectTotal budget €5,000,000
Deadline
15 Sept 2027 02:00 CESTin 326 days
Status
Forthcomingopens 5 May 2027
Open on the portalRegister to keep this call

Machine-classified from the call text; check eligibility at the source.

Description

Expected Outcome:

Project results are expected to contribute to the following outcome:

• Stakeholders involved in the CO2 infrastructure network are in a position to implement the upcoming legislative framework for CO2 infrastructure.

Scope:

The project is expected to assist stakeholders involved in the CO2 infrastructure network in implementing the upcoming legislative framework for CO2 infrastructure.

Issues to address include market and cost structure, cross-border integration, interoperability and planning, technical harmonisation and investment incentives for new infrastructure, third-party access, along-chain liability, competent regulatory authorities, tariff regulation, ownership and contractual models, baseline of the state of play of current legislation on various aspects of the value chain.

As part of the deliverables, the project is expected to review and report on the current state of play concerning the challenges of repurposing existing infrastructure for CO2, also taking into account the infrastructure needs of renewable gases. Important issues to analyse include technical feasibility, costs, synergies between new (multimodal) CO₂ infrastructure and existing systems, regulatory barriers to integrating CO₂ infrastructure with industrial clusters, CO2 quality, flexibility, robustness, and interconnections between CO2 and energy infrastructures.

Who can apply, in detail
Applicant types
SME, Large company, Startup, Research org, University, Public body
Purpose
Other
R&D relevance
1 of 3
Poland eligible
Yes
Country limit
—
Region
Any
Consortium
Unclear
Readiness level (TRL)
—
Topics
  • CO2 transport infrastructure
  • Carbon storage regulation
  • Infrastructure interoperability
  • Cross-border market frameworks

Machine-classified from the call text; check eligibility at the source. 23 Oct 2026

Conditions7

Typed facts extracted from the source documents by Scindu's grant-data review. Each value keeps its own conditions. Unknown means unstated, not zero or unlimited.

Consortium required
No

For this Coordination and Support Action, General Annex B permits applications by one or more legal entities established in a Member State or Associated Country; therefore a multi-beneficiary consortium is not a general minimum under this baseline. Any stricter exact topic-specific restriction or required partner type recorded in this packet remains applicable. “False” means a single eligible legal-entity applicant is allowed under the baseline, not that partnerships are forbidden.

Other condition
The Work Programme classifies this topic as a Coordination and Support Action.
Other condition
If satellite-based Earth-observation, positioning, navigation or related timing data/services are used, beneficiaries must use Copernicus and/or Galileo/EGNOS; other services may additionally be used.
Other condition
Stakeholders involved in the CO2 infrastructure network should be able to implement the upcoming legislative framework for CO2 infrastructure.
Other condition
Call overview lists around EUR 5,000,000 per project and around 1 expected project(s); both are indicative and do not guarantee an award or set a recipient cap.
Other condition
For a Type 2 detailed-budget lump sum, the guide requires per-beneficiary/affiliated-entity and per-work-package estimates by cost category; estimates must follow normal practices, be reasonable and non-excessive, and be necessary for the proposed activities.

The source identifies lump-sum form but not a specific subtype; Type 2 guidance is conditional and is not proof this call uses a Type 2 detailed budget.

Other condition
Assist stakeholders in implementing the forthcoming CO2-infrastructure framework. Address market and cost structure; cross-border integration/interoperability/planning; harmonisation/investment incentives; third-party access/liability/regulators/tariffs/ownership/contracts; baseline legislation; and review/report on repurposing existing infrastructure, renewable-gas needs, technical feasibility/costs/synergies, regulatory barriers, CO2 quality/flexibility/robustness and CO2-energy interconnections.
Amounts and costs6
Indicative budget
€5,000,000

Topic budget as stated in the portal's budget table. Lump-sum and per-project limits are in the call conditions.

Eligible cost limit
25 percent flat rate of eligible direct costs, subject to the base exclusions in conditions

Horizon Europe General Annex G describes a 25% indirect-cost flat rate on eligible direct costs, excluding eligible direct subcontracting costs, financial support to third parties, and any unit costs or lump sums that include indirect costs. For HORIZON-AG actual-cost grants this is a cost-calculation rule, not a grant-rate increase. For HORIZON-AG-LS it informs the underlying eligible-cost estimate only; it is not an additional payment on top of the fixed lump sum. The topic indicative allocation and per-project contribution are distinct from this cost rate.

Eligible cost limitMGA eligible direct cost categories A–D subject to exclusions
25 percent of eligible direct costs

This is an underlying cost rule for the lump-sum model, not a separate cash reimbursement; excluded cost categories and operating-grant condition apply.

Funding intensity, maximumCoordination and Support Action beneficiaries under this action
100 percent of eligible costs per beneficiary

Maximum funding rate under General Annex G; it is not an award guarantee. For the lump-sum model the rate is applied through amount-setting methodology, not separate payroll reimbursement.

Funding intensity, maximum
100 percent of eligible costs (general Coordination and Support Action maximum)

The exact Work Programme labels this topic a Coordination and Support Action. General Annex G gives CSA a 100% maximum; no separate topic rate was identified in this topic’s Specific conditions. This is not a guarantee or the topic-level indicative EU contribution; the final rate is fixed in the grant agreement. For the lump-sum topic, the rate is already applied in the methodology and is not an extra multiplier.

Expected contribution per projectCommission estimate for this specific topic; no minimum/maximum cap
€5,000,000

Work Programme expressly allows different amounts; the estimate is not a minimum, maximum or guarantee.

Topic allocationTopic-level budget allocation; not per-project award amount
€5,000,000

Indicative budget is subject to EU appropriations and is not an award guarantee.

Personnel and services3
  • Other role

    Staff cost the grant can fund

    Underlying cost-estimate category only if permitted in the applicable lump-sum model; not a named position, vacancy, guaranteed headcount or salary entitlement. The grant amount is not separate actual-payroll reimbursement. MGA A.2/A.3 requires action assignment, employee-like working conditions, result ownership unless otherwise agreed, and rates based on actual incurred cost not significantly different from similar employees.

  • Other role

    Staff cost the grant can fund

    Underlying cost-estimate category only if permitted in the applicable lump-sum model; not a named position, vacancy, guaranteed headcount or salary entitlement. The grant amount is not separate actual-payroll reimbursement. MGA A.1 covers eligible employees assigned to the action and calculates salary costs under Article 6.2 A.1.

  • Other role

    Staff cost the grant can fund

    Underlying cost-estimate category only if permitted in the applicable lump-sum model; not a named position, vacancy, guaranteed headcount or salary entitlement. The grant amount is not separate actual-payroll reimbursement. Only unpaid SME owners or unpaid natural-person beneficiaries may use the Article 6.2 A.4 unit-cost method under Annex 2a, subject to general eligibility rules.

Source documents4
Call facts
Opens
5 May 2027
Deadline model
Single-stage
Programme
Horizon Europe · 2021 - 2027
Call
HORIZON-CL5-2027-05 · BATTERIES and ENERGY
Types of action
HORIZON Coordination and Support Actions
Checked
24 Oct 2026
Portal updated
7 Oct 2026
Review status
Partial review
Reviewed
23 Oct 2026

This is a summary of the source page, not the official text. Eligibility, conditions and the submission system are at the source.