Assessing the effect of airport operations on air quality and noise in nearby communities
Horizon Europe · Grant topic
Summary
A Polish company can use this call for R&D.
Funds companies and researchers assessing airport impacts on nearby air quality, noise, water and biodiversity through monitoring, testing and improved emissions data.
- Who can apply
- Companies can lead: SME, large company, startup, research org, university.
- Amount
- €3.5M per projectTotal budget €7,000,000
- Deadline
- 14 Apr 2027 02:00 CESTin 172 days
- Status
- Forthcomingopens 15 Dec 2026
Machine-classified from the call text; check eligibility at the source.
Description
Expected Outcome:
Project results are expected to contribute to all of the following expected outcomes:
• Assessment of the impact of airport operations on air quality and water bodies (including biodiversity) through air quality measurements and monitoring at different spots in and around the airports as well as through in vitro testing and/or remote sensing for water quality in airports close to water bodies
• Contributing to the delivery of better emission factors for emissions inventories and projections (including EMEP), especially for species and fuel mixtures for which little knowledge exists today in order to support local, regional, national and international emissions reduction plans (e.g. Noise Plans, Air Quality Roadmaps, Air Quality Plans, national Air Pollution Control Programmes, as mentioned in EU acquis) by providing real-world emission information and measuring the actual impact of control measures and strategies.
• Recommendations for improved measurement certification and testing to better cover real world situations.
• Develop a methodology to assess the health impact (both the nature, seriousness and number of people at risk) of the measured pollutants and noise in airports or at the nearby urban environment and apply it to the test sites.
Scope:
Aviation emissions not only have an impact on climate change and on GHG emissions but also on-air quality as it is recognized that airport-related sources of emissions release pollutants that can contribute to the degradation of air quality of their nearby communities. As such, air quality and noise issues in the vicinity of airports need to be investigated, quantified and addressed. Airports operations can generate water pollution due to their extensive handling of jet fuel and de-icing chemicals, which, if not contained, can contaminate nearby water bodies. Similarly, attention must be given to other possible airport-related environmental impacts associated with noise, water quality, and local ecology in the vicinity of airports.
In order to address these issues, the following R&I actions should be undertaken:
• Comprehensive real time and real-world measurements of pollutant (exhaust and non-exhaust, including resuspension of dust) and noise emissions. The sources of emissions should be differentiated, and the pollutants identified. Operations should include ground operations, landing and take-off (including emissions from tyres and brakes) and assessing exhaust emission during cruising, including impact of changes in flight altitude on engine performance parameters (stationary engine tests). The calibration of the measurement systems and the reproducibility of the results should be demonstrated.
• Pilot testing in 2 different airports (possibility as well for testing on other complex transport nodes) for proof of concept with the aim of increasing scalability and replicability for other similar environments. Proposals are expected to select specific airports that are in vicinity of urban/rural communities and close to water streams/bodies, to examine and quantify the effect of airport emissions on air quality, noise and water bodies.
• Investigation of the adverse health and environmental effects (including biodiversity) of particle emissions, NOx, and non-regulated emissions (e.g. black carbon, tyre and brake particles, secondary organic aerosols, etc.) generated from aircraft and airport operations. The analysis should be supported by gender disaggregated data collection and intersectional analysis.
• Estimates of the impact of APUs (Auxiliary Power Unit) or GPUs (Ground Power Units) to stationary aircrafts’ emissions (GHG, air pollutants and noise) compared to conventional operation.
Proposals should consider the results from previously EU funded projects such as AVIATOR, nPETS, TUBE, ANIMA , NEEDED or any other similar projects.
To assess the effects of airport operations on air quality in nearby communities, proposals may consider involving the Forum for Air Quality Modelling (FAIRMODE), a JRC-led forum fostering air quality modelling improvement and robust benchmarking, and the JRC tool SHERPA (Screening for High Emission Reduction Potential on Air), an integrated assessment model to plan local emission reduction policies.
Technology Readiness Level - Technology readiness level expected from completed projects
Activities are expected to achieve TRL 5-6 by the end of the project – see General Annex B. Activities may start at any TRL.
Who can apply, in detail
- Applicant types
- SME, Large company, Startup, Research org, University
- Purpose
- Research and innovation
- R&D relevance
- 3 of 3
- Poland eligible
- Yes
- Country limit
- —
- Region
- Any
- Consortium
- Unclear
- Readiness level (TRL)
- —
- Topics
- Airport air quality
- Aircraft noise impacts
- Water quality monitoring
- Emission measurement
Machine-classified from the call text; check eligibility at the source. 23 Oct 2026
Conditions
Typed facts extracted from the source documents by Scindu's grant-data review. Each value keeps its own conditions. Unknown means unstated, not zero or unlimited.
- Applicant type
- Unless the call/topic provides otherwise, consortium beneficiaries must include at least three independent legal entities established in different countries: one in an EU Member State and two others in different EU Member States or Associated Countries. No topic-specific consortium-size exception was identified in this reviewed topic section.
- Application restriction
- The MOBILITY call is scheduled to open 15 December 2026 and close 14 April 2027; the Work Programme states deadlines are 17:00 Brussels local time. This call window is scheduled, not evidence that applications are currently accepted.
- Consortium required
- Yes
- Eligible project scope
- Assess airport-operation effects on air quality, noise, water bodies and nearby health/ecology. Scope calls for pilot testing in two different airports, selected near communities and water bodies/streams, alongside real-world measurements and impact evaluation.
- Other condition
- The topic calls for pilot testing at two different airports; it separately allows testing on other complex transport nodes.
- Other condition
- The call overview indicates around 2 project(s) expected to be funded for this topic. This is a planning estimate, not guaranteed awards or a binding consortium/project-count condition.
- Partner requirement
- The Joint Research Centre may participate after selection as a zero-funded beneficiary or associated partner, and will not participate in proposal preparation/submission.
- Technology readiness level at end, maximum
- 6 TRL
Expected end-of-project level range; activities may start at any TRL.
- Technology readiness level at end, minimum
- 5 TRL
Expected end-of-project level; activities may start at any TRL. This is the topic expectation, not an applicant past-performance qualification.
Amounts and costs
- Indicative budget
- €7,000,000
Topic budget as stated in the portal's budget table. Lump-sum and per-project limits are in the call conditions.
- Call allocation
- €131,000,000
Overall indicative CL5-2027-03 call-pool budget, not a per-project or per-beneficiary award; subject to availability of EU appropriations.
- Eligible cost
- If a project uses satellite-based Earth observation, positioning, navigation and/or related timing data/services, beneficiaries must use Copernicus and/or Galileo/EGNOS; other data/services may also be used.
- Eligible cost
- Personnel may be included as estimated cost categories in the lump-sum proposal budget, not separately reimbursed as actual payroll. Cost estimates must approximate actual costs, follow beneficiaries’ normal practices, be reasonable/non-excessive, align with proposed activities, and satisfy Horizon Europe basic eligibility rules.
- Eligible cost
- Eligible costs are funded as a lump sum. Under the Lump Sum MGA, contributions are eligible only when amounts are set out in Annex 2, work packages are completed, and work is properly implemented/results achieved in accordance with Annex 1 during the action period. This is payment by completed work package, not actual-cost reimbursement.
- Funding intensity, maximum
- 100 percent_of_eligible_costs
Maximum Horizon Europe funding rate for this action type is 100% under General Annex G; the topic does not state a different rate. For lump-sum/unit grants, the rate is applied through the amount-setting methodology.
- Expected contribution per project
- €3,500,000
Commission estimate of EU contribution per project; not a fixed ceiling or floor, and different requested amounts are not precluded.
- Topic allocation
- €7,000,000
Indicative topic budget pool. It is distinct from the per-project expected contribution and is not an individual beneficiary award.
Personnel and services
Other role
Staff cost the grant can fund
Source documents
- Horizon Europe Work Programme 2026–2027, Part 8: Climate, Energy and Mobility
- Horizon Europe Work Programme 2026–2027 General Annexes
- EU Grants: Horizon Europe Model Grant Agreement, Multi & Mono, V1.2 01.06.2026
- EU Grants: How to manage your lump sum grants, V1.5, 01.06.2026
- EU Grants: Lump Sum Model Grant Agreement, Multi & Mono, V1.0
Call facts
- Opens
- 15 Dec 2026
- Deadline model
- Single-stage
- Programme
- Horizon Europe · 2021 - 2027
- Call
- HORIZON-CL5-2027-03 · MOBILITY
- Types of action
- HORIZON Research and Innovation Actions
- Source
- ec.europa.eu
- Checked
- 24 Oct 2026
- Portal updated
- 7 Oct 2026
- Review status
- Partial review
- Reviewed
- 23 Oct 2026
This is a summary of the source page, not the official text. Eligibility, conditions and the submission system are at the source.