Demonstrating transformative solutions to increase cross-border climate resilience
Horizon Europe · Grant topic
An independent quality check has put this review on hold. The structured terms below are kept as history and are not cleared; read the official documents.
Summary
A Polish company can use this call for R&D.
Funds development and demonstration of cross-border climate resilience solutions benefiting neighbouring regional and local authorities; applicant eligibility is unspecified.
- Who can apply
- Unclear from the source.
- Amount
- €10M – €15M per projectTotal budget €72,323,812
- Deadline
- 21 Sept 2027 02:00 CESTin 332 days
- Status
- Forthcomingopens 9 Feb 2027
Machine-classified from the call text; check eligibility at the source.
Description
Expected Outcome:
In support to the implementation of the EU Adaptation Strategy, the EU Mission on Adaptation to Climate Change and the EU Preparedness Union Strategy and contributing to the upcoming European Climate Action Plan, project results are expected to improve adaptative capacities of European internal border regional and local authorities, allowing them to jointly address with their neighbours the pressing climate risks.
Projects results should contribute to all of the following outcomes:
• Climate resilience solutions for cross-border risks have been developed and demonstrated. This includes social, governance or nature-based solutions.
• Regional and local authorities from each side of country borders are better prepared to withstand jointly the impacts of climate change, including systemic risks and cascading effects.
• National, regional and local authorities are taking on shared responsibilities and are actively involved in the development and testing of innovative solutions to deal with cross-border climate risks.
Scope:
Rationale
Cross-border risks[1] and cooperation are crucial in the European Union, where 37.5% of the EU population lives in border areas, spanning 38 intra-EU borders that often involve both administrative and linguistic divides[2]. While adaptation plans are usually prepared within a single territory (e.g. at national, regional or local levels), climate risks do not stop at the borders. For instance, around 70% of Europe's freshwater bodies are part of international river basins, making flooding and droughts typical cross-border risks. Similarly, wildfires pose a significant cross-border threat, as they can spread rapidly across national borders, affecting multiple countries simultaneously. The same applies to cross-border coastal areas affected by sea level rise and coastal erosion.
At the regional and local level, the implementation of adaptation tends to be fragmented between different bodies such as managers of forests, water, protected areas or coastlines. To be truly resilient, European regional and local authorities therefore need to integrate their action with their neighbours and consider seriously the cross-border dimension of climate risks.
Solutions sought
Proposals should develop, test and demonstrate approaches and innovative solutions relevant for cross-border risks, leading to an increase of climate resilience in cross-border regions.
Moreover, particular attention should be given to coordination between the national and regional governance aspects of the bordering regions. Services to better predict, monitor and report on cross-border climate events should be explored as a first step.
The proposals should address all of the following aspects:
• Address at least one relevant cross-border climate risk (e.g. water scarcity, flooding, storms, wildfires, sea level rise) but are strongly encouraged to address risks systemically and to cover cascading and compound risks as well as risks emerging from the degradation of ecosystem services;
• Develop, and demonstrate a common classification of the climate risks and define what level of risks are acceptable across the national border.
• Develop and demonstrate innovative integrated solutions to make both sides of the border climate resilient. Those solutions should cover cross-border governance and/or socio-economic aspects (but are not limited to that). Nature-based solutions and ecosystem-based adaptation should be explored as a priority, in line with the Mission Implementation Plan.
• For the successful implementation of the solutions and to ensure their sustainability beyond the duration of the project, the development and testing of the proposed solutions should be embedded, as much as possible in the adaptation planning of the regional or local authority participating in the project and/or in national plans.
This topic requires the effective contribution of SSH disciplines and the involvement of SSH experts, institutions as well as the inclusion of relevant SSH expertise, in order to produce meaningful and significant effects enhancing the societal impact of the related research activities.
Demonstration sites and related activities
The Mission encourages collaborations between regional and local authorities facing similar challenges and considers this to be a very efficient approach to secure a large impact. Therefore, the demonstration activities of the proposals:
• Must take place in at least two distinct cross-border demonstration sites located in EU Member States or Associated Countries. The demonstration areas must span adjacent regions on both sides of a national border, fostering cross-border collaboration. Regional or local authorities in these areas should actively participate in the project, ideally as beneficiaries or associated partners within the consortium.
• Should identify at least 1 “replicating” cross-border site spanning adjacent regions on either side of a national border, located in Member States or Associated Countries, interested in reapplying the lessons learnt (totally, partially or with the required adjustments) in their territories. For the replication, the consortium could include one or more partners that would provide support for the technical exchanges and the knowledge uptake in the “replicating” regions or local authorities. Replicating regions are not necessarily expected to carry out on the ground activities already in the course of the project. However, replicating regions should at least prepare the theoretical framework for replicating the successful solutions and explore means to fund the implementation of those solutions.
Links to the Mission and to other projects and initiatives
Proposals should build (when relevant) on existing knowledge and adaptation solutions developed by previous projects and explore synergies with ongoing projects from EU and national programmes[3].
Synergies with other funding sources (EU and national) are encouraged to identify opportunities to scale up the solutions demonstrated and to foster their broad deployment across Europe through other programmes.
Proposals should include a mechanism and the resources to establish operational links and collaboration with the Mission Implementation Platform (including on monitoring). Projects funded under this topic will be expected to participate in the Mission Community of Practice and to share relevant knowledge to feed the work of the project stemming from HORIZON-MISS-2026-01-CLIMA-02.
All projects funded under this topic should work together as a cluster (under the umbrella of the Mission), coordinate their activities and align their outputs as much as possible to maximise their impact.
Proposals are encouraged to (dedicate resources to) 1) link their monitoring to the framework developed by the project UNDERPIN; 2) to rely on the (updated) CLIMAAX framework for their climate risk assessments.
Applicants should acknowledge these elements and already account for them in their proposal, making adequate provisions in terms of resources and budget to engage and collaborate with the Mission.
[1] In this context, cross-border risk is understood as risk spanning the border between two or more countries and affecting both or all areas.
[2] JRC 2024 Cross-border and emerging risks in Europe
[3] Interreg and LIFE are particularly relevant for this topic
Who can apply, in detail
- Purpose
- Research and innovation
- R&D relevance
- 2 of 3
- Poland eligible
- Yes
- Country limit
- Demonstrations in European internal border regions
- Region
- Any
- Consortium
- Unclear
- Readiness level (TRL)
- —
- Topics
- Cross-border climate resilience
- Climate adaptation demonstrations
- Nature-based solutions
- Systemic climate risks
Machine-classified from the call text; check eligibility at the source. 23 Oct 2026
Conditions
Typed facts extracted from the source documents by Scindu's grant-data review. Each value keeps its own conditions. Unknown means unstated, not zero or unlimited.
- Applicant restriction
- China-established entities are generally barred from Innovation Actions in any capacity, subject to justified case-by-case exceptions. Chinese public universities administered or supervised by MIIT are ineligible for every action under this work programme. Other sanctions, capacity and funding-country conditions still apply.
- Application restriction
- Planned opening9February2027 and single-stage deadline21September2027.
- Application restriction
- Deadlines are17:00Brusselslocaltime. The responsible Director-General may move opening up to one month before/after the planned date and delay deadlines up to two months. Budget subject to available appropriations.
- Application restriction
- Use Portal PartA, PartB and mandatory annexes. Coordinator mandate, declarations and applicant capacity/eligibility are required. The actual submission template controls the required documents.
- Eligible geography
- Demonstrate at least two distinct cross-border sites in Member States/Associated Countries, each spanning adjacent regions on both sides of a national border. Regional/local authorities should actively participate, ideally as beneficiaries/associated partners. Identify at least one additional replicating cross-border site; it need not implement works during the project but prepares a replication framework and explores implementation finance.
- Eligible project scope
- Develop, test and demonstrate solutions to cross-border climate risks and improve governance coordination. Explore prediction/monitoring/reporting services. Address at least one relevant risk such as water scarcity, floods, storms, fires or sea-level rise, preferably systemic, compound and cascading risks/ecosystem degradation. Demonstrate common risk classification/acceptable levels and integrated governance/socioeconomic solutions for both sides. Prioritise nature/ecosystem-based adaptation and embed solutions in regional/local or national adaptation plans.
- Expected number of grants (planning estimate)Captured SEDIA planning estimate for exact topic HORIZON-MISS-2027-01-CLIMA-01
- 5 count
Expected funded-project/grant count in the exact provider topic budgetOverview. Indicative planning metadata, not guaranteed awards, maximum accepted projects, staffing or consortium size. It does not replace any differently expressed work-programme planning range.
- Other condition
- Innovation Action.
- Other condition
- Build on relevant prior/ongoing projects including Interreg/LIFE and seek scaling-finance synergies. Budget operational links with the MissionImplementationPlatform, monitoring and CommunityofPractice; share knowledge with the CLIMA02 project. All funded projects should cluster and align outputs. Resources for UNDERPIN monitoring and CLIMAAX assessments are encouraged.
- Other condition
- Full-stage criteria each score to5, individual threshold3 and total10. IA ranking gives Impact weight1.5. Passing thresholds enters budget-limited ranking, not a guaranteed award.
- Partner requirement
- Three independent beneficiary legal entities in three different countries: at least one EU Member State entity and at least two others in different Member States or Associated Countries. Affiliates do not count towards this minimum. Topic-specific required actors are additional.
- Staff restriction
- Include effective SSH expertise, experts and institutions to achieve significant societal impact in the cross-border adaptation work.
Amounts and costs
- Indicative budget
- €72,323,812
Topic budget as stated in the portal's budget table. Lump-sum and per-project limits are in the call conditions.
- Eligible cost
- The captured own-topic section does not state a lump-sum exception. Adopted GeneralAnnexG describes mixed actual-cost grants: reimburse only eligible costs actually incurred at the applicable rate. Budget categories include personnel, subcontracting, purchases and specifically permitted FSTP. Final grant agreement fixes model, eligible costs, amount and duration; no separate salary/FTE/contract or universal job count is prescribed.
- Eligible cost
- General indirect costs are a25% flat rate of eligible direct costs, excluding subcontracting, FSTP and unit/lump-sum amounts already including indirect costs. This is a project budget cost rule, not salary overhead or a wage rate.
- Funding intensity, maximum
- 100 percent of eligible costs
Only nonprofit legal entities may receive up to100% for this IA; not a universal rate.
- Funding intensity, maximum
- 70 percent of eligible costs
Ordinary IA maximum, subject to actual grant and eligible costs; nonprofit exception separate.
- Indirect cost flat rateGeneralAnnexG indirect costs for this Horizon action/grant methodology
- 25 percent of the named eligible-direct-cost base
Base: total eligible direct costs excluding subcontracting, financial support to third parties and any unit costs/lump sums already including indirect costs. Apply only within the relevant grant/budget methodology; for lump sums this contributes to amount-setting, not an extra actual-cost payment or wage rate.
- Expected project funding, up to
- €15,000,000
Indicative expected range; different requested amounts may be selected, not a hard cap.
- Expected project funding, from
- €10,000,000
Indicative expected range; different requested amounts may be selected, not a hard cap.
- Topic allocation
- €72,320,000
Indicative total topic allocation, not per-project cap or remaining funds.
Personnel and services
Researcher
Required staff
Explicit expertise/contribution requirement, not advertised positions. No degree, PhD age, seniority, salary, headcount, FTE or employment duration prescribed.
Source documents
Call facts
- Opens
- 9 Feb 2027
- Deadline model
- Single-stage
- Programme
- Horizon Europe · 2021 - 2027
- Call
- HORIZON-MISS-2027-01 · Supporting the implementation of the Adaptation to Climate Change Mission
- Types of action
- HORIZON Innovation Actions
- Source
- ec.europa.eu
- Checked
- 23 Oct 2026
- Portal updated
- 2 Mar 2026
- Review status
- Partial review
- Reviewed
- 23 Oct 2026
This is a summary of the source page, not the official text. Eligibility, conditions and the submission system are at the source.