Capacity building for extending product lifecycles through repair and refurbishment
Horizon Europe · Grant topic
Summary
Not an R&D call a Polish company can use, by Scindu's rule.
Funds training and capacity building for professionals, consumers and educators to repair and refurbish electronics, furniture, textiles and footwear.
- Who can apply
- Companies can lead: SME, large company, startup, research org, university, NGO, other.
- Amount
- €4M – €5M per projectTotal budget €9,000,000
- Deadline
- 22 Sept 2027 02:00 CESTin 333 days
- Status
- Forthcomingopens 20 Apr 2027
Machine-classified from the call text; check eligibility at the source.
Description
Expected Outcome:
Project results are expected to contribute to all of the following expected outcomes:
• professionals, consumers and educators adopt innovative repair and refurbishment practices in specific product value chains (electronics, furniture, textiles and footwear), enabling significant reductions in waste, environmental impacts and biodiversity loss, while driving cost savings and job creation in the repair and refurbishment sector;
• professionals, consumers, local partners, social economy actors and educators have access to high-quality training programs that provide them with technical, business and social skills to repair and refurbish products, thus promoting sustainable consumption and production patterns, climate change adaptation and mitigation, reduction of waste and emissions and enhancing resilience of product value chains.
Scope:
As the EU strives to reduce waste and promote sustainable consumption, as outlined in the European Green Deal, the Clean Industrial Deal and the upcoming Circular Economy Act, extending product lifecycles through repair and refurbishment practices has become a key approach for achieving a circular economy and extending products’ lifecycles. To support this transition, there is a growing need for innovative capacity-building initiatives that equip professionals, consumers, local authorities and educators with the skills and knowledge required to repair and refurbish products. These practices can contribute to the extension of product lifecycles, thus reducing environmental and climate impacts and contributing for the development of a single market for sustainable products.
Proposals should:
• develop and test innovative, modular and scalable training programs for professionals, consumers, local partners, social economy actors and educators, focusing on the repair and refurbishment of one or more of the following product categories: electronics (including household appliances), furniture, textiles and footwear. These training programs should create engaging, accessible and effective learning experiences that support the development of repair and refurbishment skills;
• develop and test new services for repair and refurbishment, as well as strategies for their uptake, considering the potential to reduce biodiversity impacts, support climate change adaptation and mitigation, and promote sustainable consumption patterns. The focus should be on making them accessible and affordable to all consumers, including those with disabilities or with limited access, financial resources or technical expertise. To achieve this, the strategies should investigate various approaches, such as affordable, accessible and convenient repair services, community-based repair initiatives, and knowledge and expertise sharing mechanisms and digital platforms;
• evaluate the feasibility, effectiveness and impact of these new services and strategies using robust evaluation methods (including lifecycle assessments such as Product Environmental Footprint, where relevant) and present data and evidence about the economic, environmental and social costs and benefits of the developed strategies.
The topic supports EU policies, particularly the European Green Deal, the Ecodesign for Sustainable Products Regulation, the upcoming Circular Economy Act and Europe’s efforts to develop a single market for sustainable products.
This topic requires the effective contribution of SSH disciplines and the involvement of SSH experts, institutions as well as the inclusion of relevant SSH expertise, in order to produce meaningful and significant effects enhancing the societal impact of the related research activities.
Who can apply, in detail
- Applicant types
- SME, Large company, Startup, Research org, University, NGO, Other
- Purpose
- Training and people
- R&D relevance
- 1 of 3
- Poland eligible
- Yes
- Country limit
- —
- Region
- Any
- Consortium
- Unclear
- Readiness level (TRL)
- —
- Topics
- Product repair
- Refurbishment skills
- Circular consumption
- Electronics and textiles
Machine-classified from the call text; check eligibility at the source. 23 Oct 2026
Conditions
Typed facts extracted from the source documents by Scindu's grant-data review. Each value keeps its own conditions. Unknown means unstated, not zero or unlimited.
- Applicant restriction
- General Annex B also excludes public Chinese universities administered by or under the supervision of China’s Ministry of Industry and Information Technology (MIIT) from any action under all parts of this Work Programme. This records a source-stated potential eligibility restriction; it does not adjudicate any applicant’s status.
- Applicant restriction
- General Annex B bars legal entities established in China from Innovation Actions and, unless a stated destination exception applies, from Research and Innovation Actions, including participation in any capacity for the listed IA/RIA restrictions. The exact CIRCBIO destination heading is not among the enumerated Cluster 6 RIA exceptions. Topic 08 separately states the control rule for this exact topic.
- Applicant restriction
- General Annex B excludes entities subject to EU restrictive measures from participation in any capacity and refers to special rules for entities covered by Commission Guidelines 2013/C 205/05 on Israeli entities and activities in territories occupied since June 1967. Eligibility under these rules depends on the entity and activity; this review does not make an applicant-specific determination.
- Applicant restriction
- General Annex B states that Hungarian public-interest trusts established under Act IX of 2021 and entities they maintain may apply and, if allowed by call conditions, participate as associated partners without EU funding; while the Council measures remain in force, they are not eligible in funded roles. This records the published rule and does not determine the status of a particular entity or current Council measures.
- Applicant restriction
- General Annex B states that entities established in Russia, Belarus or non-government-controlled territories of Ukraine are not eligible in any participation capacity, subject to justified case-by-case exceptions. It also states that entities established outside Russia but more than 50% directly or indirectly owned by a Russia-established entity are not eligible in any capacity. This is the published programme rule, not a determination about a particular applicant.
- Applicant type
- Unless a specific topic exception modifies it, the standard minimum is three independent legal-entity beneficiaries from three different countries: one Member State plus two others from different Member States or Associated Countries. Affiliated entities do not count toward that minimum.
- Application restriction
- 2027-09-22, 17:00 Brussels local time (published call deadline; Commission may delay by up to two months)
- Application restriction
- 2027-04-20 (planned opening date)
- Application restriction
- This is the Call 01 single-stage 2027 route. The separate -01-two-stage and -02-two-stage topics are distinct topic records, not alternate stages of this exact record.
- Eligible project scope
- Research and Innovation Actions
- Eligible project scope
- Develop and test modular, scalable repair/refurbishment training for electronics, furniture, textiles and/or footwear and new accessible/affordable services; evaluate outcomes using robust methods, including lifecycle assessment where relevant. Include effective SSH contribution and expertise.
- Other condition
- The Work Programme overview gives an indicative expected award count of 2 project(s) for this topic; it is a planning figure, not a guaranteed award count.
Amounts and costs
- Indicative budget
- €9,000,000
Topic budget as stated in the portal's budget table. Lump-sum and per-project limits are in the call conditions.
- Eligible cost
- The project-based detailed lump-sum budget is an estimate per cost category, beneficiary/affiliated entity and work package. Its inputs must approximate actual costs, follow the programme’s actual-cost eligibility rules, the beneficiary’s normal practices, be reasonable/non-excessive, and be necessary and aligned to proposed activities. These estimates justify/fix the contribution; they are not actual-cost claims.
- Eligible cost
- SEDIA identifies the Horizon Lump Sum Grant model; the Lump Sum MGA pays a contribution for completed work packages according to the signed agreement, not reimbursement of each actual payroll or supplier invoice. Topic text explicitly invokes the Lump Sum Decision for those topics that state the legal/financial exception.
- Eligible cost
- Travel/subsistence, equipment and other goods/works/services are categories in the underlying Horizon cost model; the amount may be included in a lump-sum estimate only where the item would be eligible under actual-cost rules and is needed for the proposed activities. This packet does not assert that a specific purchase is authorized in the final budget.
- Eligible cost
- Subcontracting may be included in the detailed estimate only where necessary and otherwise eligible; the underlying Horizon MGA rules require usual purchasing practices, best value for money (or lowest price where appropriate), and no conflict of interest. Under the lump-sum model the contribution is not reimbursed invoice-by-invoice.
- Eligible cost limit
- 25 percent of eligible direct costs for actual-cost MGA budget calculations; exclusions as stated in conditions
The general Horizon Europe MGA flat-rate base excludes eligible direct costs for subcontracting, financial support to third parties and unit costs or lump sums that include indirect costs. For a project-based lump sum, any indirect-cost amount is only part of the estimated Annex 2 breakdown if applicable; this is not a separate 25% payment on top of the lump sum. If the beneficiary receives an operating grant, the lump-sum guidance says indirect cost estimates are not eligible.
- Funding intensity, maximum
- 100 percent of eligible costs (general action-type maximum)
General Horizon Europe maximum for RIA: 100% of eligible costs. For lump-sum grants the funding rate is already applied in the methodology used to fix the amount; it is not an additional multiplier to apply to the indicative project contribution or topic allocation. Final grant parameters are fixed in the signed grant agreement.
- Expected project funding, up to
- €5,000,000
The topic states a between-range, not a binding cap; the Commission permits proposals requesting different amounts.
- Expected project funding, from
- €4,000,000
The topic states a between-range, not a mandatory minimum; the Commission permits proposals requesting different amounts.
- Topic allocation
- €9,000,000
Topic-level indicative call allocation; not an amount per project or individual beneficiary. The Work Programme says the call budget is subject to availability of appropriations.
Personnel and services
Other role
Staff cost the grant can fund
Natural persons under a direct contract other than an employment contract may be estimated only when assigned to the action, meeting employee-like working conditions, with the result belonging to the beneficiary unless otherwise agreed. The amount follows the underlying actual contract cost and may not differ significantly from similar employee tasks; no salary rate is published.
Other role
Staff cost the grant can fund
Costs for employees under an employment contract or equivalent appointing act, assigned to the action. For this lump-sum call this is a budget-estimate category subject to corresponding actual-cost eligibility rules, not an advertised role, required hire, headcount or salary-rate entitlement.
Other role
Staff cost the grant can fund
Seconded-person personnel-cost estimates require assignment to the action, employee-like working conditions, result ownership by the beneficiary unless otherwise agreed, and an amount tied to actual secondment cost that is not significantly different from comparable employee tasks. No job, headcount or pay rate is specified.
Other role
Staff cost the grant can fund
The action-related work of a beneficiary SME owner or natural-person beneficiary receiving no salary may be included under the personnel unit-cost method in Annex 2a where general eligibility conditions are met. It is not a payroll salary and this review does not assert a unit amount.
Source documents
- Horizon Europe Work Programme 2026-2027, General Annexes
- EU Grants: Horizon Europe MGA — Multi & Mono, V1.2, 01.06.2026
- Commission Decision authorising the use of lump sum contributions under Horizon Europe
- EU Grants: How to manage your lump sum grants, V1.5, 01.06.2026
- EU Grants: Programme Lump Sum MGA — Multi & Mono, V1.0, 01.11.2024
- Horizon Europe Work Programme 2026-2027, Part 9: Food, Bioeconomy, Natural Resources, Agriculture and Environment
Call facts
- Opens
- 20 Apr 2027
- Deadline model
- Single-stage
- Programme
- Horizon Europe · 2021 - 2027
- Call
- HORIZON-CL6-2027-01 · Call 01 - single stage (2027)
- Types of action
- HORIZON Research and Innovation Actions
- Keywords
- PEF
- capacity building
- digital platform
- educators
- electronics
- footwear
- furniture
- household appliances
- job creation
- jobs
- knowledge sharing
- lifecycle assessment
- product environmental footprint
- product life-cycle
- refurbish
- refurbishment
- repair
- skills
- sustainable consumption
- textiles
- Source
- ec.europa.eu
- Checked
- 24 Oct 2026
- Portal updated
- 7 Oct 2026
- Review status
- Partial review
- Reviewed
- 23 Oct 2026
This is a summary of the source page, not the official text. Eligibility, conditions and the submission system are at the source.