scindu funding
All calls

Działanie FENX.13.02 Infrastruktura kolejowa, drogowa i morska podwójnego przeznaczenia

FEnIKS · CUPT · National call

FENX.13.02

Summary

Not an R&D call a Polish company can use, by Scindu's rule.

Funds dual-use rail, road and maritime infrastructure; eligible applicant types are unspecified.

Who can apply
Unclear from the source.
Amount
Budget not stated
Deadline
31 Dec 2027in 433 days
Status
Openopened 31 Mar 2026
Open the official pageRegister to keep this call

Machine-classified from the call text; check eligibility at the source.

Description

The description is on the provider's page.

Who can apply, in detail
Purpose
Energy, environment, infrastructure
R&D relevance
0 of 3
Poland eligible
Yes
Country limit
—
Region
Any
Consortium
Unclear
Readiness level (TRL)
—
Topics
  • Dual-use infrastructure
  • Rail infrastructure
  • Road infrastructure
  • Maritime infrastructure

Machine-classified from the call text; check eligibility at the source. 23 Oct 2026

Conditions26

Typed facts extracted from the source documents by Scindu's grant-data review. Each value keeps its own conditions. Unknown means unstated, not zero or unlimited.

Applicant type
Exact FENX.13.02 road dual-use round; Generalny Dyrektor Dróg Krajowych i Autostrad only, with prior IZ identification. The broader priority title mentioning rail/maritime does not make those project types eligible in this road call.
Application restriction
WOD2021 only, Polish/qualified signatures and authority declarations each version;31March2026–31December2027 23:59. Environmentaldecision covering required fullscope must exist by APPLICATION; other required administrative documents by assessmentend subjecttospecifiedexceptions. e-Doręczenia is the stated communication route outside WOD.
Application restriction
Submit the signed project fiche and military confirmation for the actual road project. The road sheet asks whether each dual-use requirement is met (yes/no/not applicable), retains single-lane 3.5–5.5 m, one-direction 5.5–7.3 m and two-direction at least 7.3 m alternatives, Type X all-weather route, conditional occasional 130 t road/bridge transport, 4.5 m load height/width, 18.75–27.5 m load length and 12.5–15.5 m turning-radius bands. The workbook’s railway/port sheets do not make those modes eligible in this road-only call.
Application restriction
Submit the original applicant declaration signed with a qualified electronic signature confirming the WOD application. Attach authority-to-represent documents as original or qualified-signature-certified copy; the declaration exempts KRS and municipal election/oath authority evidence from copy certification. Blank signatures and names do not establish an applicant’s compliance.
Application restriction
ExactMarch2026 environmental form includes applicable EIA/Natura/water evidence,>=5-year infrastructure climate proofing, whole-scope lifecycleDNSH and project-specific climate-risk/adaptation analysis. Nonphysical exceptions require justification; optionalDNSH monitor suggestion does not mandate new hiring.
Application restriction
Submit the General Staff of the Polish Armed Forces confirmation with WOD. To obtain it, send the project card to Logistics DirectorateP4 using addresses supplied separately by the institution. The confirmation must cover priority military-mobility corridor or militaryTEN-T location AND relevant technical dual-use compliance; no classified corridor map or actual-project certification is inferred.
Application restriction
CurrentTEN-T2024/1679 standards, government road/100-bypass/programme-contract identification, environmental decisions, immediate functionality, charging/refuelling location plan, positiveENPV, applicable statutory BRD audit and green/nature-based rainwater retention/cleaning (technical-impossibility non-applicability exception only). Additional military criteria are mandatory and separate.
Application restriction
A physically completed construction project or fully implemented supply/service project before application cannot receive support, regardless of whether all payments were made.
Eligible project scope
Construction/reconstruction of GDDKiA national roads to dual-use parameters in core or comprehensiveTEN-T, intervention087/088. Less-developed and transition regional categories.
Other condition
EU2025/1914 inserts ERDF/CohesionFund Article7a(5), providing31December2030 eligibility/decommitment where approved programme amendments reallocate at least10% to the specified dedicated priorities (with separately stated exceptions). This provides a conditional legal route for the call’s2030 date; it is not a universal extension of all old FEnIKS rounds. The exact13.02 rule expressly states2030. Programme-specific approval satisfying the statutory conditions is not independently established in this packet.
Other condition
The adopted manual requires fixed templates, subordinate additional logos, no contractor marks in the main logo line, visible durable boards, and at least two boards for linear projects. A project begun before award must place its board within two months of agreement/decision; posters within one month of award. Create a social profile if absent and publish the required project/financing information. Maintain ordinary web/social information through implementation and a project-funded website through durability; apply the public-safety exception for poster location.
Other condition
CUPT appoints the assessment commission and may seek external expert opinions; assessment corrections, impartiality/confidentiality, consensus and institution approvals follow the adopted KOP rules. Commission/expert positions belong to the assessment process, not funded beneficiary jobs. Any expert compensation is governed by CUPT’s individual contract; no public pay amount or applicant headcount is inferred.
Other condition
The assessment checklist distinguishes obligatory pass/fail criteria from point-ranked rows; a zero in a ranking row alone does not exclude the project, while the applicable combined minimum still governs. Blank committee names/roles are institutional sign-off fields, not beneficiary staff numbers or salaries.
Other condition
Mark public communications, participant materials and project equipment/products with the adopted FE, Polish-colour (where applicable) and EU marks; publish project information and document activities. Total project cost above EUR 500,000 triggers a durable board; other projects need at least one A3 poster/equivalent display. Strategic projects or total cost above EUR 10 million require an event and invitations to EC/MA at least four weeks ahead. These are communication duties, not grant ceilings or fundable beneficiary headcounts.
Other condition
The adopted communications reduction table caps cumulative reductions at 3% of the grant: website 0.5%, social-media 0.5%, absent required markings 0.25%; missing board/poster 0.5%, wrong design 0.25%, poor visibility 0.25%; missing required event/invitations 0.5%. Apply the actual underlying duty and contractual correction procedure; these are potential grant reductions, not eligible cost rates or automatically imposed penalties.
Other condition
Road table4 distinguishes single-lane3.5–5.5m and one-way5.5–7.3m classification; two-way7.3m minimum, preferably8.2m. TypeX all-weather routes are preferred. Applicable exceptional-load parameters include4.5m height/width,18.75–27.5m length and12.5–15.5m turning radius, with specific national determination/permits and explanatory notes. Do not impose airport/rail/port table thresholds or treat preferred/exceptional figures as universal road minima.
Other condition
The agreement adopts ministerial guidelines applicable when the action/expense/procurement occurs, with the express more-favourable-edition exception and institution decision for reassessment. The retained19May2026 edition is not applied retroactively to every historic expense.
Other condition
Exactdual-use road rule states no stateaid occurs.
Other condition
Current adopted PJB agreement provides100% eligible-expenditure settlement, with individual amount/split blanks and institution-approved SL2021 expense statements. Project schedule updates at31March/30September are due within7days; personnel engagement is registered in SL2021, not advertised as vacancies. NPJB advance rules do not govern this PJB route.
Other condition
Minimum30% combined horizontal/specific maximum ranking points plus all applicable obligatory criteria and allocation. Specificgrid total8: continuity4/3 alternative tiers and readiness4/3/2/1 alternative tiers with separate design-build/build evidence; individualzero ranking row does not itself disqualify.
Staff monthly hours, maximumActual-cost personnel: aggregate professional engagement across all EU projects and other sources/employers
276 hours_per_month

Aggregate276-hour test counts annual leave and sickness, excludes other absences as specified. Chapter3.8(17) excludes personnel under simplified methods from this chapter except integrity rule13, so this ceiling is NOT asserted for staff settled in the applicable simplified indirect simplified indirect-cost pool.

Technical requirement, maximumAxle load for the exceptional130t dual-use vehicle movement described by the standard
12.23 tonnes_per_axle

Separate from ordinary115kN/axle road-bearing eligibility standard and civil regular limits; not a blanket higher ordinary traffic permission.

Technical requirement, minimumBridge capability for occasional130t gross-vehicle passage under prescribed mitigations
130 tonnes_gross_vehicle_mass

Not unrestricted130t traffic. Maximum12.23t/axle, speed/separation and where needed one-way operation apply as national controls; no project certification inferred.

Technical requirement, minimumRoad pavement capability to withstand occasional overweight dual-use movements
130 tonnes_gross_vehicle_mass

130t capacity concerns occasional extraordinary transport, not unrestricted free movement. Special permits/exemptions and national risk-mitigation controls apply; scope-specific General Staff confirmation required.

Technical requirement, minimumTwo-way dual-use road classification width for simultaneous two vehicle columns
7.3 metres

Applies to this road classification;8.2m is preferred, not universal minimum. Single-lane/one-way ranges are separate cases. Hard shoulders cannot substitute extra lanes.

Technical requirement, minimumRequired load-bearing road standard
115 kN_per_axle

The project must provide115kN/axle load-bearing standard; physical infrastructure condition, not ranking score or funding limit.

Amounts and costs13
Call allocationEU allocation exact13.02 road dual-use round
PLN 3,133,095,000

Published pool, not per-project cap or remaining balance; may change and depends on EURPLN at signing.

Eligible cost
Necessary actual-cost project personnel may be eligible under the adopted cost guidelines: gross salary plus statutory employer costs, documented project duties and proportionate project engagement. EFRR/FS/FST salary cost must not exceed comparable beneficiary positions/qualifications. This does not turn the call-specific indirect flat-rate pool into individually reimbursed payroll.
Eligible cost
Within the call-specific indirect flat rate: project coordinator and administrative management/settlement/monitoring staff remuneration, travel and training; management/HR/finance/legal/accounting support; necessary external services, expert advice and legal/financial/technical consulting. These cost categories do not advertise vacancies, require new hiring, or set headcounts, FTEs or salaries.
Eligible cost
Exact call rule states1January2021–31December2030; indirect costs from1January2024. VAT is conditional under applicable guideline§3.5. EU2025/1914 supplies a conditional programme-reallocation legal route for2030; do not silently substitute the generic2029 date or treat this as an unconditional extension of other rounds.
Funding intensity, maximumEU funding divided by eligible expenditure in less-developed region
85 %

Regional ceiling; final agreement may be lower; separate from total public component.

Funding intensity, maximumEU funding divided by eligible expenditure in transition region
70 %

Regional ceiling; final agreement may be lower; separate from total public component.

Funding intensity, maximumEU plus awarded national public funding divided by eligible expenditure
100 %

Total public ceiling, not100%EU entitlement.

Indirect cost flat rateIndirect costs divided by eligible direct project costs in this exact dual-use road round
4.6 %

Indirect costs eligible from1January2024. This is simplified indirect budget, not staff salary rate; no3.3% branch imported from older road calls.

Ineligible cost
Unrelated representation costs are ineligible. Promotional gadgets are permitted only as supporting elements of another activity. Indicative promotion budgets, timing and communication-output targets in the form serve monitoring; they are not actual awards or project result targets. Material changes need the institution’s consent and cannot substantially impair communication.
Ineligible cost
Indirect costs charged again as direct costs are ineligible; classify the administrative/personnel/service items under the adopted catalogue, not as a separate actual-cost payroll entitlement.
Ineligible cost
Under the applicable actual-cost guidance: jubilee awards, employee severance, PFRON payments and employee ZFŚS benefits are excluded; nonmandatory employee contributions/fees require the stated6-month preapplication, equal-coverage remuneration-rule exception. Engaging an existing employee by a civil-law contract other than specific-work contract is excluded except statutory employment restrictions or R&D; operational-phase staff costs require the explicit approved-project exception.
Selection ranking threshold, minimumCombined applicable horizontal and specific maximum ranking score
30 %

Minimum combined ranking threshold; not percentage of one criterion, not funding intensity, and not a physical requirement. All applicable obligatory criteria must separately pass.

VAT regime threshold on total project costTotal project cost including eligible/ineligible costs andVAT
€5,000,000

At/above threshold triggers legal-recoverability test/declarations under relevant edition; authority may excludeVAT. Not grant/project-cost ceiling or actual programme total value. Apply state-aid and final agreement restrictions where relevant.

Personnel and services2
  • Necessary services listed in the indirect-cost catalogue; this is a service budget category, not employment eligibility or a job advertisement.

    Other role · Service the grant can fund

    Subject to necessity and indirect flat-rate classification; no price, headcount, FTE or required degree is asserted.

  • Cost category expressly present in the adopted indirect-cost catalogue. Settled through the call-specific simplified indirect flat rate, not an advertised vacancy or individual salary reimbursement.

    Project management · Staff cost the grant can fund

    No required headcount/FTE, hiring obligation, qualification degree or numeric salary is published. The simplified-method Chapter3.8(17) exception must be respected.

Source documents18
Call facts
Opens
31 Mar 2026
Provider
FEnIKS · CUPT
Checked
24 Oct 2026
Review status
Partial review
Independent QA
No published hold
Reviewed
23 Oct 2026

This is a summary of the source page, not the official text. Eligibility, conditions and the submission system are at the source.