scindu funding
All calls

Działanie FENX.05.01 Drogi w sieci kompleksowej TEN-T

FEnIKS · CUPT · National call

nabor-niekonkurencyjny-w-ramach-fenx-05-01-drogi-w-sieci-kompleksowej-ten-t

Summary

Not an R&D call a Polish company can use, by Scindu's rule.

Funds roads in the TEN-T comprehensive network; eligible applicant types are unspecified.

Who can apply
Unclear from the source.
Amount
Budget not stated
Deadline
31 Dec 2026in 68 days
Status
Openopened 31 May 2024
Open the official pageRegister to keep this call

Machine-classified from the call text; check eligibility at the source.

Description

The description is on the provider's page.

Who can apply, in detail
Purpose
Energy, environment, infrastructure
R&D relevance
0 of 3
Poland eligible
Yes
Country limit
—
Region
Any
Consortium
Unclear
Readiness level (TRL)
—
Topics
  • Road infrastructure
  • TEN-T comprehensive network

Machine-classified from the call text; check eligibility at the source. 23 Oct 2026

Conditions17

Typed facts extracted from the source documents by Scindu's grant-data review. Each value keeps its own conditions. Unknown means unstated, not zero or unlimited.

Applicant type
Generalny Dyrektor Dróg Krajowych i Autostrad only in this round.
Application restriction
WOD2021, Polish documentation,qualifiedsignatures/authoritydeclarationsoneachversion;31May2024–31December2026 23:59. Requireddecisionsbyassessmentend subjecttospecifiedsuspension/supplementexceptions. Actualsystemacceptanceandremainingbalanceunverified.
Application restriction
Submit the original applicant declaration signed with a qualified electronic signature confirming the WOD application. Attach authority-to-represent documents as original or qualified-signature-certified copy; the declaration exempts KRS and municipal election/oath authority evidence from copy certification. Blank signatures and names do not establish an applicant’s compliance.
Application restriction
Adopted environmental annex requires project-specific climate proofing for infrastructure expected life>=5years and applicable EIA/Natura/water evidence, with justified nonphysical-project exceptions. Original footnote excludes new river hydrotechnical infrastructure/WFD4(7) derogations. Lifecycle DNSH evidence is required; Annex4.4 lists illustrative examples, expressly an open catalogue rather than a mandatory checklist of every example.
Application restriction
ExactFENX.05.01-IP.02-001/24 noncompetitive comprehensiveTEN-T roads; prior IZ identification required.
Application restriction
A physically completed construction project or fully implemented supply/service project before application cannot receive support, regardless of whether all payments were made.
Application restriction
ComprehensiveTEN-T location/infrastructure standards; government road/100-bypass/programme-contract identification, required environmentaldecisions, immediatefunctionality, publishedTEN-T charging/refuelling plan,positiveENPV, applicableBRDaudit,andrainfallretention/cleaningwithgreen/naturesolutions (technicalimpossibilityexceptiononly).
Eligible project scope
GDDKiA expressway-standard construction/reconstruction in comprehensiveTEN-T and GDDKiA national-road bypasses inTEN-T; intervention088, less-developed regions. The generic5.1 criteria also mention city-county bypasses, which does not expand the sole-applicant scope of this exact round.
Other condition
CUPT appoints the assessment commission and may seek external expert opinions; assessment corrections, impartiality/confidentiality, consensus and institution approvals follow the adopted KOP rules. Commission/expert positions belong to the assessment process, not funded beneficiary jobs. Any expert compensation is governed by CUPT’s individual contract; no public pay amount or applicant headcount is inferred.
Other condition
The assessment checklist distinguishes obligatory pass/fail criteria from point-ranked rows; a zero in a ranking row alone does not exclude the project, while the applicable combined minimum still governs. Blank committee names/roles are institutional sign-off fields, not beneficiary staff numbers or salaries.
Other condition
Mark public communications, participant materials and project equipment/products with the adopted FE, Polish-colour (where applicable) and EU marks; publish project information and document activities. Total project cost above EUR 500,000 triggers a durable board; other projects need at least one A3 poster/equivalent display. Strategic projects or total cost above EUR 10 million require an event and invitations to EC/MA at least four weeks ahead. These are communication duties, not grant ceilings or fundable beneficiary headcounts.
Other condition
The agreement adopts ministerial guidelines applicable when the action/expense/procurement occurs, with the express more-favourable-edition exception and institution decision for reassessment. The retained19May2026 edition is not applied retroactively to every historic expense.
Other condition
Thisexactroundregulationstatesnostateaidoccurs.
Other condition
Exact adopted state-budget-unit agreement provides100% eligible expenditure settlement with individual award/split blanks; institution approves incurred expenditure through SL2021. Schedule updates at31March and30September are due within15days, unlike later7-day templates in other calls. SL2021 personnel register records actual engagement, not new vacancies. No NPJB70%advance rule is imported.
Other condition
All applicable obligatory criteria; minimum30% of combined horizontal/specific maximum ranking points, subject to allocation. Specificgrid total8: continuity4/3 alternative tiers andreadiness4/3/2/1 alternative tiers with designbuild/build evidence. Individualzero rankingrowdoesnotitselfexclude.
Staff monthly hours, maximumActual-cost personnel: aggregate professional engagement across all EU projects and other sources/employers
276 hours_per_month

Aggregate276-hour test counts annual leave and sickness, excludes other absences as specified. Chapter3.8(17) excludes personnel under simplified methods from this chapter except integrity rule13, so this ceiling is NOT asserted for staff settled in the applicable simplified indirect simplified indirect-cost pool.

Technical requirement, minimumRequired load-bearing road standard
115 kN_per_axle

The project must provide115kN/axle load-bearing standard; physical infrastructure condition, not ranking score or funding limit.

Amounts and costs13
Call allocationEU/ERDF allocation exact5.01-001/24
PLN 2,334,689,958

Published call allocation, not per-project cap or remaining balance; rule permits change and final exchange-rate effect at signing.

Eligible cost
Necessary actual-cost project personnel may be eligible under the adopted cost guidelines: gross salary plus statutory employer costs, documented project duties and proportionate project engagement. EFRR/FS/FST salary cost must not exceed comparable beneficiary positions/qualifications. This does not turn the call-specific indirect flat-rate pool into individually reimbursed payroll.
Eligible cost
Call eligibility1January2021–31December2029; indirect costs from1January2024. VAT subject to applicable ministerialguideline§3.5 and agreement options.
Eligible cost
Within the call-specific indirect flat rate: project coordinator and administrative management/settlement/monitoring staff remuneration, travel and training; management/HR/finance/legal/accounting support; necessary external services, expert advice and legal/financial/technical consulting. These cost categories do not advertise vacancies, require new hiring, or set headcounts, FTEs or salaries.
Funding intensity, maximumEUcofinancing divided by eligible project expenditure
85 %

Separate financing components; actual agreement can lower ceiling;100% is not EU-only.

Funding intensity, maximumEU plus awarded national publiccofinancing divided by eligible project expenditure
100 %

Separate financing components; actual agreement can lower ceiling;100% is not EU-only.

Indirect cost flat rateIndirect-cost flat rate of eligible direct project cost for applications by17December2024 23:59
3.3 %

Alternative date branches, not additive; indirectcosts eligible from1January2024; not salaryrate.

Indirect cost flat rateIndirect-cost flat rate of eligible direct project cost for applications from18December2024
4.6 %

Alternative date branches, not additive; indirectcosts eligible from1January2024; not salaryrate.

Ineligible cost
Unrelated representation costs are ineligible. Promotional gadgets are permitted only as supporting elements of another activity. Indicative promotion budgets, timing and communication-output targets in the form serve monitoring; they are not actual awards or project result targets. Material changes need the institution’s consent and cannot substantially impair communication.
Ineligible cost
Indirect costs charged again as direct costs are ineligible; classify the administrative/personnel/service items under the adopted catalogue, not as a separate actual-cost payroll entitlement.
Ineligible cost
Under the applicable actual-cost guidance: jubilee awards, employee severance, PFRON payments and employee ZFŚS benefits are excluded; nonmandatory employee contributions/fees require the stated6-month preapplication, equal-coverage remuneration-rule exception. Engaging an existing employee by a civil-law contract other than specific-work contract is excluded except statutory employment restrictions or R&D; operational-phase staff costs require the explicit approved-project exception.
Selection ranking threshold, minimumCombined applicable horizontal and specific maximum ranking score
30 %

Minimum combined ranking threshold; not percentage of one criterion, not funding intensity, and not a physical requirement. All applicable obligatory criteria must separately pass.

VAT regime threshold on total project costTotal project cost including eligible/ineligible costs andVAT
€5,000,000

At/above threshold triggers legal-recoverability test/declarations under relevant edition; authority may excludeVAT. Not grant/project-cost ceiling or actual programme total value. Apply state-aid and final agreement restrictions where relevant.

Personnel and services2
  • Necessary services listed in the indirect-cost catalogue; this is a service budget category, not employment eligibility or a job advertisement.

    Other role · Service the grant can fund

    Subject to necessity and indirect flat-rate classification; no price, headcount, FTE or required degree is asserted.

  • Cost category expressly present in the adopted indirect-cost catalogue. Settled through the call-specific simplified indirect flat rate, not an advertised vacancy or individual salary reimbursement.

    Project management · Staff cost the grant can fund

    No required headcount/FTE, hiring obligation, qualification degree or numeric salary is published. The simplified-method Chapter3.8(17) exception must be respected.

Source documents13
Call facts
Opens
31 May 2024
Provider
FEnIKS · CUPT
Checked
24 Oct 2026
Review status
Partial review
Independent QA
No published hold
Reviewed
23 Oct 2026

This is a summary of the source page, not the official text. Eligibility, conditions and the submission system are at the source.