scindu funding
All calls

8.6 Integracja społeczna

FE dla Podkarpacia · National call

8.6

Summary

Not an R&D or investment call a Polish company can use, by Scindu's rule.

Funds Local Action Group grants for social integration of vulnerable children, young people and families in Podkarpackie.

Who can apply
Companies cannot apply: NGO.
Amount
PLN 7,696,101Catalogue budget
Deadline
31 Dec 2028in 799 days
Status
Openopened 28 Oct 2024
Open the official pageRegister to keep this call

Machine-classified from the call text; check eligibility at the source.

Description

The description is on the provider's page.

Who can apply, in detail
Applicant types
NGO
Purpose
Health and social
R&D relevance
0 of 3
Poland eligible
Yes
Country limit
Poland: Podkarpackie Local Action Groups holding a regional framework agreement
Region
podkarpackie
Consortium
Unclear
Readiness level (TRL)
—
Topics
  • Social inclusion
  • Children and youth
  • Family support
  • Social-service capacity

Machine-classified from the call text; check eligibility at the source. 24 Oct 2026

Conditions12

Typed facts extracted from the source documents by Scindu's grant-data review. Each value keeps its own conditions. Unknown means unstated, not zero or unlimited.

Applicant type
Applicant must be a Local Action Group seated in Podkarpackie with a framework agreement with the Podkarpackie Voivodeship Board for implementation of its community-led local development strategy.
Application restriction
The central portal labels this call current and lists application intake 28 October 2024 through 31 December 2028; electronic applications are submitted in SOWA EFS.
Eligible project scope
Community social integration within the LGD local strategy, including activities for children and young people at risk of social exclusion who need support and are in families or residential institutions; activities for families raising children, including families with care/educational difficulties or crisis and their necessary environment; and complementary capacity development for staff needed to deliver high-quality local social services, including staff serving children, young people and families.
Other condition
A participant receiving social-integration support under Priority 8 / Action 8.6 cannot receive the same type of support in Priority 7 projects; this is a same-support-type rule, not a blanket bar on all complementary services.
Other condition
All projects under this call are settled exclusively through task-based lump sums. For projects whose total cost does not exceed the EUR 200,000 equivalent, simplified settlement is mandatory; PLN 854,760 at the call-opening exchange rate is a settlement-method threshold, not a project-value cap or grant maximum. Each task is represented by one lump sum, with an indicator and itemized cost justification; if the indicator is not fully achieved, the lump sum is ineligible.
Other condition
The support is exclusively grant-based: the LGD runs an open competition, selects grant recipients and contracts them for tasks contributing to the grant project.
Other condition
The LGD grant project must plan at least two grants for its LSR territory.
Other condition
Indirect costs cannot be included in this project. The application instructions and Annex 4 condition for 8.6 both state the exclusion; the described budget comprises task-related direct eligible costs.
Other condition
The reviewed current call page, regulation, Annex 2 and relevant Annex 4 terms state no named staff position, headcount, FTE, employment duration, individual payroll rate or salary maximum. Proposed task costs must still be justified with price research; no hiring prohibition is stated.
Other condition
Catalogue identifier “8.6” is retained. The current linked regulation cover identifies FEPK.08.06-IZ.00-001/24, Action FEPK.08.06 Integracja Społeczna.
Other condition
For project activities, the application asks the applicant to describe the substantive personnel involved, the engagement form, estimated workload (employment fraction / hours), and relevant competencies, experience and education. This is a description requirement and does not itself establish a named job, staffing minimum or salary entitlement.
Project duration, maximum
28

Project should end within 28 months of application and no later than 31 December 2028.

Amounts and costs4
Catalogue budget
PLN 7,696,101

Figure as listed by the provider. Whether it is the total allocation or a per-project cap is unverified unless a reviewed condition says so.

Call allocation
PLN 7,696,101

Call-level allocation for LSR implementation; not an individual project or beneficiary ceiling. The institution reserves the ability to increase it and may reduce the pool in specified exchange-rate circumstances.

Funding intensity, maximum
95 %

Maximum EU share of eligible project costs. Regulation footnote 1 states the individual project-support agreement may contain deviations.

Funding intensity, maximum
95 %

Maximum total public support (EU plus national co-financing provided to the beneficiary) as a share of eligible project costs.

Own contribution, minimum
5 %

Minimum beneficiary own contribution under the call rule.

Personnel and services2
  • Other role

    Example only

    Only when included as a complementary part of an eligible grant-project scope and needed for high-quality local social services; any recipient-specific agreement terms remain outside this role description.

  • Other role

    Basis not stated

    Applies only to personnel included in planned grant tasks. A personnel disclosure requirement is not by itself a staffing minimum, hiring authorization, salary ceiling or employment entitlement. Task costs are justified under the lump-sum budget and price-research requirements.

Source documents3
Call facts
Opens
28 Oct 2024
Provider
FE dla Podkarpacia
Checked
24 Oct 2026
Review status
Partial review
Independent QA
No published hold
Reviewed
23 Oct 2026

This is a summary of the source page, not the official text. Eligibility, conditions and the submission system are at the source.