scindu funding
All calls

4.1 Przestrzeń dla przyrody Część 3) Ochrona zagrożonych gatunków i siedlisk przyrodniczych - ograniczenie antropopresji wynikającej z ruchu turystycznego

NFOŚiGW · Ochrona różnorodności biologicznej i funkcji ekosystemów · National call

6/NC/OP/4.1.3/2026/cz.3_nabór PN_2026

Summary

Not an R&D or investment call a Polish company can use, by Scindu's rule.

Provides grants to national parks for sanitary facilities and wastewater infrastructure reducing tourism pressure on threatened species and habitats.

Who can apply
Companies cannot apply: public body.
Amount
Budget not stated
Deadline
31 Mar 2027in 158 days
Status
Openopened 1 Apr 2026
Open the official pageRegister to keep this call

Machine-classified from the call text; check eligibility at the source.

Description

The description is on the provider's page.

Who can apply, in detail
Applicant types
Public body
Purpose
Energy, environment, infrastructure
R&D relevance
0 of 3
Poland eligible
Yes
Country limit
Poland; national parks only
Region
Any
Consortium
Single applicant
Readiness level (TRL)
—
Topics
  • National park conservation
  • Tourist pressure reduction
  • Sanitary infrastructure
  • Wastewater treatment

Machine-classified from the call text; check eligibility at the source. 24 Oct 2026

Conditions8

Typed facts extracted from the source documents by Scindu's grant-data review. Each value keeps its own conditions. Unknown means unstated, not zero or unlimited.

Applicant type
National parks are the beneficiary applicants for the exact part-3 park round.

This is the park-specific current 2026 notice, not the separate PJB notice for part 3 or another part of the programme.

Application restriction
Continuous applications are scheduled from 1 April 2026 through 31 March 2027; this is the park-specific part-3 call, separate from the PJB round.

Exact July 2026 updated call notice; current application system availability is not live-verified.

Application restriction
Public-aid rules apply where relevant; the requested grant must not double-finance eligible costs already covered from national or European sources.

Exact part-3 notice conditions.

Application restriction
Tourist site average daily load in the 1 April–30 September season must be at least 4,000 people/day for sewerage or 150 people/day for a constructed-wetland treatment plant.

Distinct thresholds attach to the listed infrastructure type; they are not general applicant headcount or personnel limits.

Eligible project scope
Project scope is sanitary facilities and infrastructure for wastewater treatment or discharge outside protected areas to reduce tourist pressure; eligible construction may include fixed toilets, sewerage/pumping stations, constructed-wetland treatment plants, water/electric/fibre connections and necessary restoration/associated works.

Exact part-3 park notice. Fibre connection is stated as for device control; associated work must be necessary.

Other condition
The programme states costs incurred from 1 January 2026 through 30 November 2030 may qualify, subject to the funding rules. This is the eligible-cost period, not the application deadline.

Cost eligibility dates in the specific programme priority; not the call’s application window.

Other condition
Funding is a grant and may be paid as an advance or reimbursement.

Exact part-3 park call notice.

Other condition
The PP 4.1.3 programme document states a total PLN 150 million grant budget; this is the programme-wide ceiling, distinct from the PLN 75 million exact call allocation.

Do not substitute programme-wide budget for exact call allocation.

Amounts and costs4
Call allocation
PLN 75,000,000

Allocation in the exact July 2026 park call notice; the programme priority separately states total programme budget of PLN 150 million.

Funding intensity, maximum
100 %

Non-repayable grant intensity under the exact part-3 park call notice, up to eligible costs.

Ineligible cost
Portable toilets, sealed/cesspit wastewater tanks, and shower cabins are ineligible; only native plant species may be used in constructed-wetland treatment plants.

Exact part-3 park call notice.

Ineligible cost
For tasks of state budgetary units, personal remuneration for employment posts is excluded; non-personal remuneration (for example, civil-law service or work contracts) may qualify.

The PP 4.1.3 text expressly scopes this treatment to tasks of state budgetary units; it is not generalized as a blanket rule for every national park or applicant.

Source documents4
Call facts
Opens
1 Apr 2026
Provider
NFOŚiGW · Ochrona różnorodności biologicznej i funkcji ekosystemów
Source
gov.pl
Checked
24 Oct 2026
Review status
Partial review
Independent QA
No published hold
Reviewed
23 Oct 2026

This is a summary of the source page, not the official text. Eligibility, conditions and the submission system are at the source.