Fundusz Transformacji Ciepłownictwa
NFOŚiGW · Transformacja energetyczna · National call
Summary
Not an R&D call a Polish company can use, by Scindu's rule.
Supports transformation of the heating sector; eligible investments and applicant categories are unspecified.
- Who can apply
- Unclear from the source.
- Amount
- PLN 50M per project
- Deadline
- No deadline
- Status
- Forthcoming
Machine-classified from the call text; check eligibility at the source.
Description
The description is on the provider's page.
Who can apply, in detail
- Purpose
- Energy, environment, infrastructure
- R&D relevance
- 0 of 3
- Poland eligible
- Yes
- Country limit
- Poland
- Region
- Any
- Consortium
- Unclear
- Readiness level (TRL)
- —
- Topics
- District heating
- Energy transition
Machine-classified from the call text; check eligibility at the source. 23 Oct 2026
Conditions
Typed facts extracted from the source documents by Scindu's grant-data review. Each value keeps its own conditions. Unknown means unstated, not zero or unlimited.
- Applicant type
- The programme includes entrepreneurs producing or distributing heat through a public district-heating network with the required concession; qualifying project-finance SPVs with at least 51% ownership/voting/profit rights held within specified eligible group relationships; waste-heat recovery entrepreneurs subject to §7.4(1)(b); and housing cooperatives subject to footnote 8 conditions.
SPV requires one of the programme-defined group relationships. Waste-heat and cooperative applicant classes have additional conditions stated in cited provisions.
- Eligible project scope
- Eligible project classes include renewable heat installations ≥1 MW, high-efficiency cogeneration ≥1 MW (excluding fossil fuel and forest biomass), renewable-powered electric boilers ≥1 MW, waste-heat recovery ≥0.5 MW, integrated heat storage and specified heating-network modernization/digitalization/cybersecurity. At least one §7.5.1–7.5.4 project is mandatory; §7.5.5–7.5.6 optional only alongside one.
Subtypes and conditions in §7.5 apply, including geothermal verification, biomass restrictions, renewable electricity and storage integration; do not interpret category labels alone as eligibility.
- Other condition
- Programme intake is continuous; dates, submission method and review process are to be specified by the call notice or call regulations published by NFOŚiGW.
No intake-specific notice or regulations included in captured materials; retain the schedule status as planned.
- Other condition
- Public aid must comply with applicable state-aid rules; costs already financed with other domestic or foreign public funds, including EU funds, cannot be funded again; investment durability is five years from completion.
- Other condition
- At least 70% of annual useful heat from a supported installation must be supplied to the public network; waste and waste-derived fuels, including co-incineration, are excluded; only new devices manufactured no more than 24 months before installation are permitted; DNSH applies.
- Other conditionExact scheduled intake only; no identifier published.
- The current schedule lists the exact route as planned continuous from 1 December 2026 through 31 March 2027, with no call identifier.
Schedule says planned, not open. Call-specific regulations, application form, attachments and final access criteria remain unknown.
- Other conditionProgramme-wide.
- Programme-wide budget is PLN 3 billion: up to PLN 1.2bn non-repayable and PLN 1.8bn repayable support. It does not state a pool for this exact intake.
Do not infer intake allocation or remaining balance.
- Other condition
- The programme runs during 2026–2030; agreements through 29 December 2028 and spending through 31 December 2030. Eligible costs run from 1 July 2026 through 30 September 2030.
- Other condition
- Waste-heat applicants must direct 100% of recovered heat to or for a public network; technical/commercial receipt conditions must be agreed with a licensed distributor/operator, with connection conditions by application and bilateral heat-sale agreement before funding contract.
Amounts and costs
- Eligible cost
- The programme incorporates the NFOŚiGW eligible-cost guidelines. Current guideline §3.3 makes employee remuneration conditionally eligible when project duties are explicitly described and costs are prorated to project work; gross pay and employer statutory charges are eligible components.
Conditional cost category only; programme excludes project-management category 3.2 other than investor/authorship supervision. No job or hiring demand is published.
- Eligible cost
- Programme incorporates NFOŚiGW eligible-cost guidelines with explicit carveouts: preparation costs excluded (except §6(2) stated below); category 3.2 project management excluded except investor/authorship supervision; category 3.4 information/promotion excluded; land purchase 3.5.1 and other costs 3.5.5 excluded; intangible property capped at 20% of eligible investment costs.
Guidelines govern only subject to programme-specific exceptions; direct staff wage eligibility is represented separately.
- Eligible cost limit
- 30 % of eligible costs stated in the application
Only §7.5.6 network undertakings; denominator is application eligible costs.
- Funding intensity, maximum
- 100 maximum loan intensity, percent of eligible costs
Separate from the grant maximum of 50%; actual loan is subject to amount caps and applicable conditions.
- Funding intensity, maximum
- 50 maximum grant intensity, percent of eligible costs
Grant maximum 50%; separate programme loan maximum is 100% of eligible costs. Project-finance own-funds condition applies only to project-finance investments.
- Grace period, maximum
- 12 months
Maximum grace on principal instalments; measured from last-tranche disbursement to first principal repayment, and in no event longer than 12 months after investment completion.
- Loan interest, minimum
- 1.5 percent per annum
Preferential-rate loan option only: WIBOR 3M plus 50 basis points, with a minimum annual rate of 1.5%; a separate market-rate option also exists.
- Loan principal, maximum
- PLN 200,000,000
Grant cap is a separate award ceiling from the loan cap. Market/preferential terms are alternatives; actual award is not guaranteed.
- Loan term, maximum
- 240 months
Maximum financing period is measured from planned first-tranche payment to planned final principal repayment; the exact schedule is set for the loan.
- Own contribution, minimumApplicant’s own contribution to eligible investment cost for project-finance investments.
- 15 percent of eligible investment costs
Project-finance investments only; applicant own funds exclude bank credit, bond issues, shareholder loans and loans from other entities; contribution must be paid-in share capital funded in cash.
- Project funding, maximum
- PLN 50,000,000
Programme maximum grant award; not the total intake pool and subject to exact call rules and applicable public-aid limits.
Personnel and services
Conditional generic eligible cost category; not an advertised job or hiring plan.
Other role · Staff cost the grant can fund
Employee remuneration can qualify if project tasks are clearly stated in job duties and the salary is prorated to project work. Project-management cost category is excluded except investor/authorship supervision. No project-specific hiring, titles, positions, headcount, pay or duration is stated.
Source documents
Call facts
- Opens
- —
- Provider
- NFOŚiGW · Transformacja energetyczna
- Source
- gov.pl
- Checked
- 24 Oct 2026
- Review status
- Partial review
- Independent QA
- No published hold
- Reviewed
- 23 Oct 2026
This is a summary of the source page, not the official text. Eligibility, conditions and the submission system are at the source.