scindu funding
All calls

Fundusz Transformacji Ciepłownictwa

NFOŚiGW · Transformacja energetyczna · National call

db136d945db2b08b

Summary

Not an R&D call a Polish company can use, by Scindu's rule.

Supports transformation of the heating sector; eligible investments and applicant categories are unspecified.

Who can apply
Unclear from the source.
Amount
PLN 50M per project
Deadline
No deadline
Status
Forthcoming
Open the official pageRegister to keep this call

Machine-classified from the call text; check eligibility at the source.

Description

The description is on the provider's page.

Who can apply, in detail
Purpose
Energy, environment, infrastructure
R&D relevance
0 of 3
Poland eligible
Yes
Country limit
Poland
Region
Any
Consortium
Unclear
Readiness level (TRL)
—
Topics
  • District heating
  • Energy transition

Machine-classified from the call text; check eligibility at the source. 23 Oct 2026

Conditions9

Typed facts extracted from the source documents by Scindu's grant-data review. Each value keeps its own conditions. Unknown means unstated, not zero or unlimited.

Applicant type
The programme includes entrepreneurs producing or distributing heat through a public district-heating network with the required concession; qualifying project-finance SPVs with at least 51% ownership/voting/profit rights held within specified eligible group relationships; waste-heat recovery entrepreneurs subject to §7.4(1)(b); and housing cooperatives subject to footnote 8 conditions.

SPV requires one of the programme-defined group relationships. Waste-heat and cooperative applicant classes have additional conditions stated in cited provisions.

Eligible project scope
Eligible project classes include renewable heat installations ≥1 MW, high-efficiency cogeneration ≥1 MW (excluding fossil fuel and forest biomass), renewable-powered electric boilers ≥1 MW, waste-heat recovery ≥0.5 MW, integrated heat storage and specified heating-network modernization/digitalization/cybersecurity. At least one §7.5.1–7.5.4 project is mandatory; §7.5.5–7.5.6 optional only alongside one.

Subtypes and conditions in §7.5 apply, including geothermal verification, biomass restrictions, renewable electricity and storage integration; do not interpret category labels alone as eligibility.

Other condition
Programme intake is continuous; dates, submission method and review process are to be specified by the call notice or call regulations published by NFOŚiGW.

No intake-specific notice or regulations included in captured materials; retain the schedule status as planned.

Other condition
Public aid must comply with applicable state-aid rules; costs already financed with other domestic or foreign public funds, including EU funds, cannot be funded again; investment durability is five years from completion.
Other condition
At least 70% of annual useful heat from a supported installation must be supplied to the public network; waste and waste-derived fuels, including co-incineration, are excluded; only new devices manufactured no more than 24 months before installation are permitted; DNSH applies.
Other conditionExact scheduled intake only; no identifier published.
The current schedule lists the exact route as planned continuous from 1 December 2026 through 31 March 2027, with no call identifier.

Schedule says planned, not open. Call-specific regulations, application form, attachments and final access criteria remain unknown.

Other conditionProgramme-wide.
Programme-wide budget is PLN 3 billion: up to PLN 1.2bn non-repayable and PLN 1.8bn repayable support. It does not state a pool for this exact intake.

Do not infer intake allocation or remaining balance.

Other condition
The programme runs during 2026–2030; agreements through 29 December 2028 and spending through 31 December 2030. Eligible costs run from 1 July 2026 through 30 September 2030.
Other condition
Waste-heat applicants must direct 100% of recovered heat to or for a public network; technical/commercial receipt conditions must be agreed with a licensed distributor/operator, with connection conditions by application and bilateral heat-sale agreement before funding contract.
Amounts and costs11
Eligible cost
The programme incorporates the NFOŚiGW eligible-cost guidelines. Current guideline §3.3 makes employee remuneration conditionally eligible when project duties are explicitly described and costs are prorated to project work; gross pay and employer statutory charges are eligible components.

Conditional cost category only; programme excludes project-management category 3.2 other than investor/authorship supervision. No job or hiring demand is published.

Eligible cost
Programme incorporates NFOŚiGW eligible-cost guidelines with explicit carveouts: preparation costs excluded (except §6(2) stated below); category 3.2 project management excluded except investor/authorship supervision; category 3.4 information/promotion excluded; land purchase 3.5.1 and other costs 3.5.5 excluded; intangible property capped at 20% of eligible investment costs.

Guidelines govern only subject to programme-specific exceptions; direct staff wage eligibility is represented separately.

Eligible cost limit
30 % of eligible costs stated in the application

Only §7.5.6 network undertakings; denominator is application eligible costs.

Funding intensity, maximum
100 maximum loan intensity, percent of eligible costs

Separate from the grant maximum of 50%; actual loan is subject to amount caps and applicable conditions.

Funding intensity, maximum
50 maximum grant intensity, percent of eligible costs

Grant maximum 50%; separate programme loan maximum is 100% of eligible costs. Project-finance own-funds condition applies only to project-finance investments.

Grace period, maximum
12 months

Maximum grace on principal instalments; measured from last-tranche disbursement to first principal repayment, and in no event longer than 12 months after investment completion.

Loan interest, minimum
1.5 percent per annum

Preferential-rate loan option only: WIBOR 3M plus 50 basis points, with a minimum annual rate of 1.5%; a separate market-rate option also exists.

Loan principal, maximum
PLN 200,000,000

Grant cap is a separate award ceiling from the loan cap. Market/preferential terms are alternatives; actual award is not guaranteed.

Loan term, maximum
240 months

Maximum financing period is measured from planned first-tranche payment to planned final principal repayment; the exact schedule is set for the loan.

Own contribution, minimumApplicant’s own contribution to eligible investment cost for project-finance investments.
15 percent of eligible investment costs

Project-finance investments only; applicant own funds exclude bank credit, bond issues, shareholder loans and loans from other entities; contribution must be paid-in share capital funded in cash.

Project funding, maximum
PLN 50,000,000

Programme maximum grant award; not the total intake pool and subject to exact call rules and applicable public-aid limits.

Personnel and services1
  • Conditional generic eligible cost category; not an advertised job or hiring plan.

    Other role · Staff cost the grant can fund

    Employee remuneration can qualify if project tasks are clearly stated in job duties and the salary is prorated to project work. Project-management cost category is excluded except investor/authorship supervision. No project-specific hiring, titles, positions, headcount, pay or duration is stated.

Source documents4
Call facts
Opens
—
Provider
NFOŚiGW · Transformacja energetyczna
Source
gov.pl
Checked
24 Oct 2026
Review status
Partial review
Independent QA
No published hold
Reviewed
23 Oct 2026

This is a summary of the source page, not the official text. Eligibility, conditions and the submission system are at the source.