scindu funding
All calls

Inwestycje z zakresu gospodarki ściekowej, dofinansowane ze środków zagranicznych

WFOŚiGW Katowice · National call

95423

Summary

Not an R&D call a Polish company can use, by Scindu's rule.

Supports wastewater management investments co-financed from foreign sources; eligible applicant types are unspecified.

Who can apply
Unclear from the source.
Amount
Budget not stated
Deadline
No deadline
Status
Open
Open the official pageRegister to keep this call

Machine-classified from the call text; check eligibility at the source.

Description

The description is on the provider's page.

Who can apply, in detail
Purpose
Energy, environment, infrastructure
R&D relevance
0 of 3
Poland eligible
Yes
Country limit
Poland, Silesian Voivodeship
Region
śląskie
Consortium
Unclear
Readiness level (TRL)
—
Topics
  • Wastewater management
  • Foreign co-financing

Machine-classified from the call text; check eligibility at the source. 23 Oct 2026

Conditions35

Typed facts extracted from the source documents by Scindu's grant-data review. Each value keeps its own conditions. Unknown means unstated, not zero or unlimited.

Applicant restrictionCurrent General Rules 49/2026, conditional for exact OW1.2 Fund loan.
The Fund’s general rules exclude contracting with entities that do not meet statutory fee/penalty obligations or have due liabilities to the Fund where collection steps have been taken. The route page’s legal-person applicant statement remains a separate route-specific class.

Conditional Fund contracting screen; exact application may be affected by a later binding provision.

Applicant restrictionCurrent WFOŚiGW Katowice General Rules 49/2026; conditional for exact OW1.2 loan unless displaced by a more specific binding route term or agreement.
The Fund conditions the loan and its amount on creditworthiness under banking law and appropriate legal security for repayment; the exact security form is not named on the route page.
Applicant restrictionCurrent WFOŚiGW Katowice General Rules 49/2026; conditional for exact OW1.2 loan unless displaced by a more specific binding route term or agreement.
The Fund will not contract with entities that do not meet statutory fee/penalty obligations or have due liabilities to the Fund where collection steps have been taken.
Applicant typeExact OW1.2 route prose; no broader applicant class inferred from category metadata.
The exact route page names beneficiaries or potential beneficiaries of foreign funds as the applicant class. It does not name a particular foreign funding programme or define whether that source is public in every case.
Application restrictionExact route page and linked marking PDF captured 2026-10-24.
The route page says paper submissions should not be stapled, bound, or placed in sleeves/folders/binders (except electronic media), and complete sets may also be sent through e-Doręczenia. Its linked marking PDF and page text state that the information board applies to projects planned for more than six months, with a commemorative board within 30 days after completion; these are submission/visibility directions, not eligible-cost promises.
Application restrictionCurrent WFOŚiGW Katowice General Rules 49/2026; conditional for exact OW1.2 loan unless displaced by a more specific binding route term or agreement.
For year-round directions in General Rules §5.2.2, tasks completed before application submission are not funded; this is a general rule, conditional on no more specific applicable exception.
Application restrictionExact route page, captured 2026-10-24.
The route page labels intake continuous. It gives no opening date, deadline, remaining budget, or promise that a later-submitted application will receive funding.
Application restrictionCurrent WFOŚiGW Katowice General Rules 49/2026, conditional for exact OW1.2; physical pp.9–10.
Under current General Rules 49/2026, Fund application forms are provided in its ICT system and applications are registered there. Formal completeness requires proper completion, all necessary information and required documents. The Fund normally gives written completeness/deficiency notice within 30 days of receipt, extendable to 180 days when justified by application volume; the applicant has 30 days to correct after notice (on request and with justification this may extend to 60), otherwise the application receives no further assessment. The Fund may request supplements at any stage. A funding decision or promise is made by the competent Fund body, decisions require tasks fully prepared with documents appropriate to the task and delivery method, and the applicant receives written notice. Unless the decision sets another term, the funding agreement must be concluded within four months; the Fund Board may set a new term on a timely request submitted before expiry, otherwise the decision expires.

General Rules workflow is conditional for exact OW1.2 where not displaced by a more specific route rule or decision. These general requirements do not establish a route-specific HA application form, award, or guarantee of funding.

Application restrictionExact route-linked packages captured 2026-10-24; versions are reported as labelled inside each file.
The exact route links separate sewer-network and wastewater-treatment application ZIPs; the retained packages include part-A instructions and B2 ecological-technical forms marked 2025, while their C2 financial application is a 2026 nested form. These are route-linked submission materials, not proof that generic form product options (including grants) are available under OW1.2; the route itself lists only loan and bridge loan.
Application restrictionRoute-linked B2 attachment-list files; sewer and treatment branches kept distinct; current validity beyond the captured package requires confirmation from the Fund.
For the sewer-network B2 route file, the required attachments list asks for a route plan identifying pipe lengths/diameters/materials, pumps, building connections, tie-in point and streets; permits if required; foreign/national funding application evidence; financing-balance documents; agglomeration designation/map; wastewater-plant acceptance agreement; planned connection list; and technical questionnaire/economic analysis. The linked wastewater-treatment checklist has separate plant-specific site/technology plans and permits. These are file-specific application-document requirements, not a complete legal eligibility rule.
Eligible project scopeAnnual priority classification only; the applicable list depends on the relevant funding year.
The 2026 and 2027 annual priority lists classify OW1.2 as foreign-funded wastewater-management investments under the broader surface- and groundwater-protection direction. The classification confirms programme title alignment, not additional technical eligibility or cost rules.
Eligible project scopeExact OW1.2 route page; project scope as stated.
The exact OW1.2 route covers foreign-funded projects intended to protect surface and groundwater, mainly construction or modernization of wastewater-treatment plants and construction or modernization of wastewater-discharge systems. The page does not give technical thresholds or a detailed eligible-cost list.
Other conditionCurrent WFOŚiGW Katowice General Rules 49/2026; conditional for exact OW1.2 loan unless displaced by a more specific binding route term or agreement.
A beneficiary must mark the project under the Fund’s project-marking rules available on its website.

Conditional on becoming a Fund beneficiary; details are in the separate referenced guidance.

Other conditionCurrent General Rules 49/2026 Table 1 §1.4.2; exact OW1.2 bridge product branch.
The route identifies a bridge-loan branch. Under current General Rules, the 4-to-20-year repayment range, 18-month grace cap and six-month earliest repayment start in §1.4.1 do not apply to bridge loans. The route and reviewed source package do not state a substitute bridge term or repayment schedule.
Other conditionCurrent General Rules 49/2026; conditional only for the exact OW1.2 ordinary loan if expressly granted as remissible; not the bridge branch.
Only if the selected OW1.2 loan product is remissible: under current General Rules, a partial-remission request is conditional on no reimbursement from public funds (including EU funds), timely task completion and settlement, achievement of agreed effects on time, expiry of task durability, at least 50% of used principal repaid on time (early repayment alone does not qualify), and the borrower being current on statutory charges and obligations to the Fund. The exact route page does not identify the loan subtype, so these are conditional general-rule terms, not a route entitlement.

Apply only if the exact route loan is granted as a remissible ordinary loan; the separate bridge-loan branch is non-remissible by definition and is excluded. Apply only if the exact OW1.2 ordinary loan is expressly granted as remissible; bridge loans are non-remissible by definition.

Other conditionCurrent General Rules 49/2026; conditional only for the exact OW1.2 ordinary loan if expressly granted as remissible; not the bridge branch.
Only if this route’s eventual loan is remissible and all joint §3.1 conditions are met: remission is reduced by any Fund grant used on the same task; by 15% for amendments in the specific §3.2.3(a) cases (sewer connections, asbestos-removal mass, or municipal low-emission programmes); by 30% for other amendments reducing planned ecological effect; and by 5% per qualifying document or principal-installment delay exceeding 30 days. The §2.3(a) examples are not treated as OW1.2 conditions. Loans for tasks resulting from an administrative order to remove pollution consequences are not eligible for remission. These are conditional general rules, not evidence of this route’s loan subtype or remission entitlement.

Conditional on eventual remissible subtype, all joint §3.1 prerequisites and the precise facts in each cited subclause. §3.2.3(a) examples are not treated as route terms; the 30%/5% reductions and §3.4 exclusion apply only within their cited scopes. Apply only if the exact route loan is granted as a remissible ordinary loan; the separate bridge-loan branch is non-remissible by definition and is excluded. Apply only if the exact OW1.2 ordinary loan is expressly granted as remissible; bridge loans are non-remissible by definition.

Other conditionCurrent General Rules 49/2026; conditional only for the exact OW1.2 ordinary loan if expressly granted as remissible; not the bridge branch.
Submitting a partial-remission request does not suspend current payments. Under the remission agreement, amounts paid under the loan after the remission request are refunded, without interest on the refunded sums.

Only if the loan subtype is remissible and a remission request and agreement occur. This does not establish that the route loan is remissible or that remission will be granted. Apply only if the exact route loan is granted as a remissible ordinary loan; the separate bridge-loan branch is non-remissible by definition and is excluded. Apply only if the exact OW1.2 ordinary loan is expressly granted as remissible; bridge loans are non-remissible by definition.

Other conditionCurrent General Rules 49/2026; conditional only for the exact OW1.2 ordinary loan if expressly granted as remissible; not the bridge branch.
Only if the eventual OW1.2 loan is remissible and a remission request is made: General Rules 49/2026 place decisions up to 0.5% of the Fund’s prior-year revenue with the Management Board and larger decisions with the Supervisory Board; the approved amount cannot exceed the borrower’s actual obligations under the loan contract on the request date. The rules in force on request date govern the decision; the Fund contracts with the applicant for the partial remission and controls the new task funded from remission proceeds. This is conditional procedure, not evidence that OW1.2 loan is remissible or remission will be approved.

Apply only if the exact route loan is granted as a remissible ordinary loan; the separate bridge-loan branch is non-remissible by definition and is excluded. Apply only if the exact OW1.2 ordinary loan is expressly granted as remissible; bridge loans are non-remissible by definition.

Other conditionCurrent WFOŚiGW Katowice General Rules 49/2026; conditional for exact OW1.2 loan unless displaced by a more specific binding route term or agreement.
A Fund-financing agreement is generally concluded after applicant selection of contractors or suppliers; earlier conclusion is possible when justified by the project’s nature.

Conditional general contract-process rule; the exact route does not establish procurement timing or a project-specific exception.

Other conditionCurrent WFOŚiGW Katowice General Rules 49/2026; conditional for exact OW1.2 loan unless displaced by a more specific binding route term or agreement.
Fund support settlement counts expenditures incurred after the date the application was submitted, documented by invoices and related payment confirmations; both invoice date and payment date must satisfy this rule.
Other conditionCurrent General Rules 49/2026; current 2026/2027 priority versions retained separately.
Fund support is based on the current annual priority list, project-selection criteria, Fund financial plan, and General Rules, subject to applicable public-aid law. This establishes the governing decision framework but does not assert a route-specific score or funding entitlement.
Other conditionExact route-linked B2 forms and 2026 effect table; OW1.3/OW1.4 rows are not transferred as OW1.2 eligibility.
B2 forms request description of existing and planned technologies, physical scope, anticipated ecological effect and its verification; the separate 2026 recommended-effects table has wastewater-treatment and sewer-network rows under OW1.3 and OW1.4, not OW1.2. Those rows offer technical/effect-reporting examples but are not treated as OW1.2 eligibility or cost authority.
Other conditionCurrent WFOŚiGW Katowice General Rules 49/2026; conditional for exact OW1.2 loan unless displaced by a more specific binding route term or agreement.
The beneficiary must maintain durability of the investment project created through the funded task for at least five years from its completion.
Other conditionCurrent WFOŚiGW Katowice General Rules 49/2026; conditional for exact OW1.2 loan unless displaced by a more specific binding route term or agreement.
Foreign-currency invoices are settled using the NBP average exchange rate announced for the business day before the invoice date.

Applies only if the project has qualifying foreign-currency invoices.

Other conditionCurrent WFOŚiGW Katowice General Rules 49/2026; conditional for exact OW1.2 loan unless displaced by a more specific binding route term or agreement.
At every stage of task implementation, the beneficiary must inform the Fund of the amount of financing obtained from other sources.
Other conditionCurrent WFOŚiGW Katowice General Rules 49/2026; conditional for exact OW1.2 loan unless displaced by a more specific binding route term or agreement.
General rules permit advance payments according to the physical-financial schedule up to 90% of its value; for tasks financed through the state-budget targeted reserve, advances may reach 100%. The remaining amount is paid against invoices after previously paid advances are settled. This is a disbursement mechanism, not a total financing rate.

Conditional general disbursement rule; the route does not establish targeted-reserve financing, an awarded schedule, or actual advance amount.

Other conditionCurrent WFOŚiGW Katowice General Rules 49/2026; conditional for exact OW1.2 loan unless displaced by a more specific binding route term or agreement.
Planned installments are paid no more often than once per calendar quarter.

Conditional on Fund support being disbursed in installments.

Other conditionCurrent WFOŚiGW Katowice General Rules 49/2026; conditional for exact OW1.2 loan unless displaced by a more specific binding route term or agreement.
Installments, including advances, are conditional on Fund acceptance of a settlement reflecting current project progress and planned disbursements; subsequent advance installments also require accepted settlement of invoices for the prior advance.

Conditional general disbursement conditions; actual award and schedule are unknown.

Other conditionExact OW1.2 route page and the captured linked package versions; no salary or personnel eligibility inferred from engineering/forms.
The exact route page and linked forms reviewed do not provide a current OW1.2 itemized cost schedule, explicit payroll or external-service eligibility, hiring plan, job title, headcount, salary or pay-rate rule. The 2014 physical-financial schedule in the linked packages is historical and was not treated as current cost authority.
Other conditionCurrent General Rules 49/2026 Table 1 §§1.3.1, 1.3.5, 1.3.7; conditional for an exact OW1.2 Fund loan where the common rule governs, including a bridge loan unless displaced by a more specific term.
Under the general ordinary-loan rule, interest is preferential and variable by the bill rediscount rate; the applicable coefficient is applied to the rate in force on the first day of the contract month, and the rate is adjusted each subsequent month using the rediscount or base rate in force on that month’s first day. Public-aid loans may use the distinct §1.3.6 base-rate-plus-margin method, already stated separately in this packet. The exact contract rate remains unknown.

Under General Rules §§1.3.1, 1.3.5 and 1.3.7, Fund loans use a preferential variable SRW-based rate, set against the applicable rate on the first day of the contract month and adjusted in later months to the rate in force on each month’s first day. General Rules define bridge loans as non-remissible and do not state a bridge-specific exception to this rate mechanism; actual bridge/ordinary contract rate remains unknown. Public-aid rate treatment is a distinct conditional alternative stated separately.

Other conditionCurrent General Rules 49/2026 Table 1 §1.4.1(b),(d); conditional for exact OW1.2 ordinary loan only.
For an ordinary loan governed by General Rules §1.4, one-half of principal must be scheduled for repayment over no less than half the repayment period; repayment may begin no earlier than six months after the contractually stated project-completion date. The rule excludes bridge loans.
Other conditionRequirements stated in linked 2025 B2 checklists; do not treat the form alone as current statutory eligibility; general Rules separately require five-year durability for funded investment.
The linked B2 checklists require the owner or perpetual usufructuary to document at least five-year operation/use assurance after commissioning; where the applicant is a tenant/lessee/user, the checklist calls for the underlying agreement and owner consent plus the five-year assurance if that agreement ends. The exact checklist variants differ between sewer and plant projects.
Other conditionExact route-linked public-aid ZIP inventory; no aid regime or rate assigned to all OW1.2 applicants.
The exact route page links a separate public-aid attachments archive. Its contents include multiple aid forms/regulations and a 2026 Form Pp3; the route page does not establish which applicant or project is subject to a particular public-aid regime. Applicability and the applicable aid intensity/conditions remain project-specific and unresolved.
Other conditionCurrent General Rules 49/2026 Table 1 §1.3.6; conditional for exact OW1.2 loan branch where public-aid rules apply, subject to any more specific term.
For tasks governed by public-aid rules, the Fund may set a different annual interest calculation using the base rate at contract date plus the margin under the applicable European Commission communication, but not below the corresponding §1.3.2, §1.3.3 or §1.3.4 floor. The specific aid regime and resulting rate for an OW1.2 applicant are unknown.

For loans governed by public-aid rules, the Fund may set a different annual rate using the base rate at contract date plus the applicable Commission-communication margin, but not below the stated floors. No exact aid regime, bridge-specific rate or OW1.2 contract rate is established by the route page.

Other conditionExact OW1.2 route financing line plus current General Rules definition; product terms remain subject to the actual decision and contract.
The exact route page lists two financing forms: a loan and a bridge loan. It does not state a fixed amount, interest rate, term, grace period, forgiveness status for the ordinary loan, or security terms; the bridge loan is a separate non-remissible instrument under the current General Rules definition.
Amounts and costs16
Eligible costCurrent WFOŚiGW Katowice General Rules 49/2026; conditional for exact OW1.2 unless displaced by a more specific binding route term or agreement.
General eligible costs are the physical-financial schedule items necessary to achieve the ecological effect and allowed by the schedule instructions. For publicly co-financed tasks, eligible costs also follow the rules of those public funding sources. No exact OW1.2 asbestos-specific cost line list or unit cap is established by the reviewed exact route page.
Funding intensity, maximumCurrent WFOŚiGW Katowice General Rules 49/2026 §4; conditionally applicable to exact call 95423 whenever Fund support and other public support finance the same task, irrespective of Fund support form, unless a more specific binding term displaces the rule; bridge loans are excepted. This does not establish availability of a grant, loan subtype, route-specific award, or remaining budget.
100 percent of eligible project costs combined from Fund and other public sources

General Rules 49/2026 §4: where a task receives both WFOŚiGW Fund support and support from other public sources, their combined support may not exceed 100% of eligible task costs, except for bridge loans. This is a general aggregate ceiling, not a route-specific product entitlement or award cap; apply only when both kinds of support finance the task and no more specific binding term displaces it.

Grace period, maximumCurrent General Rules 49/2026 Table 1 §1.4.1(c), conditional for exact OW1.2 ordinary loan only; not the bridge branch.
18 months maximum after contractually stated project completion

For ordinary loans governed by §1.4.1, grace is measured after the project-completion date specified in the agreement. §1.4.2 expressly excludes bridge loans; no replacement bridge grace term is stated in the route or this review.

Loan interest, minimumCurrent General Rules 49/2026 Table 1 §1.3.3; conditional for exact OW1.2 non-remissible ordinary or bridge loan unless a more specific binding term displaces it.
1.5 percent per annum minimum for non-remissible loans

General Rules §1.3.3 states this annual floor for non-remissible loans. Because the route lists a bridge loan and General Rules define bridge loans as non-remissible, the provision may cover the bridge branch absent a more specific applicable term; the route does not state an actual bridge rate, and the signed rate is unknown.

Loan interest, minimumCurrent General Rules 49/2026 Table 1 §1.3.4; conditional only for an eligible gmina/powiat ordinary remissible loan under exact OW1.2.
2 percent per annum minimum

Only where the applicant is a gmina or powiat eligible for the equalization component of general subsidy in the application year and the selected ordinary loan is remissible; the exact route does not identify a particular local-government applicant. Bridge loans are non-remissible by definition and are outside this reduced remissible-loan floor.

Loan interest, minimumCurrent General Rules 49/2026 Table 1 §1.3.2; conditional for exact OW1.2 ordinary loan only if the Fund grants it as remissible.
3 percent per annum minimum for remissible loans

Only if the exact OW1.2 ordinary loan is expressly made remissible: the General Rules set this annual floor. The route lists a bridge loan separately; by definition it is non-remissible and therefore is not this remissible-loan rate branch. The actual contract rate is unknown.

Loan partial remission, maximum amountCurrent General Rules 49/2026; conditional only for the exact OW1.2 ordinary loan if expressly granted as remissible; not the bridge branch.
PLN 200,000

10% of principal used, capped at PLN 200,000; no earmark to a new task. Apply only if the exact route loan is granted as a remissible ordinary loan; the separate bridge-loan branch is non-remissible by definition and is excluded. Apply only if the exact OW1.2 ordinary loan is expressly granted as remissible; bridge loans are non-remissible by definition.

Loan partial remission, maximum amountCurrent General Rules 49/2026; conditional only for the exact OW1.2 ordinary loan if expressly granted as remissible; not the bridge branch.
PLN 4,000,000

35% of principal used; remission proceeds must fund a qualifying new environmental task. Apply only if the exact route loan is granted as a remissible ordinary loan; the separate bridge-loan branch is non-remissible by definition and is excluded. Apply only if the exact OW1.2 ordinary loan is expressly granted as remissible; bridge loans are non-remissible by definition.

Loan partial remission, maximum shareCurrent General Rules 49/2026; conditional only for the exact OW1.2 ordinary loan if expressly granted as remissible; not the bridge branch.
10 percent of principal used

Alternative A; capped at PLN 200,000 and has no new-task earmark. Apply only if the exact route loan is granted as a remissible ordinary loan; the separate bridge-loan branch is non-remissible by definition and is excluded. Apply only if the exact OW1.2 ordinary loan is expressly granted as remissible; bridge loans are non-remissible by definition.

Loan partial remission, maximum shareCurrent General Rules 49/2026; conditional only for the exact OW1.2 ordinary loan if expressly granted as remissible; not the bridge branch.
35 percent of principal used

Alternative B; requires remission proceeds for a new environmental task aligned with Environmental Protection Law objectives, with separate PLN 4m cap. Apply only if the exact route loan is granted as a remissible ordinary loan; the separate bridge-loan branch is non-remissible by definition and is excluded. Apply only if the exact OW1.2 ordinary loan is expressly granted as remissible; bridge loans are non-remissible by definition.

Loan principal, maximum shareCurrent General Rules 49/2026 Table 1 §§1.2.1 and 1.2.3; conditional for exact OW1.2 loan instrument subject to a more specific route term and actual decision.
100 percent of eligible task costs

General Rules Table 1 §1.2.1 state that Fund loans may reach 100% of eligible costs depending on ecological effects and Fund financial capacity. For publicly cofinanced tasks, the separate §1.2.3(a) own-contribution rule and §1.2.3(b) bridge-loan cap may also matter. These are ceilings and conditions, not an OW1.2 award or available balance.

Loan principal, maximum shareCurrent General Rules 49/2026 Table 1 §1.2.3(a) and Table 7 definition 4; conditional for exact OW1.2 public-source cofinancing.
100 percent of beneficiary own contribution for a publicly cofinanced task

Only if the task is cofinanced from public sources, the General Rules allow Fund support up to 100% of the beneficiary’s own contribution, defined as eligible task costs less public aid obtained. The route says “foreign funds” but does not establish that every such source is public or identify the own-contribution amount. This is distinct from the separate bridge-loan ceiling in §1.2.3(b).

Loan principal, maximum shareCurrent General Rules 49/2026 Table 1 §1.2.3(b), conditional for exact OW1.2 bridge-loan branch and public-source project cofinancing.
100 percent of public-source cofinancing obtained

Only if the selected product is a bridge loan and the OW1.2 task is cofinanced from public sources: the current General Rules permit a bridge loan up to 100% of public-source financing obtained. The route only says “foreign funds”; whether the relevant source qualifies as public is unresolved. This is a ceiling, not a route award promise.

Repayment required before remission, minimumCurrent General Rules 49/2026; conditional only for the exact OW1.2 ordinary loan if expressly granted as remissible; not the bridge branch.
50 percent of loan principal used, repaid on time

Only if eventual loan subtype is remissible, all joint §3.1 prerequisites apply, and early repayment alone is not enough; this is a general conditional prerequisite, not an OW1.2 entitlement. Apply only if the exact route loan is granted as a remissible ordinary loan; the separate bridge-loan branch is non-remissible by definition and is excluded. Apply only if the exact OW1.2 ordinary loan is expressly granted as remissible; bridge loans are non-remissible by definition.

Loan term, maximumCurrent General Rules 49/2026 Table 1 §1.4.1(a), conditional for exact OW1.2 ordinary loan only; not the bridge branch.
240 months maximum from contractually stated project-completion date, including grace

For ordinary loans governed by §1.4.1, the maximum repayment period, including grace, is measured from the project-completion date specified in the agreement. §1.4.2 expressly excludes bridge loans; no replacement bridge repayment term is stated in the route or this review.

Loan term, minimumCurrent General Rules 49/2026 Table 1 §1.4.1(a), conditional for exact OW1.2 ordinary loan only; not the bridge branch.
48 months minimum from contractually stated project-completion date, including grace

For ordinary loans governed by §1.4.1, the minimum repayment period includes grace and runs from the project-completion date specified in the agreement. §1.4.2 expressly excludes bridge loans; no replacement bridge repayment term is stated in the route or this review.

Source documents9
Call facts
Opens
—
Provider
WFOŚiGW Katowice
Checked
24 Oct 2026
Review status
Partial review
Independent QA
No published hold
Reviewed
24 Oct 2026

This is a summary of the source page, not the official text. Eligibility, conditions and the submission system are at the source.