Inwestycje w zakresie dostosowania do zmian klimatu, przeciwdziałania suszy, ograniczenia zużycia wody oraz ochrony przeciwpowodziowej
WFOŚiGW Katowice · National call
Summary
Not an R&D call a Polish company can use, by Scindu's rule.
Funds investments in climate adaptation, drought prevention, reduced water consumption and flood protection; eligible applicant types are unspecified.
- Who can apply
- Unclear from the source.
- Amount
- Budget not stated
- Deadline
- No deadline
- Status
- Open
Machine-classified from the call text; check eligibility at the source.
Description
The description is on the provider's page.
Who can apply, in detail
- Purpose
- Energy, environment, infrastructure
- R&D relevance
- 0 of 3
- Poland eligible
- Yes
- Country limit
- Poland, Silesian Voivodeship
- Region
- śląskie
- Consortium
- Unclear
- Readiness level (TRL)
- —
- Topics
- Climate adaptation
- Drought prevention
- Water conservation
- Flood protection
Machine-classified from the call text; check eligibility at the source. 23 Oct 2026
Conditions
Typed facts extracted from the source documents by Scindu's grant-data review. Each value keeps its own conditions. Unknown means unstated, not zero or unlimited.
- Applicant restrictionCurrent general rules effective 1 May 2026; exact continuous GW1.2 route, subject to any route-specific financing decision or contract.
- The Fund will not contract with entities that fail environmental-fee/penalty obligations or have due Fund liabilities subject to collection proceedings.
Apply only where relevant to the selected financing form and the Fund’s decision; route-specific terms remain controlling.
- Applicant restrictionCurrent general rules effective 1 May 2026; exact continuous GW1.2 route, subject to any route-specific financing decision or contract.
- The Fund conditions loan approval and amount on the applicant’s creditworthiness and appropriate legal security for repayment.
The appropriate security is determined in the loan decision/contract; no fixed security ratio is stated here.
- Applicant typeExact GW1.2 route page.
- The route UI displays categories including local-government units, enterprises/SMEs, NGOs, universities, public healthcare bodies, housing cooperatives/communities/TBS and state budget units. The operative prose separately says the applicant is an investor holding a legal title to dispose of the property.
Do not treat UI category tags alone as exemption from the prose property-title condition. The page does not enumerate which legal titles qualify.
- Application restrictionGeneral rules Resolution 49/2026 effective 1 May 2026.; conditional general-rule applicability to the exact continuous GW1.2 route.
- Fund-funded expenditure considered at settlement must be incurred after the application date and supported by invoices and related proof of payment.
The route page does not specify a project-specific eligible-cost end date; this general rule covers post-application documentation, subject to the contract and any more specific future rules.
- Application restrictionExact GW1.2 route-linked h_retencja.zip archive.
- The archive includes the 2018 retention attachment list, 2025 application instructions, B2 water form, municipal C1 financial form, December 2025 A12 main application and the 2026 effects table. The attachment list instructs applicants to use then-current forms and warns that additional information may be requested during negotiations and contracting.
The route links this archive, but names and dates show mixed vintage. The archive does not identify which exact form version currently governs each applicant class; verify the current submission package.
- Application restrictionExact GW1.2 route page.
- The route page permits submitting a complete file electronically through e-Doręczenia and says paper documents should not be stapled, bound, placed in sleeves, folders or binders, except electronic media.
Follow the exact current submission instruction at filing.
- Application restrictionExact Katowice call pl_wfosigw_katowice:95431 / GW1.2.
- The route page labels GW1.2 a continuous call; the exact local index v18 row marks this call open.
As captured on 23 Oct 2026. The call does not publish a closing date, a remaining balance, or a current yearly call pool.
- Eligible project scopeDirectly linked 2026 effects table, GW1.2 entries.
- The route-linked 2026 effects table provides distinct GW1.2 measures for retention reservoirs and for climate adaptation through natural or artificial retention. For the latter it lists rainwater-use installations, de-sealing surfaces and green walls/roofs, with capacity/area and water-use/volume effects.
These are ecological/physical-effect examples and verification provisions, not a complete eligible-cost catalogue. The table says entries may be modified by task type and scope; exact application terms still govern.
- Eligible project scopeExact GW1.2 route page.
- The route covers investments adapting to climate change, preventing drought, limiting water use and protecting against floods, including use of monitoring and management technologies. The description focuses on flood and drought protection and water supply.
This is a route purpose, not a line-item cost catalogue. Exact cost categories and technical thresholds remain unestablished by the route page.
- Other conditionCurrent General Rules Resolution 49/2026, Table 3 §§3.1 and 3.3.1–3.3.3; conditional general loan rules, not a route-specific promise.; conditional general-rule applicability to the exact continuous GW1.2 route.
- A borrower may request partial remission only where the loan was not reimbursed from public funds, including EU funds, and all stated conditions are met together: the loan-funded task was completed and settled within the contractual period; planned ecological and material effects were achieved by contractual deadlines; the project durability period expired; at least 50% of the amount used was repaid on time (early repayment does not qualify to request remission); and the borrower met statutory fees and penalties and its obligations to the Fund. The Fund’s decision is discretionary, made by the competent Fund body, and cannot exceed the borrower’s actual outstanding obligations under that loan on the application date. These are general rules for partial remission only if the route’s eventual loan agreement is a remissible loan and the Fund approves remission. The exact route page does not establish that this particular loan will be remissible; no universal route entitlement is asserted.
These are general rules for partial remission only if the route’s eventual loan agreement is a remissible loan and the Fund approves remission. The exact route page does not establish that this GW1.2 loan will be remissible; no universal route entitlement is asserted.
- Other conditionCurrent General Rules Resolution 49/2026, Table 3 §3.2.1(a); conditional only if this route results in a remissible loan and the Fund approves remission.; conditional general-rule applicability to the exact continuous GW1.2 route.
- If partial remission is approved under Table 3 §3.2.1(a), it may be up to 10% of the loan amount used, capped at PLN 0.2 million; this option does not require the remitted amount to be spent on a new ecological task. This is an alternative general remission rule, not a route-specific entitlement. These are general rules for partial remission only if the route’s eventual loan agreement is a remissible loan and the Fund approves remission. The exact route page does not establish that this particular loan will be remissible; no universal route entitlement is asserted.
Conditional current General Rules only if a loan is awarded under a remissible structure and the Fund approves remission; this is not a universal GW1.2 benefit.
- Other conditionCurrent General Rules Resolution 49/2026, Table 3 §3.2.1(b); conditional only if this route results in a remissible loan and the Fund approves remission.; conditional general-rule applicability to the exact continuous GW1.2 route.
- Alternatively, if partial remission is approved under Table 3 §3.2.1(b), it may be up to 35% of the loan amount used, capped at PLN 4 million, only if the remitted amount is allocated to a new ecological task consistent with the Environmental Protection Law. The two §3.2.1 alternatives are alternatives, not additive caps. This is a general conditional rule, not a route-specific entitlement. These are general rules for partial remission only if the route’s eventual loan agreement is a remissible loan and the Fund approves remission. The exact route page does not establish that this particular loan will be remissible; no universal route entitlement is asserted.
Conditional current General Rules only if a loan is awarded under a remissible structure and the Fund approves remission; this is not a universal GW1.2 benefit.
- Other conditionCurrent general rules effective 1 May 2026; exact continuous GW1.2 route, subject to any route-specific financing decision or contract.
- The beneficiary must maintain the investment’s durability for at least five years from its completion and report other-source support to the Fund at every implementation stage.
Apply only where relevant to the selected financing form and the Fund’s decision; route-specific terms remain controlling.
- Other conditionRoute-linked h_retencja.zip, dated 2018 attachment-list member; informative with applicability caveat.
- The linked retention archive contains an attachment list (2018) that asks for legal-status documents, situation plan, required administrative decisions/permits, evidence of financial balance, and the exact application/forms. It states an owner or perpetual usufruct holder should provide a five-year-use undertaking and land-register evidence; tenants/users should provide their agreement and owner consent plus an owner five-year-use undertaking.
The attachment list is a 2018 member in the current route-linked archive. It does not identify its present applicability; the exact call page itself only states legal title to dispose of the property. Treat the five-year and attachment specifics as archived guidance pending confirmation against current application requirements.
- Other conditionExact GW1.2 route page, with current general rules used only for the loan branch.
- The route offers loans and grants in special cases. The route page does not specify a grant percentage or amount, nor whether a particular loan would be remissible or non-remissible.
General Rules loan terms are conditional on a loan being awarded and apply subject to any more specific decision/contract. Do not assume the exceptional grant branch has a loan rate or remission.
- Other conditionExact GW1.2 route page and official Katowice signage rules.
- For projects whose construction work lasts more than six months, the route page requires an information plaque; it requires a commemorative plaque within 30 days after task completion.
The route page directs applicants to points I and II of the current signage rules for the detailed specifications.
- Other conditionGeneral rules effective 1 May 2026; exact GW1.2 call.
- The current general rules limit combined Fund and other public support to 100% of eligible task costs, except bridge loans. This does not establish a route-specific grant percentage or absolute loan ceiling.
Combined public support cap only; exact eligible-cost lines and route-specific award amount are not provided in the route materials.
- Other conditionCurrent General Rules Resolution 49/2026, Table 3 §3.4; conditional general loan rules.; conditional general-rule applicability to the exact continuous GW1.2 route.
- The General Rules exclude remission for loans granted to carry out a task arising from an administrative order to remove environmental contamination. Applicability to a route project must be assessed from the actual task and order; this does not establish that the route itself is categorically excluded. These are general rules for partial remission only if the route’s eventual loan agreement is a remissible loan and the Fund approves remission. The exact route page does not establish that this particular loan will be remissible; no universal route entitlement is asserted.
Conditional current General Rules only if a loan is awarded under a remissible structure and the Fund approves remission; this is not a universal GW1.2 benefit.
- Other conditionCurrent General Rules Resolution 49/2026, Table 3 §3.3.5; conditional general loan rules.; conditional general-rule applicability to the exact continuous GW1.2 route.
- Filing a remission request does not suspend current payment obligations under the loan agreement. Under a separate remission agreement, the Fund returns qualifying instalments paid after the request date without interest on returned amounts. These are general rules for partial remission only if the route’s eventual loan agreement is a remissible loan and the Fund approves remission. The exact route page does not establish that this particular loan will be remissible; no universal route entitlement is asserted.
Conditional current General Rules only if a loan is awarded under a remissible structure and the Fund approves remission; this is not a universal GW1.2 benefit.
- Other conditionCurrent General Rules Resolution 49/2026, Table 3 §§3.2.2–3.2.3; conditional general loan rules, not a route-specific promise.; conditional general-rule applicability to the exact continuous GW1.2 route.
- The approved remission is reduced by any Fund grant used for the same task. The remaining remission is reduced by 15% where an agreement amendment reduces specified ecological effects for sewer connections, asbestos disposal tasks, or municipal low-emission programmes; by 30% where an amendment reduces other planned ecological effects; by 5% each time required disbursement, final settlement, or effect-confirmation documents are submitted more than 30 days late; and by 5% each time a principal instalment is more than 30 days late. These reductions apply to the remission amount after the grant offset. These are general rules for partial remission only if the route’s eventual loan agreement is a remissible loan and the Fund approves remission. The exact route page does not establish that this particular loan will be remissible; no universal route entitlement is asserted.
Conditional current General Rules only if a loan is awarded under a remissible structure and the Fund approves remission; this is not a universal GW1.2 benefit.
- Other conditionCurrent general rules effective 1 May 2026; exact continuous GW1.2 route, subject to any route-specific financing decision or contract.
- Fund resources are public funds, so beneficiaries must apply public-procurement law to their expenditure; public-aid rules apply where relevant.
The route links a public-aid forms archive, but the exact applicable aid regime depends on the applicant and circumstances; archive presence does not establish that aid applies.
Amounts and costs
- Eligible costGeneral eligible-cost definition; detailed GW1.2 expenditure line eligibility remains unresolved.; conditional general-rule applicability to the exact continuous GW1.2 route.
- Eligible costs are schedule items necessary to achieve the environmental effect and specified in the relevant schedule-filling instruction; the scope of investment performed using the beneficiary’s own forces is excluded.
The linked product page and retained application archives do not identify a separate, current GW1.2 cost catalogue/instruction that establishes the exact eligible expenditure lines. No salaries, job titles, staff headcounts or payroll eligibility are inferred from forms or project scope.
- Funding intensity, maximumGeneral loan rules, Resolution 49/2026 Table 1 §§1.2.1–1.2.2, effective 1 May 2026; standard-loan branch only for exact GW 1.2. The route also lists grant financing in special cases; its grant terms are not stated here.
- 100 percent of eligible project costs
The up-to-100% value is the maximum for the standard-loan branch only; it is not a grant rate or an award promise. Where a loan and grant are combined in one task, total support cannot exceed 100% of eligible costs under Table 1 §1.2.2. The exact route page does not set the special-case grant percentage or eligibility. The Fund may offer less after assessing ecological effects and its available resources.
- Grace period, maximumGeneral rules Resolution 49/2026 effective 1 May 2026.; conditional general-rule applicability to the exact continuous GW1.2 route.
- 18 months after contractual task-completion date
The terms do not apply to bridge loans. Actual contractual dates and repayment schedule are established by the Fund.
- Loan interest, minimumGeneral rules Resolution 49/2026 effective 1 May 2026, conditional non-remissible loan branch.; conditional general-rule applicability to the exact continuous GW1.2 route.
- 1.5 percent per annum minimum
Only if the application receives a non-remissible loan; this route also has grant financing and does not determine subtype. Public-aid cases may use a base-rate-plus-margin calculation subject to the applicable minimum.
- Loan interest, minimumGeneral rules Resolution 49/2026 effective 1 May 2026; only if a remissible-loan structure is granted.; conditional general-rule applicability to the exact continuous GW1.2 route.
- 3 percent per annum minimum, subject to the stated municipality exception
Only if the application receives a remissible loan; the route page does not determine subtype. The 2% floor applies only to qualifying municipalities/counties in the application year.
- Loan partial remission, maximum amountCurrent General Rules Resolution 49/2026, Table 3 §3.2.1(a), absolute cap paired with the 10% of used-loan alternative; exact route GW 1.2., conditional only.
- PLN 200,000
Conditional General Rules Resolution 49/2026 provisions only apply if the Fund actually grants a loan under this route and the applicable loan is eligible for partial remission, and the Fund approves remission. The exact route does not establish the chosen loan subtype or guarantee remission. The loan must not have been reimbursed from public funds, including EU funds. Table 3 §3.1 conditions are cumulative: the loan-funded task is completed and settled within the contractual period; planned ecological and material effects are achieved by contractual deadlines; project durability expires; at least 50% of the amount used is repaid on time (early repayment does not qualify); and statutory fees, penalties and Fund obligations are met. The Fund decision is discretionary and cannot exceed actual outstanding obligations on the application date. Any Fund grant for the same task offsets remission under §3.2.2, and reductions in §3.2.3 apply. Rules apply to Fund decisions from 1 May 2026 under §§16–17, subject to the source’s effective-date and agreement clauses; remission decisions consider rules in force on the remission-application date under §3.3.2. This is not a route-specific entitlement and does not imply that a bridge-loan or any other loan subtype is eligible for remission.Conditional General Rules Resolution 49/2026 provisions only apply if the Fund actually grants a loan under this route and the applicable loan is eligible for partial remission, and the Fund approves remission. The exact route does not establish the chosen loan subtype or guarantee remission. Table 3 §3.1 conditions are cumulative: the loan-funded task is completed and settled within the contractual period; planned ecological and material effects are achieved by contractual deadlines; project durability expires; at least 50% of the amount used is repaid on time (early repayment does not qualify); and statutory fees, penalties and Fund obligations are met. The Fund decision is discretionary and cannot exceed actual outstanding obligations on the application date. Any Fund grant for the same task offsets remission under §3.2.2, and reductions in §3.2.3 apply. Rules apply to Fund decisions from 1 May 2026 under §§16–17, subject to the source’s effective-date and agreement clauses; remission decisions consider rules in force on the remission-application date under §3.3.2. This is not a route-specific entitlement and does not imply that a bridge-loan or any other loan subtype is eligible for remission. Conditional general-rule remission only; requires a qualifying remissible loan and discretionary Fund approval. It is an alternative to §3.2.1(b), not additive. No new ecological task is required by this branch. All cumulative §3.1 conditions, §3.2.2 grant offset, §3.2.3 reductions, and §3.3 procedure still apply.
- Loan partial remission, maximum amountCurrent General Rules Resolution 49/2026, Table 3 §3.2.1(b), absolute cap paired with the 35% of used-loan alternative; exact route GW 1.2., conditional only.
- PLN 4,000,000
Conditional General Rules Resolution 49/2026 provisions only apply if the Fund actually grants a loan under this route and the applicable loan is eligible for partial remission, and the Fund approves remission. The exact route does not establish the chosen loan subtype or guarantee remission. The loan must not have been reimbursed from public funds, including EU funds. Table 3 §3.1 conditions are cumulative: the loan-funded task is completed and settled within the contractual period; planned ecological and material effects are achieved by contractual deadlines; project durability expires; at least 50% of the amount used is repaid on time (early repayment does not qualify); and statutory fees, penalties and Fund obligations are met. The Fund decision is discretionary and cannot exceed actual outstanding obligations on the application date. Any Fund grant for the same task offsets remission under §3.2.2, and reductions in §3.2.3 apply. Rules apply to Fund decisions from 1 May 2026 under §§16–17, subject to the source’s effective-date and agreement clauses; remission decisions consider rules in force on the remission-application date under §3.3.2. This is not a route-specific entitlement and does not imply that a bridge-loan or any other loan subtype is eligible for remission.Conditional General Rules Resolution 49/2026 provisions only apply if the Fund actually grants a loan under this route and the applicable loan is eligible for partial remission, and the Fund approves remission. The exact route does not establish the chosen loan subtype or guarantee remission. Table 3 §3.1 conditions are cumulative: the loan-funded task is completed and settled within the contractual period; planned ecological and material effects are achieved by contractual deadlines; project durability expires; at least 50% of the amount used is repaid on time (early repayment does not qualify); and statutory fees, penalties and Fund obligations are met. The Fund decision is discretionary and cannot exceed actual outstanding obligations on the application date. Any Fund grant for the same task offsets remission under §3.2.2, and reductions in §3.2.3 apply. Rules apply to Fund decisions from 1 May 2026 under §§16–17, subject to the source’s effective-date and agreement clauses; remission decisions consider rules in force on the remission-application date under §3.3.2. This is not a route-specific entitlement and does not imply that a bridge-loan or any other loan subtype is eligible for remission. Conditional general-rule remission only; requires a qualifying remissible loan and discretionary Fund approval. It is an alternative to §3.2.1(a), not additive. The forgiven amount must be allocated to a new ecological task consistent with the Environmental Protection Law. All cumulative §3.1 conditions, §3.2.2 grant offset, §3.2.3 reductions, and §3.3 procedure still apply.
- Loan partial remission, maximum shareCurrent General Rules Resolution 49/2026, Table 3 §3.2.1(a), alternative partial-remission share; exact route GW 1.2., conditional only.
- 10 percent of loan amount used
Conditional General Rules Resolution 49/2026 provisions only apply if the Fund actually grants a loan under this route and the applicable loan is eligible for partial remission, and the Fund approves remission. The exact route does not establish the chosen loan subtype or guarantee remission. The loan must not have been reimbursed from public funds, including EU funds. Table 3 §3.1 conditions are cumulative: the loan-funded task is completed and settled within the contractual period; planned ecological and material effects are achieved by contractual deadlines; project durability expires; at least 50% of the amount used is repaid on time (early repayment does not qualify); and statutory fees, penalties and Fund obligations are met. The Fund decision is discretionary and cannot exceed actual outstanding obligations on the application date. Any Fund grant for the same task offsets remission under §3.2.2, and reductions in §3.2.3 apply. Rules apply to Fund decisions from 1 May 2026 under §§16–17, subject to the source’s effective-date and agreement clauses; remission decisions consider rules in force on the remission-application date under §3.3.2. This is not a route-specific entitlement and does not imply that a bridge-loan or any other loan subtype is eligible for remission.Conditional General Rules Resolution 49/2026 provisions only apply if the Fund actually grants a loan under this route and the applicable loan is eligible for partial remission, and the Fund approves remission. The exact route does not establish the chosen loan subtype or guarantee remission. Table 3 §3.1 conditions are cumulative: the loan-funded task is completed and settled within the contractual period; planned ecological and material effects are achieved by contractual deadlines; project durability expires; at least 50% of the amount used is repaid on time (early repayment does not qualify); and statutory fees, penalties and Fund obligations are met. The Fund decision is discretionary and cannot exceed actual outstanding obligations on the application date. Any Fund grant for the same task offsets remission under §3.2.2, and reductions in §3.2.3 apply. Rules apply to Fund decisions from 1 May 2026 under §§16–17, subject to the source’s effective-date and agreement clauses; remission decisions consider rules in force on the remission-application date under §3.3.2. This is not a route-specific entitlement and does not imply that a bridge-loan or any other loan subtype is eligible for remission. Conditional general-rule remission only; requires a qualifying remissible loan and discretionary Fund approval. It is an alternative to §3.2.1(b), not additive. No new ecological task is required by this branch. All cumulative §3.1 conditions, §3.2.2 grant offset, §3.2.3 reductions, and §3.3 procedure still apply.
- Loan partial remission, maximum shareCurrent General Rules Resolution 49/2026, Table 3 §3.2.1(b), alternative partial-remission share; exact route GW 1.2., conditional only.
- 35 percent of loan amount used
Conditional General Rules Resolution 49/2026 provisions only apply if the Fund actually grants a loan under this route and the applicable loan is eligible for partial remission, and the Fund approves remission. The exact route does not establish the chosen loan subtype or guarantee remission. The loan must not have been reimbursed from public funds, including EU funds. Table 3 §3.1 conditions are cumulative: the loan-funded task is completed and settled within the contractual period; planned ecological and material effects are achieved by contractual deadlines; project durability expires; at least 50% of the amount used is repaid on time (early repayment does not qualify); and statutory fees, penalties and Fund obligations are met. The Fund decision is discretionary and cannot exceed actual outstanding obligations on the application date. Any Fund grant for the same task offsets remission under §3.2.2, and reductions in §3.2.3 apply. Rules apply to Fund decisions from 1 May 2026 under §§16–17, subject to the source’s effective-date and agreement clauses; remission decisions consider rules in force on the remission-application date under §3.3.2. This is not a route-specific entitlement and does not imply that a bridge-loan or any other loan subtype is eligible for remission.Conditional General Rules Resolution 49/2026 provisions only apply if the Fund actually grants a loan under this route and the applicable loan is eligible for partial remission, and the Fund approves remission. The exact route does not establish the chosen loan subtype or guarantee remission. Table 3 §3.1 conditions are cumulative: the loan-funded task is completed and settled within the contractual period; planned ecological and material effects are achieved by contractual deadlines; project durability expires; at least 50% of the amount used is repaid on time (early repayment does not qualify); and statutory fees, penalties and Fund obligations are met. The Fund decision is discretionary and cannot exceed actual outstanding obligations on the application date. Any Fund grant for the same task offsets remission under §3.2.2, and reductions in §3.2.3 apply. Rules apply to Fund decisions from 1 May 2026 under §§16–17, subject to the source’s effective-date and agreement clauses; remission decisions consider rules in force on the remission-application date under §3.3.2. This is not a route-specific entitlement and does not imply that a bridge-loan or any other loan subtype is eligible for remission. Conditional general-rule remission only; requires a qualifying remissible loan and discretionary Fund approval. It is an alternative to §3.2.1(a), not additive. The forgiven amount must be allocated to a new ecological task consistent with the Environmental Protection Law. All cumulative §3.1 conditions, §3.2.2 grant offset, §3.2.3 reductions, and §3.3 procedure still apply.
- Repayment required before remission, minimumCurrent General Rules Resolution 49/2026, Table 3 §3.1(d), conditional partial-remission repayment prerequisite for GW 1.2.; route does not select loan subtype or create remission entitlement.
- 50 percent of loan amount used repaid on time
Conditional General Rules Resolution 49/2026 provisions only apply if the Fund actually grants a loan under this route and the applicable loan is eligible for partial remission, and the Fund approves remission. The exact route does not establish the chosen loan subtype or guarantee remission. The loan must not have been reimbursed from public funds, including EU funds. Table 3 §3.1 conditions are cumulative: the loan-funded task is completed and settled within the contractual period; planned ecological and material effects are achieved by contractual deadlines; project durability expires; at least 50% of the amount used is repaid on time (early repayment does not qualify); and statutory fees, penalties and Fund obligations are met. The Fund decision is discretionary and cannot exceed actual outstanding obligations on the application date. Any Fund grant for the same task offsets remission under §3.2.2, and reductions in §3.2.3 apply. Rules apply to Fund decisions from 1 May 2026 under §§16–17, subject to the source’s effective-date and agreement clauses; remission decisions consider rules in force on the remission-application date under §3.3.2. This is not a route-specific entitlement and does not imply that a bridge-loan or any other loan subtype is eligible for remission.
- Loan term, maximumGeneral rules Resolution 49/2026 effective 1 May 2026.; conditional general-rule applicability to the exact continuous GW1.2 route.
- 240 months from contractual task-completion date, including grace
The contract sets the actual period after financial analysis and public-aid rules; minimum repayment period is 4 years. Bridge loans are excepted from these terms.
- Loan term, minimumConditional standard ordinary-loan repayment-period minimum under General Rules Resolution 49/2026, Table 1 §1.4.1(a), for route GW 1.2.; not a bridge-loan term and not evidence that this route selects an ordinary loan.
- 48 months of loan repayment term, including grace, counted from contractual task-completion date
Only if an ordinary (non-bridge) loan is actually contracted under these General Rules. The source period includes the grace period and is measured from the task-completion date stated in the agreement. General Rules §1.4.2 expressly excludes bridge loans from these conditions; the route’s listed financing does not select a loan subtype. The actual schedule is set by financial analysis and public-aid requirements. General Rules Resolution 49/2026 is effective for Fund decisions from 1 May 2026 subject to §§16–17.
Source documents
- GW1.2 climate adaptation, drought prevention, water use and flood protection route page
- Katowice general funding rules, Resolution 49/2026, effective from 1 May 2026
- Priority projects planned for Katowice Fund financing in 2027, Resolution 73/2026
- Katowice signage rules linked by exact route
- Application Instruction 2025
Call facts
- Opens
- —
- Provider
- WFOŚiGW Katowice
- Source
- wfosigw.katowice.pl
- Checked
- 24 Oct 2026
- Review status
- Partial review
- Independent QA
- No published hold
- Reviewed
- 23 Oct 2026