Wymiana zdegradowanych sieci wodociągowych, w których występują znaczne straty wody
WFOŚiGW Katowice · National call
Summary
Not an R&D call a Polish company can use, by Scindu's rule.
Funds replacement of degraded water supply networks with significant water losses; eligible applicant types are unspecified.
- Who can apply
- Unclear from the source.
- Amount
- Budget not stated
- Deadline
- No deadline
- Status
- Open
Machine-classified from the call text; check eligibility at the source.
Description
The description is on the provider's page.
Who can apply, in detail
- Purpose
- Energy, environment, infrastructure
- R&D relevance
- 0 of 3
- Poland eligible
- Yes
- Country limit
- Poland, Silesian Voivodeship
- Region
- śląskie
- Consortium
- Unclear
- Readiness level (TRL)
- —
- Topics
- Water supply network replacement
- Water loss reduction
Machine-classified from the call text; check eligibility at the source. 23 Oct 2026
Conditions
Typed facts extracted from the source documents by Scindu's grant-data review. Each value keeps its own conditions. Unknown means unstated, not zero or unlimited.
- Applicant restrictionCurrent Resolution 49/2026; conditional applicability to GW4.3, ordinary-loan branch.
- The Fund will not contract with entities that fail environmental-fee/penalty obligations or have due Fund liabilities subject to collection proceedings.
Apply only if a standard loan is offered under these terms; bridge loan terms remain separately scoped.
- Applicant restrictionCurrent Resolution 49/2026; conditional applicability to GW4.3, ordinary-loan branch.
- The Fund conditions loan approval and amount on the applicant’s creditworthiness and appropriate legal security for repayment.
The appropriate security is determined in the loan decision/contract; no fixed security ratio is stated here. Applies only to the exact GW4.3 ordinary-loan route; current route page lists no bridge-loan or grant branch.
- Applicant typeExact GW4.3 route page.
- The UI displays several applicant categories, while the route prose restricts the stated applicant to entities providing collective drinking-water supply services.
The route prose is the call-specific applicant statement; the broad category tags do not independently establish eligibility without that service condition.
- Application restrictionGeneral rules Resolution 49/2026 effective 1 May 2026.; conditional ordinary-loan applicability to exact GW4.3 route.
- Fund-funded expenditure considered at settlement must be incurred after the application date and supported by invoices and related proof of payment.
The route page does not specify a project-specific eligible-cost end date; this general rule covers post-application documentation, subject to the contract and any more specific future rules. Applies only to the exact GW4.3 ordinary-loan route; current route page lists no bridge-loan or grant branch.
- Application restrictionExact pl_wfosigw_katowice:95438 / GW4.3.
- GW4.3 is a continuous route; exact local index v18 row is marked open.
Captured 23 Oct 2026. No closing date, route pool, remaining balance, per-project ceiling or rate is stated on the exact page.
- Eligible project scopeKatowice 2027 priority list, GW4.3, physical p.5.
- The 2027 priority list has a distinct GW4.3 row for replacement of degraded water-supply networks with significant water losses.
The row corroborates the route topic but does not establish a numeric threshold, call allocation or award cap.
- Eligible project scopeExact GW4.3 route page.
- The route is for replacing degraded water-supply networks where significant water losses occur.
The route page does not define a numeric threshold for “significant” losses; no minimum percentage is inferred from the 2026 effects form.
- Other conditionCurrent General Rules Resolution 49/2026, Table 3 §§3.1 and 3.3.1–3.3.3; conditional general loan rules, not a route-specific promise.; conditional ordinary-loan applicability to exact GW4.3 route.
- A borrower may request partial remission only where the loan was not reimbursed from public funds, including EU funds, and all stated conditions are met together: the loan-funded task was completed and settled within the contractual period; planned ecological and material effects were achieved by contractual deadlines; the project durability period expired; at least 50% of the amount used was repaid on time (early repayment does not qualify to request remission); and the borrower met statutory fees and penalties and its obligations to the Fund. The Fund’s decision is discretionary, made by the competent Fund body, and cannot exceed the borrower’s actual outstanding obligations under that loan on the application date. These are general rules for partial remission only if the route’s eventual loan agreement is a remissible loan and the Fund approves remission. The exact route page does not establish that this particular loan will be remissible; no universal route entitlement is asserted.
These are general rules for partial remission only if the route’s eventual loan agreement is a remissible loan and the Fund approves remission. The exact route page does not establish that this particular loan will be remissible; no universal route entitlement is asserted. This does not assert that a bridge loan is remissible; the exact route does not specify the loan subtype.
- Other conditionCurrent General Rules Resolution 49/2026, Table 3 §3.2.1(a); conditional only if this route results in a remissible loan and the Fund approves remission.; conditional ordinary-loan applicability to exact GW4.3 route.
- If partial remission is approved under Table 3 §3.2.1(a), it may be up to 10% of the loan amount used, capped at PLN 0.2 million; this option does not require the remitted amount to be spent on a new ecological task. This is an alternative general remission rule, not a route-specific entitlement. These are general rules for partial remission only if the route’s eventual loan agreement is a remissible loan and the Fund approves remission. The exact route page does not establish that this particular loan will be remissible; no universal route entitlement is asserted.
Conditional current General Rules only if a loan is awarded under a remissible structure and the Fund approves remission; this is not a universal GW4.3 benefit. This does not assert that a bridge loan is remissible; the exact route does not specify the loan subtype.
- Other conditionCurrent General Rules Resolution 49/2026, Table 3 §3.2.1(b); conditional only if this route results in a remissible loan and the Fund approves remission.; conditional ordinary-loan applicability to exact GW4.3 route.
- Alternatively, if partial remission is approved under Table 3 §3.2.1(b), it may be up to 35% of the loan amount used, capped at PLN 4 million, only if the remitted amount is allocated to a new ecological task consistent with the Environmental Protection Law. The two §3.2.1 alternatives are alternatives, not additive caps. This is a general conditional rule, not a route-specific entitlement. These are general rules for partial remission only if the route’s eventual loan agreement is a remissible loan and the Fund approves remission. The exact route page does not establish that this particular loan will be remissible; no universal route entitlement is asserted.
Conditional current General Rules only if a loan is awarded under a remissible structure and the Fund approves remission; this is not a universal GW4.3 benefit. This does not assert that a bridge loan is remissible; the exact route does not specify the loan subtype.
- Other conditionCurrent Resolution 49/2026; conditional applicability to GW4.3, ordinary-loan branch.
- The beneficiary must maintain the investment’s durability for at least five years from its completion and report other-source support to the Fund at every implementation stage.
Apply only if a standard loan is offered under these terms; bridge loan terms remain separately scoped.
- Other conditionDirectly linked water-pipe archive, 2026 effect table, GW4.3 row.
- The linked 2026 effect table records network length, diameters, material and service connections/tie-ins; the ecological effect is reduction of water losses from a stated baseline percentage to a target percentage and number of people benefiting from improved water supply.
The form leaves project-specific baseline and target values blank for the applicant to complete. It does not establish a generic threshold for significant losses or a funding rate.
- Other conditionExact GW4.3 linked archive, 2025 water-pipe application files.
- The directly linked archive includes 2025 application forms with separate qualified and nonqualified total-project-cost fields.
The forms do not establish which individual lines are eligible under the current route, and their exact current mandatory status is unresolved. No cost or payroll eligibility is inferred.
- Other conditionDirectly linked water-pipe archive, 2026 effect table, GW4.3 row.
- The 2026 effect table lists final acceptance, connection/tie-in protocols, construction completion or use permit records where required and measurements/data for the stated water-loss and beneficiary effects.
These are evidence for reported effects, not a cost eligibility list.
- Other conditionExact GW4.3 linked archive; 2018 water-pipe attachment list.
- The route links water-pipe application materials. Its retained 2018 attachment list includes legal-status documents, a location plan, permits where required, financing-balance documents, title/land-use evidence, a five-year use undertaking, technical survey and economic analysis.
The attached list is a 2018 archive member, and explicitly refers to currently applicable forms; it is not treated as a complete current 2026 submission checklist.
- Other conditionExact GW4.3 route page.
- The exact route page lists a loan as its funding instrument.
This is the route-specific listed form; general loan conditions remain subject to individual decision and agreement.
- Other conditionExact GW4.3 route page.
- The current page permits complete paper filing or e-Doręczenia and requires route signage for construction taking more than six months, plus a commemorative plaque within 30 days after completion.
Follow current submission instructions and linked signage rules.
- Other conditionCurrent General Rules Resolution 49/2026, Table 3 §3.4; conditional general loan rules.; conditional ordinary-loan applicability to exact GW4.3 route.
- The General Rules exclude remission for loans granted to carry out a task arising from an administrative order to remove environmental contamination. Applicability to a route project must be assessed from the actual task and order; this does not establish that the route itself is categorically excluded. These are general rules for partial remission only if the route’s eventual loan agreement is a remissible loan and the Fund approves remission. The exact route page does not establish that this particular loan will be remissible; no universal route entitlement is asserted.
Conditional current General Rules only if a loan is awarded under a remissible structure and the Fund approves remission; this is not a universal GW4.3 benefit. This does not assert that a bridge loan is remissible; the exact route does not specify the loan subtype.
- Other conditionCurrent General Rules Resolution 49/2026, Table 3 §3.3.5; conditional general loan rules.; conditional ordinary-loan applicability to exact GW4.3 route.
- Filing a remission request does not suspend current payment obligations under the loan agreement. Under a separate remission agreement, the Fund returns qualifying instalments paid after the request date without interest on returned amounts. These are general rules for partial remission only if the route’s eventual loan agreement is a remissible loan and the Fund approves remission. The exact route page does not establish that this particular loan will be remissible; no universal route entitlement is asserted.
Conditional current General Rules only if a loan is awarded under a remissible structure and the Fund approves remission; this is not a universal GW4.3 benefit. This does not assert that a bridge loan is remissible; the exact route does not specify the loan subtype.
- Other conditionCurrent General Rules Resolution 49/2026, Table 3 §§3.2.2–3.2.3; conditional general loan rules, not a route-specific promise.; conditional ordinary-loan applicability to exact GW4.3 route.
- The approved remission is reduced by any Fund grant used for the same task. The remaining remission is reduced by 15% where an agreement amendment reduces specified ecological effects for sewer connections, asbestos disposal tasks, or municipal low-emission programmes; by 30% where an amendment reduces other planned ecological effects; by 5% each time required disbursement, final settlement, or effect-confirmation documents are submitted more than 30 days late; and by 5% each time a principal instalment is more than 30 days late. These reductions apply to the remission amount after the grant offset. These are general rules for partial remission only if the route’s eventual loan agreement is a remissible loan and the Fund approves remission. The exact route page does not establish that this particular loan will be remissible; no universal route entitlement is asserted.
Conditional current General Rules only if a loan is awarded under a remissible structure and the Fund approves remission; this is not a universal GW4.3 benefit. This does not assert that a bridge loan is remissible; the exact route does not specify the loan subtype.
- Other conditionCurrent Resolution 49/2026; conditional applicability to GW4.3, ordinary-loan branch.
- Fund resources are public funds, so beneficiaries must apply public-procurement law to their expenditure; public-aid rules apply where relevant.
The route links a public-aid forms archive, but the exact applicable aid regime depends on the applicant and circumstances; archive presence does not establish that aid applies. Applies only to the exact GW4.3 ordinary-loan route; current route page lists no bridge-loan or grant branch.
Amounts and costs
- Eligible costGeneral eligible-cost definition; detailed GW4.3 expenditure line eligibility remains unresolved.
- Eligible costs are schedule items necessary to achieve the environmental effect and specified in the relevant schedule-filling instruction; the scope of investment performed using the beneficiary’s own forces is excluded.
The linked product page and retained application archives do not identify a separate, current GW4.3 cost catalogue/instruction that establishes the exact eligible expenditure lines. No salaries, job titles, staff headcounts or payroll eligibility are inferred from forms or project scope. Applies only to the exact GW4.3 ordinary-loan route; current route page lists no bridge-loan or grant branch.
- Funding intensity, maximumGeneral rules effective 1 May 2026; exact continuous GW 4.3 ordinary-loan route.
- 100 percent of eligible project costs
Maximum intensity, not a promise of a 100% award or a fixed principal amount. The Fund may offer a different form or amount after its economic analysis. Applies only to the exact GW4.3 ordinary-loan route; current route page lists no bridge-loan or grant branch.
- Grace period, maximumGeneral rules Resolution 49/2026 effective 1 May 2026.; conditional ordinary-loan applicability to exact GW4.3 route.
- 18 months after contractual task-completion date
The terms do not apply to bridge loans. Actual contractual dates and repayment schedule are established by the Fund. This standard-loan clause is not assigned to the route’s bridge-loan option without a specific term. Applies only to the exact GW4.3 ordinary-loan route; current route page lists no bridge-loan or grant branch.
- Loan interest, minimumGeneral rules Resolution 49/2026 effective 1 May 2026, conditional non-remissible loan branch.; conditional ordinary-loan applicability to exact GW4.3 route.
- 1.5 percent per annum minimum
Only if the application receives a non-remissible loan; the exact GW4.3 route page lists an ordinary loan only and does not determine its subtype; it lists no grant or bridge-loan branch. Public-aid cases may use a base-rate-plus-margin calculation subject to the applicable minimum.
- Loan interest, minimumGeneral rules Resolution 49/2026 effective 1 May 2026; only if a remissible-loan structure is granted.; conditional ordinary-loan applicability to exact GW4.3 route.
- 3 percent per annum minimum, subject to the stated municipality exception
Only if the application receives a remissible loan; the route page does not determine subtype. The 2% floor applies only to qualifying municipalities/counties in the application year.
- Loan partial remission, maximum amountCurrent General Rules Resolution 49/2026, Table 3 §3.2.1(a), absolute cap paired with the 10% of used-loan alternative; exact route GW 4.3., conditional only.
- PLN 200,000
Conditional General Rules Resolution 49/2026 provisions only apply if the Fund actually grants a loan under this route and the applicable loan is eligible for partial remission, and the Fund approves remission. The exact route does not establish the chosen loan subtype or guarantee remission. The loan must not have been reimbursed from public funds, including EU funds. Table 3 §3.1 conditions are cumulative: the loan-funded task is completed and settled within the contractual period; planned ecological and material effects are achieved by contractual deadlines; project durability expires; at least 50% of the amount used is repaid on time (early repayment does not qualify); and statutory fees, penalties and Fund obligations are met. The Fund decision is discretionary and cannot exceed actual outstanding obligations on the application date. Any Fund grant for the same task offsets remission under §3.2.2, and reductions in §3.2.3 apply. Rules apply to Fund decisions from 1 May 2026 under §§16–17, subject to the source’s effective-date and agreement clauses; remission decisions consider rules in force on the remission-application date under §3.3.2. This is not a route-specific entitlement and does not imply that a bridge-loan or any other loan subtype is eligible for remission.Conditional General Rules Resolution 49/2026 provisions only apply if the Fund actually grants a loan under this route and the applicable loan is eligible for partial remission, and the Fund approves remission. The exact route does not establish the chosen loan subtype or guarantee remission. Table 3 §3.1 conditions are cumulative: the loan-funded task is completed and settled within the contractual period; planned ecological and material effects are achieved by contractual deadlines; project durability expires; at least 50% of the amount used is repaid on time (early repayment does not qualify); and statutory fees, penalties and Fund obligations are met. The Fund decision is discretionary and cannot exceed actual outstanding obligations on the application date. Any Fund grant for the same task offsets remission under §3.2.2, and reductions in §3.2.3 apply. Rules apply to Fund decisions from 1 May 2026 under §§16–17, subject to the source’s effective-date and agreement clauses; remission decisions consider rules in force on the remission-application date under §3.3.2. This is not a route-specific entitlement and does not imply that a bridge-loan or any other loan subtype is eligible for remission. Conditional general-rule remission only; requires a qualifying remissible loan and discretionary Fund approval. It is an alternative to §3.2.1(b), not additive. No new ecological task is required by this branch. All cumulative §3.1 conditions, §3.2.2 grant offset, §3.2.3 reductions, and §3.3 procedure still apply.
- Loan partial remission, maximum amountCurrent General Rules Resolution 49/2026, Table 3 §3.2.1(b), absolute cap paired with the 35% of used-loan alternative; exact route GW 4.3., conditional only.
- PLN 4,000,000
Conditional General Rules Resolution 49/2026 provisions only apply if the Fund actually grants a loan under this route and the applicable loan is eligible for partial remission, and the Fund approves remission. The exact route does not establish the chosen loan subtype or guarantee remission. The loan must not have been reimbursed from public funds, including EU funds. Table 3 §3.1 conditions are cumulative: the loan-funded task is completed and settled within the contractual period; planned ecological and material effects are achieved by contractual deadlines; project durability expires; at least 50% of the amount used is repaid on time (early repayment does not qualify); and statutory fees, penalties and Fund obligations are met. The Fund decision is discretionary and cannot exceed actual outstanding obligations on the application date. Any Fund grant for the same task offsets remission under §3.2.2, and reductions in §3.2.3 apply. Rules apply to Fund decisions from 1 May 2026 under §§16–17, subject to the source’s effective-date and agreement clauses; remission decisions consider rules in force on the remission-application date under §3.3.2. This is not a route-specific entitlement and does not imply that a bridge-loan or any other loan subtype is eligible for remission.Conditional General Rules Resolution 49/2026 provisions only apply if the Fund actually grants a loan under this route and the applicable loan is eligible for partial remission, and the Fund approves remission. The exact route does not establish the chosen loan subtype or guarantee remission. Table 3 §3.1 conditions are cumulative: the loan-funded task is completed and settled within the contractual period; planned ecological and material effects are achieved by contractual deadlines; project durability expires; at least 50% of the amount used is repaid on time (early repayment does not qualify); and statutory fees, penalties and Fund obligations are met. The Fund decision is discretionary and cannot exceed actual outstanding obligations on the application date. Any Fund grant for the same task offsets remission under §3.2.2, and reductions in §3.2.3 apply. Rules apply to Fund decisions from 1 May 2026 under §§16–17, subject to the source’s effective-date and agreement clauses; remission decisions consider rules in force on the remission-application date under §3.3.2. This is not a route-specific entitlement and does not imply that a bridge-loan or any other loan subtype is eligible for remission. Conditional general-rule remission only; requires a qualifying remissible loan and discretionary Fund approval. It is an alternative to §3.2.1(a), not additive. The forgiven amount must be allocated to a new ecological task consistent with the Environmental Protection Law. All cumulative §3.1 conditions, §3.2.2 grant offset, §3.2.3 reductions, and §3.3 procedure still apply.
- Loan partial remission, maximum shareCurrent General Rules Resolution 49/2026, Table 3 §3.2.1(a), alternative partial-remission share; exact route GW 4.3., conditional only.
- 10 percent of loan amount used
Conditional General Rules Resolution 49/2026 provisions only apply if the Fund actually grants a loan under this route and the applicable loan is eligible for partial remission, and the Fund approves remission. The exact route does not establish the chosen loan subtype or guarantee remission. The loan must not have been reimbursed from public funds, including EU funds. Table 3 §3.1 conditions are cumulative: the loan-funded task is completed and settled within the contractual period; planned ecological and material effects are achieved by contractual deadlines; project durability expires; at least 50% of the amount used is repaid on time (early repayment does not qualify); and statutory fees, penalties and Fund obligations are met. The Fund decision is discretionary and cannot exceed actual outstanding obligations on the application date. Any Fund grant for the same task offsets remission under §3.2.2, and reductions in §3.2.3 apply. Rules apply to Fund decisions from 1 May 2026 under §§16–17, subject to the source’s effective-date and agreement clauses; remission decisions consider rules in force on the remission-application date under §3.3.2. This is not a route-specific entitlement and does not imply that a bridge-loan or any other loan subtype is eligible for remission.Conditional General Rules Resolution 49/2026 provisions only apply if the Fund actually grants a loan under this route and the applicable loan is eligible for partial remission, and the Fund approves remission. The exact route does not establish the chosen loan subtype or guarantee remission. Table 3 §3.1 conditions are cumulative: the loan-funded task is completed and settled within the contractual period; planned ecological and material effects are achieved by contractual deadlines; project durability expires; at least 50% of the amount used is repaid on time (early repayment does not qualify); and statutory fees, penalties and Fund obligations are met. The Fund decision is discretionary and cannot exceed actual outstanding obligations on the application date. Any Fund grant for the same task offsets remission under §3.2.2, and reductions in §3.2.3 apply. Rules apply to Fund decisions from 1 May 2026 under §§16–17, subject to the source’s effective-date and agreement clauses; remission decisions consider rules in force on the remission-application date under §3.3.2. This is not a route-specific entitlement and does not imply that a bridge-loan or any other loan subtype is eligible for remission. Conditional general-rule remission only; requires a qualifying remissible loan and discretionary Fund approval. It is an alternative to §3.2.1(b), not additive. No new ecological task is required by this branch. All cumulative §3.1 conditions, §3.2.2 grant offset, §3.2.3 reductions, and §3.3 procedure still apply.
- Loan partial remission, maximum shareCurrent General Rules Resolution 49/2026, Table 3 §3.2.1(b), alternative partial-remission share; exact route GW 4.3., conditional only.
- 35 percent of loan amount used
Conditional General Rules Resolution 49/2026 provisions only apply if the Fund actually grants a loan under this route and the applicable loan is eligible for partial remission, and the Fund approves remission. The exact route does not establish the chosen loan subtype or guarantee remission. The loan must not have been reimbursed from public funds, including EU funds. Table 3 §3.1 conditions are cumulative: the loan-funded task is completed and settled within the contractual period; planned ecological and material effects are achieved by contractual deadlines; project durability expires; at least 50% of the amount used is repaid on time (early repayment does not qualify); and statutory fees, penalties and Fund obligations are met. The Fund decision is discretionary and cannot exceed actual outstanding obligations on the application date. Any Fund grant for the same task offsets remission under §3.2.2, and reductions in §3.2.3 apply. Rules apply to Fund decisions from 1 May 2026 under §§16–17, subject to the source’s effective-date and agreement clauses; remission decisions consider rules in force on the remission-application date under §3.3.2. This is not a route-specific entitlement and does not imply that a bridge-loan or any other loan subtype is eligible for remission.Conditional General Rules Resolution 49/2026 provisions only apply if the Fund actually grants a loan under this route and the applicable loan is eligible for partial remission, and the Fund approves remission. The exact route does not establish the chosen loan subtype or guarantee remission. Table 3 §3.1 conditions are cumulative: the loan-funded task is completed and settled within the contractual period; planned ecological and material effects are achieved by contractual deadlines; project durability expires; at least 50% of the amount used is repaid on time (early repayment does not qualify); and statutory fees, penalties and Fund obligations are met. The Fund decision is discretionary and cannot exceed actual outstanding obligations on the application date. Any Fund grant for the same task offsets remission under §3.2.2, and reductions in §3.2.3 apply. Rules apply to Fund decisions from 1 May 2026 under §§16–17, subject to the source’s effective-date and agreement clauses; remission decisions consider rules in force on the remission-application date under §3.3.2. This is not a route-specific entitlement and does not imply that a bridge-loan or any other loan subtype is eligible for remission. Conditional general-rule remission only; requires a qualifying remissible loan and discretionary Fund approval. It is an alternative to §3.2.1(a), not additive. The forgiven amount must be allocated to a new ecological task consistent with the Environmental Protection Law. All cumulative §3.1 conditions, §3.2.2 grant offset, §3.2.3 reductions, and §3.3 procedure still apply.
- Repayment required before remission, minimumCurrent General Rules Resolution 49/2026, Table 3 §3.1(d), conditional partial-remission repayment prerequisite for GW 4.3.; route does not select loan subtype or create remission entitlement.
- 50 percent of loan amount used repaid on time
Conditional General Rules Resolution 49/2026 provisions only apply if the Fund actually grants a loan under this route and the applicable loan is eligible for partial remission, and the Fund approves remission. The exact route does not establish the chosen loan subtype or guarantee remission. The loan must not have been reimbursed from public funds, including EU funds. Table 3 §3.1 conditions are cumulative: the loan-funded task is completed and settled within the contractual period; planned ecological and material effects are achieved by contractual deadlines; project durability expires; at least 50% of the amount used is repaid on time (early repayment does not qualify); and statutory fees, penalties and Fund obligations are met. The Fund decision is discretionary and cannot exceed actual outstanding obligations on the application date. Any Fund grant for the same task offsets remission under §3.2.2, and reductions in §3.2.3 apply. Rules apply to Fund decisions from 1 May 2026 under §§16–17, subject to the source’s effective-date and agreement clauses; remission decisions consider rules in force on the remission-application date under §3.3.2. This is not a route-specific entitlement and does not imply that a bridge-loan or any other loan subtype is eligible for remission.
- Loan term, maximumGeneral rules Resolution 49/2026 effective 1 May 2026.; conditional ordinary-loan applicability to exact GW4.3 route.
- 240 months from contractual task-completion date, including grace
The contract sets the actual period after financial analysis and public-aid rules; minimum repayment period is 4 years. Bridge loans are excepted from these terms. This standard-loan clause is not assigned to the route’s bridge-loan option without a specific term. Applies only to the exact GW4.3 ordinary-loan route; current route page lists no bridge-loan or grant branch.
- Loan term, minimumConditional standard ordinary-loan repayment-period minimum under General Rules Resolution 49/2026, Table 1 §1.4.1(a), for route GW 4.3.; not a bridge-loan term and not evidence that this route selects an ordinary loan.
- 48 months of loan repayment term, including grace, counted from contractual task-completion date
Only if an ordinary (non-bridge) loan is actually contracted under these General Rules. The source period includes the grace period and is measured from the task-completion date stated in the agreement. General Rules §1.4.2 expressly excludes bridge loans from these conditions; the route’s listed financing does not select a loan subtype. The actual schedule is set by financial analysis and public-aid requirements. General Rules Resolution 49/2026 is effective for Fund decisions from 1 May 2026 subject to §§16–17.
Source documents
Call facts
- Opens
- —
- Provider
- WFOŚiGW Katowice
- Source
- wfosigw.katowice.pl
- Checked
- 24 Oct 2026
- Review status
- Partial review
- Independent QA
- No published hold
- Reviewed
- 23 Oct 2026
This is a summary of the source page, not the official text. Eligibility, conditions and the submission system are at the source.