scindu funding
All calls

Pokrywanie kosztów zagospodarowania odpadów z wypadków, zgodnie z obowiązkiem ustawowym

WFOŚiGW Katowice · National call

OZ 1.3.

Summary

Not an R&D call a Polish company can use, by Scindu's rule.

Covers accident waste management costs under a statutory obligation; eligible applicant types are unspecified.

Who can apply
Unclear from the source.
Amount
Budget not stated
Deadline
No deadline
Status
Open
Open the official pageRegister to keep this call

Machine-classified from the call text; check eligibility at the source.

Description

The description is on the provider's page.

Who can apply, in detail
Purpose
Energy, environment, infrastructure
R&D relevance
0 of 3
Poland eligible
Yes
Country limit
Poland, Silesian Voivodeship
Region
śląskie
Consortium
Unclear
Readiness level (TRL)
—
Topics
  • Accident waste management
  • Environmental incident cleanup

Machine-classified from the call text; check eligibility at the source. 23 Oct 2026

Conditions12

Typed facts extracted from the source documents by Scindu's grant-data review. Each value keeps its own conditions. Unknown means unstated, not zero or unlimited.

Applicant restrictionConditional General Rules 49/2026 applicant screen for exact Katowice OZ1.3; route-specific terms may supplement it.
Under current General Rules, the Fund does not contract with entities failing to pay statutory fees or penalties, or with due Fund liabilities for which collection action has been taken. This is a conditional general screen, not a complete OZ1.3 eligibility list.
Applicant typeExact Katowice route 95445; taxonomy and applicant prose on the same page.
The route page taxonomy lists local-government units and state budgetary units, while its prose says “jst (starosta)”. Keep the explicit page taxonomy/prose difference unresolved; the route does not establish that all PJB are eligible independently of the Starosta wording.
Application restrictionConditional General Rules procedure for the exact continuous route, together with OZ1.3 page submission instructions; exact route-specific filing system/forms remain unresolved.
Under General Rules for continuous routes, Fund accepts applications throughout the year, but does not finance a task under that rule if completed before the application date. General settlement rules count only invoices and related payments made after filing (with a stated exception for specific soil-contamination tasks, not identified as this route). The route page itself also permits complete electronic filing through e-Doręczenia and says paper documents should not be stapled/bound or placed in sleeves/folders/binders.
Application restrictionExact Katowice route 95445 as of the captured route response (23 Oct 2026) and local index clock.
The exact route page labels the call type and filing period as continuous. The local row snapshot records status open, with no opening/deadline dates or budget amount; neither source reports current remaining funds or a pause.
Eligible project scopeExact Katowice route 95445 / OZ1.3; current route page plus 2027 priority-list row.
OZ1.3 is described as covering the costs of managing waste from accidents under a statutory obligation; the current route description narrows the waste to that generated during rescue or firefighting operations. The exact statutory payer/obligated party, waste categories, and eligible handling line items are not specified on this page.
Other conditionExact route’s linked settlement page and 2026 waste-management settlement form; reporting requirements apply after contract as instructed by the form.
The current generic waste-management settlement form asks the beneficiary to report costs by funding source, align completed physical scope to the contractual financial schedule, list invoices and payment dates, and map each invoice to schedule line items and the Fund-financed amount. It is a reporting form, not an OZ1.3-specific pre-award eligible-cost schedule.
Other conditionConditional General Rules Table 6 §6.3.6 for exact Katowice OZ1.3 if no special disbursement terms displace it.
Under the General Rules, funding can be advanced up to 90% of its value under the stated conditions, with the remainder paid against invoices after prior advances are settled; this concerns disbursement mechanics, not the grant-intensity or award ceiling for OZ1.3. The exact route application does not state whether advance payments are used.
Other conditionExact Katowice OZ1.3 route application tab; archive scope and version applicability unresolved.
The route links an application ZIP labelled “inne zadania z zakresu gospodarki odpadami”. The archive is retained and contains multiple vintages, including 2025 and a nested 2026 C2 financial form; the page and archive do not identify which template is required for an OZ1.3 local-government applicant. Do not infer the C2 form applies.
Other conditionExact Katowice route 95445 page.
The route page states grant financing only. It publishes no OZ1.3-specific award amount, grant-intensity rate, or line-item eligible-cost list.
Other conditionExact Katowice OZ1.3; mapping boundary between this statutory accident-waste route and the enumerated general grant classes.
The General Rules’ Table 2 grant rates are expressly tied to listed categories under §§2.2.1 and 2.2.2. OZ1.3 is not named in those lists; it would be unsupported to apply the 80% or 50% rate to this route without a current route-specific or other applicable rule.
Other conditionExact Katowice OZ1.3, subject to project-specific legal and technical requirements.
The currently linked selection criteria require legal compliance and consistency with the applicable priority list. They describe environmental effect and separately economic and social assessment; tasks should be prepared with necessary permits/decisions and financing arrangements, including documented own funding. These are published selection criteria rather than a complete application checklist.
Other conditionExact Katowice OZ1.3 route page and linked signage rules.
The exact route page says an information board is required for tasks where construction works last more than six months and a memorial board within 30 days after completion. The linked 2025 signage rules specify the memorial-board 30-day period from the completion date stated in the agreement; preserve this more precise trigger. The route does not specify a construction duration for any applicant’s task.
Amounts and costs2
Eligible costConditional general eligible-cost definition for exact Katowice OZ1.3; route-specific eligible-cost catalogue unresolved.
The General Rules define eligible costs as necessary cost-schedule line items for the ecological effect, as specified by the application-schedule instructions, excluding investment work performed with the beneficiary’s own forces. For public co-financed tasks the definition includes costs eligible under those other public funding sources. The OZ1.3 cost schedule/instructions and eligible waste-management line items were not available in the sources reviewed.
Funding intensity, maximumConditional general rule for exact Katowice OZ1.3, only to the extent no applicable special terms displace it; current general rules effective for decisions from 1 May 2026.
100 percent of eligible task costs (combined Fund and other public funding)

General-rule aggregate ceiling; applies subject to any special OZ1.3 terms under General Rules §§14–15. Not a route-specific grant rate or amount; bridge-loan exception is in the source but route lists grant only.

Source documents7
Call facts
Opens
—
Provider
WFOŚiGW Katowice
Checked
24 Oct 2026
Review status
Partial review
Independent QA
No published hold
Reviewed
23 Oct 2026

This is a summary of the source page, not the official text. Eligibility, conditions and the submission system are at the source.