scindu funding
All calls

Zakup sprzętu specjalistycznego – maszyn i pojazdów komunalnych służących realizacji zadań z zakresu gospodarki odpadami

WFOŚiGW Katowice · National call

OZ 1.6.

Summary

Not an R&D call a Polish company can use, by Scindu's rule.

Funds specialist machinery and municipal vehicles for waste management tasks; eligible applicants are unspecified.

Who can apply
Unclear from the source.
Amount
Budget not stated
Deadline
No deadline
Status
Open
Open the official pageRegister to keep this call

Machine-classified from the call text; check eligibility at the source.

Description

The description is on the provider's page.

Who can apply, in detail
Purpose
Energy, environment, infrastructure
R&D relevance
0 of 3
Poland eligible
Yes
Country limit
Poland, Śląskie voivodeship
Region
śląskie
Consortium
Unclear
Readiness level (TRL)
—
Topics
  • Waste management
  • Specialist machinery
  • Municipal vehicles

Machine-classified from the call text; check eligibility at the source. 23 Oct 2026

Conditions29

Typed facts extracted from the source documents by Scindu's grant-data review. Each value keeps its own conditions. Unknown means unstated, not zero or unlimited.

Applicant restrictionGeneral Fund underwriting condition, route-wide loan application.
The Fund conditions the loan and its amount on creditworthiness under banking law and appropriate legal security for repayment; the exact security form is not named on the route page.
Applicant restrictionGeneral Fund contract screen; not a complete route applicant checklist.
The Fund will not contract with entities that do not meet statutory fee/penalty obligations or have due liabilities to the Fund where collection steps have been taken.
Applicant typeExact route prose plus separate product taxonomy; no applicant-status proof checklist is stated in the route itself.
Route prose names local-government units (JST) and entrepreneurs. Its taxonomy separately includes SME (including an individual conducting business), entrepreneur, and JST; do not treat tags as independently overriding the route prose.
Application restrictionGeneral Rules condition for exact route unless an applicable special programme term says otherwise; no such exception is identified on OZ1.6 page.
For the year-round directions in §5.2.2, the Fund does not fund tasks completed before the application submission date.
Application restrictionExact OZ1.6 / 95448 at the cited capture times; no budget balance inferred.
The exact route says continuous intake, and the current local catalogue row was marked open in its 23 October 2026 capture. Neither source establishes remaining budget, continued availability after capture, or an application-specific deadline.
Eligible project scopeExact Katowice OZ1.6 / 95448 only; machine/vehicle eligibility beyond this description is unresolved.
The route covers purchasing specialist machines and communal vehicles used to perform waste-management tasks. The source does not publish a route-specific equipment list, technical specification, eligible model or unit-price catalogue.
Eligible project scopeExact 2027 priority category for OZ1.6 only; no amount established.
The 2027 priority list classifies OZ1.6 as purchase of specialist equipment—machines and communal vehicles—for waste-management tasks. This row supplies no project cap or remaining allocation.
Other conditionNo specific public-aid route or applicant regime is inferred; actual applicable aid basis remains unknown.
The exact route links a public-aid documentation archive, but the archive contains multiple aid-regime forms/rules (including de minimis and other-aid materials). No single aid regime is selected by the route page, so the applicable aid ceiling or eligibility cannot be determined from the archive inventory alone.
Other conditionExact current route-linked archived form package; form vintages vary. Confirm the correct version/attachments for an actual filing.
The linked “other waste tasks” archive includes the general A application, B1 project-effect section, a C1 financial checklist for JST, and a nested C2 package for entrepreneurs/other organizations. Its ZIP member is named 13_wniosek_C2_2026.zip, while the C2 Word form itself is marked 2025.03; treat the package label and form version as separate. The precise form branch depends on applicant and financing arrangement; the forms are application/document checklists, not a route equipment cost list.
Other conditionLinked form documents are versioned application materials; exact current checklist may depend on applicant and Fund request.
The 2025 C1/C2 forms describe applicant-specific financial and contracting documents rather than project-staffing facts. C1 lists local-government approvals, financial outlook/opinions, borrowing resolution or post-approval undertaking, and loan drawdown/repayment/security proposal. C2 lists financial statements and a loan/security proposal for entrepreneurs and other organizations. These are form checklists in the linked ZIP; current route page does not identify an applicant’s final requirement set.
Other conditionGeneral Rules 49/2026 Table 6; conditional general terms, subject to more specific route rules.
A beneficiary must mark the project under the Fund’s project-marking rules available on its website.

Conditional on becoming a Fund beneficiary; details are in the separate referenced guidance.

Other conditionConditional general-rule branch under §§1.2.2 and 1.5.2; route-level combination remains unknown.
Conditional general-rule limits: if a Fund loan and Fund grant are combined for one task, their combined support cannot exceed 100% of eligible costs. A non-remissible Fund loan cannot be combined with a Fund grant for that same task. The exact OZ1.6 route lists an ordinary loan only and does not establish any Fund grant combination.

Applies only if the actual financing arrangement combines a Fund grant with a Fund loan; the no-combination rule applies to the non-remissible-loan subtype. This is not a route-specific grant offer.

Other conditionConditional general rules only if the eventual route loan is remissible; route page does not establish loan subtype or remission entitlement.
The route links the general remission information page but does not identify whether the OZ1.6 loan is remissible. Under current General Rules, partial remission is conditional on no reimbursement from public funds (including EU), timely task completion/settlement and effects, durability expiry, at least 50% of used principal repaid on time (early repayment alone does not qualify), and statutory obligations to the Fund being current.
Other conditionGeneral Rules 49/2026 Table 3 §§3.3.1–3.3.4; conditionally relevant to exact OZ1.6 waste-equipment route; route subtype remains unknown.
Only if a Fund loan is remissible and a partial-remission request is considered under General Rules 49/2026: the Fund Management Board decides remission up to an amount equivalent to 0.5% of the Fund’s prior-year revenues; the Supervisory Board decides above that threshold. The approved remission cannot exceed the borrower’s actual obligations under the relevant loan contract on the request date. The rules applied are those in force on the request date; the Fund enters a partial-remission agreement with the applicant, and controls the task financed from remission proceeds. This describes conditional general procedure only: the exact route does not establish remissible-loan subtype or entitlement.

Conditional on the route financing including a remissible Fund loan and a remission request; no route-specific remission entitlement is inferred.

Other conditionGeneral Rules 49/2026 Table 3 §§3.2.2, 3.2.3(a)-(d), 3.4.
If a route loan is remissible and all joint §3.1 conditions are met, remission is reduced by any Fund grant used on the same task; it is reduced by 15% for the specified amended reductions in wastewater connections or asbestos mass/municipal low-emission programmes, by 30% for other amendments reducing planned ecological effect, and by 5% per qualifying document or principal-installment delay exceeding 30 days. Loans for tasks resulting from an administrative order to remove pollution consequences are not eligible for remission. These are conditional general rules and do not establish the OZ1.6 loan subtype or a route entitlement.

Conditional on an eventual remissible loan and the facts listed in each subclause; 15%/30% reductions apply only to identified amendments, 5% reductions only to specified delays, and §3.4 excludes the stated administrative-order cases.

Other conditionGeneral Rules 49/2026 Table 3 §3.3.5; exact route does not specify remissible status.
Submitting a partial-remission request does not suspend current payments. Under the remission agreement, amounts paid under the loan after the remission request are refunded, without interest on the refunded sums.

Only if the loan subtype is remissible and a remission request and agreement occur. This does not establish that the route loan is remissible or that remission will be granted.

Other conditionGeneral Rules 49/2026 Table 6; conditional general terms, subject to more specific route rules.
A Fund-financing agreement is generally concluded after applicant selection of contractors or suppliers; earlier conclusion is possible when justified by the project’s nature.

Conditional general contract-process rule; the exact route does not establish procurement timing or a project-specific exception.

Other conditionGeneral current settlement rule; any later special rule/contract may provide otherwise.
Fund support settlement counts expenditures incurred after the date the application was submitted, documented by invoices and related payment confirmations; both invoice date and payment date must satisfy this rule.
Other conditionExact page, v21 local row, and 2027 category list; no numeric pool/cap asserted.
The route page and 2027 priority row do not state the OZ1.6 programme allocation, remaining balance or per-project award cap; those amounts remain unknown.
Other conditionGeneral Fund obligation for the resulting investment; exact contract/effect obligations may add requirements.
The beneficiary must maintain durability of the investment project created through the funded task for at least five years from its completion.
Other conditionGeneral Rules 49/2026 Table 6; conditional general terms, subject to more specific route rules.
Foreign-currency invoices are settled using the NBP average exchange rate announced for the business day before the invoice date.

Applies only if the project has qualifying foreign-currency invoices.

Other conditionGeneral current disclosure obligation; not an assertion that other funding is permitted by any specific aid regime.
At every stage of task implementation, the beneficiary must inform the Fund of the amount of financing obtained from other sources.
Other conditionGeneral payment rule, subject to the specific funding agreement.
General rules permit advance payments according to the physical-financial schedule up to 90% of its value; for tasks financed through the state-budget targeted reserve, advances may reach 100%. The remaining amount is paid against invoices after previously paid advances are settled. This is a disbursement mechanism, not a total financing rate.

Conditional general disbursement rule; the route does not establish targeted-reserve financing, an awarded schedule, or actual advance amount.

Other conditionGeneral Rules 49/2026 Table 6; conditional general terms, subject to more specific route rules.
Planned installments are paid no more often than once per calendar quarter.

Conditional on Fund support being disbursed in installments.

Other conditionGeneral Rules 49/2026 Table 6; conditional general terms, subject to more specific route rules.
Installments, including advances, are conditional on Fund acceptance of a settlement reflecting current project progress and planned disbursements; subsequent advance installments also require accepted settlement of invoices for the prior advance.

Conditional general disbursement conditions; actual award and schedule are unknown.

Other conditionGeneral Rules 49/2026 Table 1 §§1.3.1, 1.3.5 and 1.3.7; exact route does not state resulting contract rate.
Under the general ordinary-loan rule, interest is preferential and variable by the bill rediscount rate; the applicable coefficient is applied to the rate in force on the first day of the contract month, and the rate is adjusted each subsequent month using the rediscount or base rate in force on that month’s first day. Public-aid loans may use the distinct §1.3.6 base-rate-plus-margin method, already stated separately in this packet. The exact contract rate remains unknown.

Conditional common-rule treatment where this exact route loan is governed by Table 1 and no more specific route terms displace it. Existing floors are minima, not actual rates. Public-aid terms remain conditional and route applicability is unknown.

Other conditionConditional when public-aid rules apply; the route links multiple aid-regime materials but does not select the applicant’s applicable basis.
For tasks governed by public-aid rules, the Fund may set a different annual interest calculation using the base rate at contract date plus the margin under the applicable European Commission communication, but not below the corresponding §1.3.2, §1.3.3 or §1.3.4 floor. The specific aid regime and resulting rate for an OZ1.6 applicant are unknown.
Other conditionExact OZ1.6 page only; general loan conditions below remain conditional and contract dependent.
The route description lists loan as its financing intensity. It does not list a grant, bridge loan, or route-specific subsidy percentage.
Other conditionNo route-level personnel evidence was found; an application contact field is not a staffing/pay eligibility rule.
The exact route is for equipment purchases; neither its page nor the linked financial forms establish a fundable personnel category, job title, staff count, salary or pay rate. These remain unknown and are not inferred from equipment operation or application-form contacts.
Amounts and costs14
Eligible costGeneral definition only. Route scope says machine/communal vehicle purchase; no equipment type, model, price or cost line eligibility is asserted beyond route text and general schedule rule.
General eligible costs are schedule line items necessary to achieve the ecological effect, as defined by the schedule instructions; investment work performed using the beneficiary’s own forces is excluded. For publicly cofinanced tasks, the applicable public-source cost rules extend the definition. No OZ1.6 machine-by-machine eligible-cost catalogue or unit cap is published on the route page.
Funding intensity, maximumGeneral aggregate cap for combined Fund and other public support, if the applicant uses other public support; no bridge-loan product is listed for this route.
100 percent of eligible project costs combined from Fund and other public sources

General Rules §4; bridge loans excepted. Exact OZ1.6 page lists ordinary loan only.

Grace period, maximumConditional ordinary loan term for the exact route; actual contract schedule remains unknown.
18 months maximum after contractually stated project completion

Repayment starts not earlier than 6 months after contractual completion; bridge-loan exception does not apply to this loan-only route.

Loan interest, minimumConditional current general loan rule; exact route page does not specify remissible subtype.
1.5 percent per annum minimum for non-remissible loans

Only if the route contract is non-remissible; rate in the actual agreement remains unknown.

Loan interest, minimumConditional special rate subbranch; route applicant and loan type must meet the clause.
2 percent per annum minimum

Only a qualifying municipality/county and remissible loan; subsidy entitlement year is the year the loan application is filed.

Loan interest, minimumConditional current general loan rule; exact route page does not specify remissible subtype.
3 percent per annum minimum for remissible loans

If remissible; §1.3.4 contains a separate qualifying municipal/county rate floor.

Loan partial remission, maximum amountConditional alternative A amount ceiling, only if route loan is remissible and §3.1 joint prerequisites are met.
PLN 200,000

10% of principal used, capped at PLN 200,000; no earmark to a new task.

Loan partial remission, maximum amountConditional alternative B amount ceiling only if route loan is remissible and §3.1 joint prerequisites are met.
PLN 4,000,000

35% of principal used; remission proceeds must fund a qualifying new environmental task.

Loan partial remission, maximum shareConditional alternative A only if loan is remissible and §3.1 joint prerequisites are met.
10 percent of principal used

Alternative A; capped at PLN 200,000 and has no new-task earmark.

Loan partial remission, maximum shareConditional alternative B only if loan is remissible and §3.1 joint prerequisites are met.
35 percent of principal used

Alternative B; requires remission proceeds for a new environmental task aligned with Environmental Protection Law objectives, with separate PLN 4m cap.

Loan principal, maximum shareGeneral Rules version in force on the decision; applies conditionally to the OZ1.6 loan. No project cap or call allocation is stated.
100 percent of eligible project costs

Table 1 §1.2.1; subject to ecological effects and Fund capacity; no promise of total project funding.

Loan principal, maximum shareConditional General Rules 49/2026 Table 1 §1.2.3(a); no bridge-loan branch is asserted for this exact ordinary-loan route.
100 percent of beneficiary own contribution for a publicly cofinanced task

Only for tasks cofinanced from public sources; up to 100% of beneficiary own contribution, not 100% of all project costs. The exact OZ1.6 route does not establish public cofinancing or an own-contribution amount.

Loan term, maximumConditional general ordinary-loan term for exact loan-only route.
240 months maximum from contractually stated project-completion date, including grace

Ordinary loan; §1.4.2 bridge exception is not route-listed. Half-principal repayment schedule condition also applies.

Loan term, minimumConditional general-rule ordinary-loan minimum for exact OZ1.6.
48 months minimum from contractually stated project-completion date, including grace

Ordinary loan lower bound; actual schedule set by agreement. The §1.4 limits exclude bridge loans, which are not listed for this route.

Source documents9
Call facts
Opens
—
Provider
WFOŚiGW Katowice
Checked
24 Oct 2026
Review status
Partial review
Independent QA
No published hold
Reviewed
23 Oct 2026

This is a summary of the source page, not the official text. Eligibility, conditions and the submission system are at the source.