Wdrażanie obszarowych programów ograniczenia emisji pyłowo-gazowych
WFOŚiGW Katowice · National call
Summary
Not an R&D call a Polish company can use, by Scindu's rule.
Funds implementation of area-wide programmes reducing particulate and gaseous emissions; eligible applicants are unspecified.
- Who can apply
- Unclear from the source.
- Amount
- Budget not stated
- Deadline
- No deadline
- Status
- Open
Machine-classified from the call text; check eligibility at the source.
Description
The description is on the provider's page.
Who can apply, in detail
- Purpose
- Energy, environment, infrastructure
- R&D relevance
- 0 of 3
- Poland eligible
- Yes
- Country limit
- Poland, Śląskie voivodeship
- Region
- śląskie
- Consortium
- Unclear
- Readiness level (TRL)
- —
- Topics
- Area-wide emission reduction
- Air quality
- Particulate and gaseous emissions
Machine-classified from the call text; check eligibility at the source. 23 Oct 2026
Conditions
Typed facts extracted from the source documents by Scindu's grant-data review. Each value keeps its own conditions. Unknown means unstated, not zero or unlimited.
- Applicant restrictionCurrent WFOŚiGW Katowice General Rules 49/2026; conditional for exact OA1.4 loan unless displaced by a more specific binding route term or agreement.
- The Fund conditions the loan and its amount on creditworthiness under banking law and appropriate legal security for repayment; the exact security form is not named on the route page.
- Applicant restrictionExact regulation §3.1 and exact B2 form; applicant/property linkage unresolved for household-owned buildings.
- The linked OA regulation requires documented legal title to the property covered by the application. The route is JST-led with dwelling-level POE measures, while the supplied B2 form asks for the applicant’s legal title before and after the task; the exact source set does not resolve how this applies where the underlying building is resident-owned. Preserve this scope question rather than assuming municipal title or waiving the condition.
- Applicant restrictionCurrent WFOŚiGW Katowice General Rules 49/2026; conditional for exact OA1.4 loan unless displaced by a more specific binding route term or agreement.
- The Fund will not contract with entities that do not meet statutory fee/penalty obligations or have due liabilities to the Fund where collection steps have been taken.
- Applicant typeExact page and linked regulation; qualified, not generalized to all JST.
- The route page names local-government units (JST) as applicants. The route-linked OA regulation says it does not apply to state budget units (PJB), so this exclusion qualifies the route wording if the proposed applicant is a PJB.
- Application restrictionExact linked application form; applies to the same-task invoices / amounts described in the form.
- B2 asks the JST applicant to disclose own, Fund and other financing and its stage (agreement, promise or application). It also states that the borrower/grant recipient/funded entity must return the part of Fund support where other public funds have or had paid the same task invoices used as the basis for Fund disbursement. The clause does not itself establish that this OA1.4 route awards a grant.
- Application restrictionCurrent WFOŚiGW Katowice General Rules 49/2026; conditional for exact OA1.4 loan unless displaced by a more specific binding route term or agreement.
- For year-round directions in General Rules §5.2.2, tasks completed before application submission are not funded; this is a general rule, conditional on no more specific applicable exception.
- Application restrictionConditional General Rules scope for exact route OA1.4 / 95466.
- Where the special terms do not displace the General Rules workflow, forms are made available in the Fund’s teleinformation system and applications are registered there. Deadlines for competition/intake rounds are set by their regulations or announcements; other directions not assigned a deadline are accepted year-round. An application is formally complete only when correctly filled and containing required information and documents. The Fund notifies the applicant within 30 days of receipt about completeness or missing items, extendable to 180 days when justified by application volume. The applicant must correct within 30 days of receiving notice (extensions to 60 days may be granted on a justified request); without timely correction, the application receives no further assessment. The Fund may request supplements at any assessment stage. A financing decision/promissory decision is for a fully prepared project with documents appropriate to its specifics; the Fund sends written notice of decision, loss of force, or refusal. If the agreement is not signed within four months of the decision (or another period stated in it), the decision expires; a timely extension request may lead the Fund Management Board to set a new deadline, and absent such request the decision expires. The exact route separately states its continuous intake and paper/e-Doręczenia handling; those route-specific directions are preserved.
The general process applies only where more specific terms do not displace it; OA1.4 separately states continuous intake and its paper/e-Doręczenia instructions.
- Application restrictionExact route page plus read-only local snapshot only.
- The exact route page states continuous intake. The current local v25 row is marked open and has no deadline; current live availability beyond these source captures is unverified.
- Application restrictionExact route-linked 2024 OA regulation §§6.1, 7.1–7.2.
- The linked OA regulation requires complete applications on current forms; formal and substantive review occur simultaneously. The Fund’s competent authority decides after positive assessment and notifies the applicant.
- Application restrictionExact C1 template plus separate current General Rules condition.
- C1 says the funding agreement is concluded after the JST applicant has selected contractors or suppliers. This is a route-linked form instruction, not proof of retroactive funding for pre-application tasks; the current General Rules govern such timing.
- Application restrictionExact linked C1 form, JST loan section only.
- The exact 2026 C1 package section for JST loan applications lists election/authority documents, a long-term financial forecast, positive Regional Accounting Chamber opinions on debt/deficit and repayment, a council borrowing resolution or undertaking to provide it after a positive decision, and proposed loan drawdown, repayment and security. The Fund may request additional information at any stage. These are documentary conditions/prompts; no applicant-specific debt ceiling is stated in this form.
- Application restrictionThe form asks for a council-adopted programme; it does not make residents direct Fund applicants.
- The linked application package requires the municipality’s whole-programme card and an authenticated copy of the council resolution adopting the POE for implementation. The card captures POE title and implementation period, municipal property counts and programme coverage.
- Eligible project scopeExact route description and applicant line.
- The exact OA1.4 route covers implementation of local-government programmes to reduce dust/gas emissions by modernizing individual heat sources. It is a municipality-led programme application, not an individual household’s direct application to this route.
- Eligible project scopeForm template scope only; current-year category/technical eligibility must be established separately.
- The POE card includes planning lines for removing/replacing individual heat sources, solar, photovoltaic and heat installations, building insulation and related property counts. These are whole-programme form fields; each measure is not thereby guaranteed to be eligible in the current route or current programme without applicable technical criteria and the adopted POE.
- Other conditionExact linked 2026 POE questionnaire; blank fields do not establish eligible expenses or hiring.
- The route-linked forms request the number of heat-source upgrades by variant, typical-building heated volume/area, heating and hot-water system parameters before and after, annual energy and fuel use/cost, annual service/operating cost, total investment, annual operating-cost saving and simple payback. These are technical/economic data fields, not proof of reimbursable cost categories or payroll eligibility.
- Other conditionExact linked archive inventory and retained form text; version differences are preserved.
- The current page-linked archive has a May 2026 HTTP Last-Modified date and includes 2026 application/schedule filenames, but the instruction and B2 files are marked 2025 and the C1 text identifies its version as 2025.03. The archive date does not establish that every included template is the latest operative version.
- Other conditionCurrent WFOŚiGW Katowice General Rules 49/2026; conditional for exact OA1.4 loan unless displaced by a more specific binding route term or agreement.
- A beneficiary must mark the project under the Fund’s project-marking rules available on its website.
Conditional on becoming a Fund beneficiary; details are in the separate referenced guidance.
- Other conditionCurrent WFOŚiGW Katowice General Rules 49/2026; only if the selected exact OA1.4 loan is remissible and no more specific binding route term or agreement displaces the rule.
- Only if the eventual OA1.4 loan product is remissible: General Rules 49/2026 require the cited no-public-reimbursement, timely completion/effect, durability-expiry, minimum timely repayment and current-Fund-obligations conditions. The exact route page does not identify remissible versus non-remissible loan subtype, so remission paths are conditional and not promised.
- Other conditionCurrent WFOŚiGW Katowice General Rules 49/2026; conditional for exact OA1.4 loan unless displaced by a more specific binding route term or agreement.
- Only if this route’s eventual loan is remissible and all joint §3.1 conditions are met: remission is reduced by any Fund grant used on the same task; by 15% for amendments in the specific §3.2.3(a) cases (sewer connections, asbestos-removal mass, or municipal low-emission programmes); by 30% for other amendments reducing planned ecological effect; and by 5% per qualifying document or principal-installment delay exceeding 30 days. The §2.3(a) examples are not treated as OA1.4 conditions. Loans for tasks resulting from an administrative order to remove pollution consequences are not eligible for remission. These are conditional general rules, not evidence of this route’s loan subtype or remission entitlement.
Conditional on eventual remissible subtype, all joint §3.1 prerequisites and the precise facts in each cited subclause. §3.2.3(a) examples are not treated as route terms; the 30%/5% reductions and §3.4 exclusion apply only within their cited scopes.
- Other conditionCurrent WFOŚiGW Katowice General Rules 49/2026; conditional for exact OA1.4 loan unless displaced by a more specific binding route term or agreement.
- Submitting a partial-remission request does not suspend current payments. Under the remission agreement, amounts paid under the loan after the remission request are refunded, without interest on the refunded sums.
Only if the loan subtype is remissible and a remission request and agreement occur. This does not establish that the route loan is remissible or that remission will be granted.
- Other conditionConditional common remission procedure, General Rules Table 3 §§3.3.1–3.3.4; exact OA1.4 route page does not identify loan subtype.
- Only if the eventual OA1.4 loan is remissible and a remission request is made: General Rules 49/2026 place decisions up to 0.5% of the Fund’s prior-year revenue with the Management Board and larger decisions with the Supervisory Board; the approved amount cannot exceed the borrower’s actual obligations under the loan contract on the request date. The rules in force on request date govern the decision; the Fund contracts with the applicant for the partial remission and controls the new task funded from remission proceeds. This is conditional procedure, not evidence that OA1.4 loan is remissible or remission will be approved.
- Other conditionCurrent WFOŚiGW Katowice General Rules 49/2026; conditional for exact OA1.4 loan unless displaced by a more specific binding route term or agreement.
- A Fund-financing agreement is generally concluded after applicant selection of contractors or suppliers; earlier conclusion is possible when justified by the project’s nature.
Conditional general contract-process rule; the exact route does not establish procurement timing or a project-specific exception.
- Other conditionCurrent WFOŚiGW Katowice General Rules 49/2026; conditional for exact OA1.4 loan unless displaced by a more specific binding route term or agreement.
- Fund support settlement counts expenditures incurred after the date the application was submitted, documented by invoices and related payment confirmations; both invoice date and payment date must satisfy this rule.
- Other conditionExact route/regulation/current-list source set; no automatic code equivalence assumed.
- The route page and linked 2024 regulation use OA1.4. The 2027 priority list has a current TE1.4 heading/title; it is retained as current priority-list classification, with the code vintage difference visible. The regulation requires projects to match the priority list applicable in the given year.
- Other conditionCurrent WFOŚiGW Katowice General Rules 49/2026; conditional for exact OA1.4 loan unless displaced by a more specific binding route term or agreement.
- The beneficiary must maintain durability of the investment project created through the funded task for at least five years from its completion.
- Other conditionCurrent WFOŚiGW Katowice General Rules 49/2026; conditional for exact OA1.4 loan unless displaced by a more specific binding route term or agreement.
- Foreign-currency invoices are settled using the NBP average exchange rate announced for the business day before the invoice date.
Applies only if the project has qualifying foreign-currency invoices.
- Other conditionSource wording conflict preserved by scope; route-specific product listing controls this packet.
- The route page lists only a Fund loan. The linked 2024 OA regulation generically says its call can provide loans or grants, and the linked general Form A contains a global grant/transfer checkbox; neither is treated as an OA1.4 route-specific Fund grant because the route page selects loan only.
- Other conditionCurrent WFOŚiGW Katowice General Rules 49/2026; conditional for exact OA1.4 loan unless displaced by a more specific binding route term or agreement.
- At every stage of task implementation, the beneficiary must inform the Fund of the amount of financing obtained from other sources.
- Other conditionCurrent WFOŚiGW Katowice General Rules 49/2026; conditional for exact OA1.4 loan unless displaced by a more specific binding route term or agreement.
- General rules permit advance payments according to the physical-financial schedule up to 90% of its value; for tasks financed through the state-budget targeted reserve, advances may reach 100%. The remaining amount is paid against invoices after previously paid advances are settled. This is a disbursement mechanism, not a total financing rate.
Conditional general disbursement rule; the route does not establish targeted-reserve financing, an awarded schedule, or actual advance amount.
- Other conditionCurrent WFOŚiGW Katowice General Rules 49/2026; conditional for exact OA1.4 loan unless displaced by a more specific binding route term or agreement.
- Planned installments are paid no more often than once per calendar quarter.
Conditional on Fund support being disbursed in installments.
- Other conditionCurrent WFOŚiGW Katowice General Rules 49/2026; conditional for exact OA1.4 loan unless displaced by a more specific binding route term or agreement.
- Installments, including advances, are conditional on Fund acceptance of a settlement reflecting current project progress and planned disbursements; subsequent advance installments also require accepted settlement of invoices for the prior advance.
Conditional general disbursement conditions; actual award and schedule are unknown.
- Other conditionRoute-specific link and exact PDF retained; generic obligations remain governed by document scope.
- The route links official Fund project-marking guidance for funded tasks; this packet does not generalize any unspecified marking format or timing beyond claims in that linked source.
- Other conditionExact POE card field; local programme-specific pass-through mechanics remain unknown unless the adopted POE specifies them.
- The POE card asks the JST to state whether Fund resources will be transferred to building users as a subsidy or loan and how much the users would repay under a loan. This shows a possible downstream municipality-to-resident financing mechanism; the form does not set the actual household amount, eligibility, grant rate or entitlement. Keep it distinct from the route’s Fund loan to the JST.
- Other conditionBounded to the reviewed exact route and linked forms; staffing remains empty.
- The reviewed route page, linked regulation and 2026 forms do not state salary reimbursement, payroll eligibility, funded job titles or a project headcount. The POE card has signature lines for the operator, treasurer and mayor/president, and the economic questionnaire asks annual service/operating costs; neither is a funded staff role or payroll promise.
- Other conditionCurrent WFOŚiGW Katowice General Rules 49/2026; conditional for exact OA1.4 loan unless displaced by a more specific binding route term or agreement.
- Under the general ordinary-loan rule, interest is preferential and variable by the bill rediscount rate; the applicable coefficient is applied to the rate in force on the first day of the contract month, and the rate is adjusted each subsequent month using the rediscount or base rate in force on that month’s first day. Public-aid loans may use the distinct §1.3.6 base-rate-plus-margin method, already stated separately in this packet. The exact contract rate remains unknown.
Conditional common-rule treatment where this exact route loan is governed by Table 1 and no more specific route terms displace it. Existing floors are minima, not actual rates. Public-aid terms remain conditional and route applicability is unknown.
- Other conditionExact linked application and completion forms; measurement/reporting scope only.
- B2 requests the expected ecological and material effects, how the outcomes will be evidenced, expected completion dates, and information about preparatory documentation; Form 06 establishes programme baselines and planned totals. A separate completion protocol template lists household-specific installation/removal/acceptance evidence, but it is a template and does not prescribe an award amount.
- Other conditionExact linked archive; no aid classification inferred from presence of generic documents.
- The route links a 2026 public-aid attachment archive. The exact route page lists a Fund loan to JST; the archive contains distinct public-aid templates but does not show, without case-specific facts, that aid is being granted to the municipality or to each resident/household. The applicable aid regime remains unresolved.
- Other conditionCurrent WFOŚiGW Katowice General Rules 49/2026; conditional for exact OA1.4 loan unless displaced by a more specific binding route term or agreement.
- For tasks governed by public-aid rules, the Fund may set a different annual interest calculation using the base rate at contract date plus the margin under the applicable European Commission communication, but not below the corresponding §1.3.2, §1.3.3 or §1.3.4 floor. The specific aid regime and resulting rate for an OA1.4 applicant are unknown.
- Other conditionExact page and blank forms only; do not turn form fields into budgets, household caps or remaining balances.
- The route page gives a 100%-of-eligible-cost loan ceiling but no annual route allocation, remaining balance or absolute JST loan cap. The POE card asks the applicant to fill programme-wide cost and financing amounts and possible household subsidy/loan terms; it sets no values itself.
- Other conditionExact programme-card finance table; amounts are left blank for the applicant.
- The POE card requests a programme-wide implementation cost and planned amounts from the municipality, building users, WFOŚiGW and other sources. These are the local programme’s financing plan inputs, not the Fund’s remaining route allocation or a project/household award cap.
Amounts and costs
- Eligible costCurrent WFOŚiGW Katowice General Rules 49/2026; conditional for exact OA1.4 unless displaced by a more specific binding route term or agreement.
- General eligible costs are the physical-financial schedule items necessary to achieve the ecological effect and allowed by the schedule instructions. For publicly co-financed tasks, eligible costs also follow the rules of those public funding sources. No exact OA1.4 asbestos-specific cost line list or unit cap is established by the reviewed exact route page.
- Funding intensity, maximumCurrent WFOŚiGW Katowice General Rules 49/2026 §4; conditionally applicable to exact OA 1.4. / 95466 if both Fund support and other public support finance the task and no more specific binding term displaces it. The ceiling applies regardless of Fund support form; bridge loans are excepted.
- 100 percent of eligible project costs combined from Fund and other public sources
For any task receiving WFOŚiGW Fund support together with support from other public sources, the aggregate Fund and other-public-source financing may not exceed 100% of eligible task costs, except for bridge loans. This does not establish a route-specific product entitlement, replace any separate route ceiling, or mean that a remaining call balance or project award equals 100%.
- Funding intensity, maximumGeneral Rules 49/2026 Table 1 §1.2.1, ordinary Fund loan; conditional for OA1.4 route.
- 100 percent of eligible task costs
Conditional general rule for an ordinary Fund loan only; the exact route page does not identify loan subtype and links a separate current-year regulation.
- Funding intensity, maximumThe exact route page lists a loan up to 100% of eligible costs. This is support to the JST applicant for the route task, not a per-household grant rate or an absolute PLN cap.
- 100 percent of eligible costs
Exact route page lists loan only. Do not substitute the possible municipality-to-resident subsidy/loan in the underlying POE for Fund support to the JST.
- Grace period, maximumCurrent WFOŚiGW Katowice General Rules 49/2026; conditional for exact OA1.4 loan unless displaced by a more specific binding route term or agreement.
- 18 months maximum after contractually stated project completion
Repayment starts not earlier than 6 months after contractual completion; bridge-loan exception does not apply to this route loan branch.
- Loan interest, minimumCurrent WFOŚiGW Katowice General Rules 49/2026; conditional for exact OA1.4 loan unless displaced by a more specific binding route term or agreement.
- 1.5 percent per annum minimum for non-remissible loans
Only if the route contract is non-remissible; rate in the actual agreement remains unknown.
- Loan interest, minimumCurrent WFOŚiGW Katowice General Rules 49/2026; conditional for exact OA1.4 loan unless displaced by a more specific binding route term or agreement.
- 2 percent per annum minimum
Only a qualifying municipality/county and remissible loan; subsidy entitlement year is the year the loan application is filed.
- Loan interest, minimumCurrent WFOŚiGW Katowice General Rules 49/2026; conditional for exact OA1.4 loan unless displaced by a more specific binding route term or agreement.
- 3 percent per annum minimum for remissible loans
If remissible; §1.3.4 contains a separate qualifying municipal/county rate floor.
- Loan partial remission, maximum amountCurrent WFOŚiGW Katowice General Rules 49/2026; conditional for exact OA1.4 loan unless displaced by a more specific binding route term or agreement.
- PLN 200,000
10% of principal used, capped at PLN 200,000; no earmark to a new task.
- Loan partial remission, maximum amountCurrent WFOŚiGW Katowice General Rules 49/2026; conditional for exact OA1.4 loan unless displaced by a more specific binding route term or agreement.
- PLN 4,000,000
35% of principal used; remission proceeds must fund a qualifying new environmental task.
- Loan partial remission, maximum shareCurrent WFOŚiGW Katowice General Rules 49/2026; conditional for exact OA1.4 loan unless displaced by a more specific binding route term or agreement.
- 10 percent of principal used
Alternative A; capped at PLN 200,000 and has no new-task earmark.
- Loan partial remission, maximum shareCurrent WFOŚiGW Katowice General Rules 49/2026; conditional for exact OA1.4 loan unless displaced by a more specific binding route term or agreement.
- 35 percent of principal used
Alternative B; requires remission proceeds for a new environmental task aligned with Environmental Protection Law objectives, with separate PLN 4m cap.
- Loan principal, maximum shareCurrent WFOŚiGW Katowice General Rules 49/2026; conditional for exact OA1.4 loan unless displaced by a more specific binding route term or agreement.
- 100 percent of beneficiary own contribution for a publicly cofinanced task
Only for tasks cofinanced from public sources; up to 100% of beneficiary own contribution, not 100% of all project costs. Table 7 definition 4 defines own contribution as scheduled task outlays equal to eligible task costs less public aid obtained. The exact route does not establish the foreign-funding/public-aid status or an own-contribution amount.
- Repayment required before remission, minimumGeneral Rules 49/2026 Table 3 §3.1(d), conditional only; exact OA1.4 loan subtype unverified.
- 50 percent of loan principal used, repaid on time
Only if eventual loan subtype is remissible, all joint §3.1 prerequisites apply, and early repayment alone is not enough; this is a general conditional prerequisite, not an OA1.4 entitlement.
- Loan term, maximumCurrent WFOŚiGW Katowice General Rules 49/2026; conditional for exact OA1.4 loan unless displaced by a more specific binding route term or agreement.
- 240 months maximum from contractually stated project-completion date, including grace
Ordinary loan; §1.4.2 bridge exception is not route-listed. Half-principal repayment schedule condition also applies.
- Loan term, minimumCurrent WFOŚiGW Katowice General Rules 49/2026; conditional for exact OA1.4 loan unless displaced by a more specific binding route term or agreement.
- 48 months minimum from contractually stated project-completion date, including grace
Ordinary loan lower bound; actual schedule set by agreement. The §1.4 limits exclude bridge loans, which are not listed for this route.
Source documents
- WFOŚiGW Katowice General Rules 49/2026
- Katowice priority list for 2027
- WFOŚiGW Katowice selection criteria effective from 1 January 2012
- 08_wzor protokolu odbioru koncowego POE.doc
- Project marking guidance linked by OA1.4 route
- Public-aid attachment archive linked by OA1.4 page
- Exact Katowice OA1.4 / 95466 route page
- Regulamin naboru wniosków z zakresu ochrony atmosfery i ochrony przed hałasem, resolution 140/2024
Call facts
- Opens
- —
- Provider
- WFOŚiGW Katowice
- Source
- wfosigw.katowice.pl
- Checked
- 24 Oct 2026
- Review status
- Partial review
- Independent QA
- No published hold
- Reviewed
- 23 Oct 2026
This is a summary of the source page, not the official text. Eligibility, conditions and the submission system are at the source.