scindu funding
All calls

Inwestycje z zakresu ochrony atmosfery, dofinansowane ze środków zagranicznych

WFOŚiGW Katowice · National call

OA 1.7.

Summary

Not an R&D call a Polish company can use, by Scindu's rule.

Funds air protection investments co-financed from foreign sources; eligible applicants are unspecified.

Who can apply
Unclear from the source.
Amount
Budget not stated
Deadline
No deadline
Status
Open
Open the official pageRegister to keep this call

Machine-classified from the call text; check eligibility at the source.

Description

The description is on the provider's page.

Who can apply, in detail
Purpose
Energy, environment, infrastructure
R&D relevance
0 of 3
Poland eligible
Yes
Country limit
Poland, Śląskie voivodeship
Region
śląskie
Consortium
Unclear
Readiness level (TRL)
—
Topics
  • Air protection
  • Environmental investment

Machine-classified from the call text; check eligibility at the source. 23 Oct 2026

Conditions42

Typed facts extracted from the source documents by Scindu's grant-data review. Each value keeps its own conditions. Unknown means unstated, not zero or unlimited.

Applicant restrictionCurrent WFOŚiGW Katowice General Rules 49/2026; conditional for exact OA1.7 only if the corresponding Fund instrument/product is selected; current page and linked 2021 rule conflict on grant availability, and any special current route term controls unless displaced by a more specific binding route term or agreement.
The Fund conditions the loan and its amount on creditworthiness under banking law and appropriate legal security for repayment; the exact security form is not named on the route page.
Applicant restrictionCurrent WFOŚiGW Katowice General Rules 49/2026; conditional for exact OA1.7 only if the corresponding Fund instrument/product is selected; current page and linked 2021 rule conflict on grant availability, and any special current route term controls unless displaced by a more specific binding route term or agreement.
The Fund will not contract with entities that do not meet statutory fee/penalty obligations or have due liabilities to the Fund where collection steps have been taken.
Applicant restrictionConditional only for municipal applicants and only if the linked regulation remains applicable.
For tasks implemented by municipalities, the linked 2021 regulation conditions support on the municipality having introduced, or set a deadline to introduce, legal/systemic measures limiting pollutant concentrations; listed examples include a low-emissions plan, short-term action plan, heat supply plan, or land-use plan specifying heat supply conditions.
Applicant restrictionOnly the linked regulation’s own version and scope; exact current route links it, but later/current applicability is unverified.
The linked 2021 OA regulation expressly says it does not apply to state budget units. Because the current route prose says legal persons and its category tag is broader, record this as a route-linked regulatory exclusion whose present-day relationship to the page is unresolved.
Applicant restrictionLinked 2021 regulation §3(1) only; subject to continuing applicability and later special terms.
The linked 2021 regulation makes documented legal title to the land/property covered by the application a necessary condition to obtain funding. Current applicability is not independently verified.
Applicant typeExact current OA1.7 route page; do not treat the category tag as an independent legal-form eligibility list.
The exact route prose identifies “legal persons” as its applicants. This prose is distinct from the page’s broad “Other applicants” category tag and from the 2021 linked regulation’s exclusion of state budget units.
Application restrictionCurrent WFOŚiGW Katowice General Rules 49/2026; conditional for exact OA1.7 only if the corresponding Fund instrument/product is selected; current page and linked 2021 rule conflict on grant availability, and any special current route term controls unless displaced by a more specific binding route term or agreement.
For year-round directions in General Rules §5.2.2, tasks completed before application submission are not funded; this is a general rule, conditional on no more specific applicable exception.
Application restrictionCurrent WFOŚiGW Katowice General Rules 49/2026, conditional for exact OA1.7 where more specific route-linked rules do not displace it. The page independently states continuous intake and paper/e-Doręczenia handling; route-specific conflict on funding form remains unresolved.
Where the special terms do not displace the General Rules workflow, forms are made available in the Fund’s teleinformation system and applications are registered there. Deadlines for competition/intake rounds are set by their regulations or announcements; other directions not assigned a deadline are accepted year-round. An application is formally complete only when correctly filled and containing required information and documents. The Fund notifies the applicant within 30 days of receipt about completeness or missing items, extendable to 180 days when justified by application volume. The applicant must correct within 30 days of receiving notice (extensions to 60 days may be granted on a justified request); without timely correction, the application receives no further assessment. The Fund may request supplements at any assessment stage. A financing decision/promissory decision is for a fully prepared project with documents appropriate to its specifics; the Fund sends written notice of decision, loss of force, or refusal. If the agreement is not signed within four months of the decision (or another period stated in it), the decision expires; a timely extension request may lead the Fund Management Board to set a new deadline, and absent such request the decision expires. The exact route separately states its continuous intake and paper/e-Doręczenia handling; those route-specific directions are preserved.

The general process applies only where more specific terms do not displace it; OA1.7 separately states continuous intake and its paper/e-Doręczenia instructions.

Application restrictionLinked 2021 regulation §§6.1 and 2.2; later/current process version unresolved.
The linked regulation says formal assessment covers applications on applicable forms with complete required documents and that formal and substantive assessment occur simultaneously; deficiencies are corrected within the period set by the General Rules. It does not identify a route-specific complete document checklist.
Application restrictionLinked 2021 regulation §2; current route independently also states continuous intake, but present-day correction procedure is not confirmed.
The linked regulation instructs submission at the Fund’s Katowice office and provides continuous review. If the Fund reports missing items, the applicant has 30 days from notice to complete them; on a justified request submitted before that period ends, the deadline may be extended to 60 days. Late supplements are not further assessed. These details are from the 2021 linked version.
Application restrictionCurrent route page and exact v26 local-row snapshot only; no deadline or remaining pool inferred.
The exact route page says intake is continuous. Local index v26 marked this exact row open and has no opening or deadline date; live availability beyond those retained sources is unverified.
Application restrictionExact route page handling directions; do not infer application completeness or eligibility.
The route page says paper applications should not be stapled, bound, or put in sleeves, folders, or binders, except electronic media; complete documents may also be delivered through e-Doręczenia under the linked instruction.
Eligible project scopeExact linked 2021 regulation §1; continuing legal status unverified.
The linked 2021 regulation describes eligible tasks under its text as investment projects consistent with the priority list applicable in the given year. It does not establish whether that older text remains the current route’s complete eligibility rule.
Eligible project scopeExact OA1.7 route page; descriptive project scope only. The route-linked regulation and current priorities are recorded separately.
The exact route describes tasks reducing emissions to the environment, giving thermal insulation, heating-system modernization, OAZ installation, production-line modernization, and lighting modernization as examples; “e.g.” and “etc.” make these examples rather than an exhaustive list.
Other condition2027 priority list classification only.
The 2027 priority list contains a matching foreign-funded atmosphere-protection title under TE1.7. This confirms a classification/title match only, not an award pool, eligibility expansion or current route-specific decision.
Other conditionExact current route application tab; form selection/relevance depends on project and applicant.
The application tab links three alternative forms archives: other atmosphere tasks, thermomodernization without insulation, or thermomodernization with insulation, plus a public-aid documents archive. Their links establish available application materials, not a universal requirement or eligible-cost schedule.
Other conditionCurrent WFOŚiGW Katowice General Rules 49/2026; conditional for exact OA1.7 only if the corresponding Fund instrument/product is selected; current page and linked 2021 rule conflict on grant availability, and any special current route term controls unless displaced by a more specific binding route term or agreement.
A beneficiary must mark the project under the Fund’s project-marking rules available on its website.

Conditional on becoming a Fund beneficiary; details are in the separate referenced guidance.

Other conditionExact page metadata/category tag versus route applicant prose; preserve distinction.
The route page places the route under the “Other applicants” category tag, while its applicant prose says legal persons. The tag does not independently establish that every person or entity in that category is eligible.
Other conditionCurrent WFOŚiGW Katowice General Rules 49/2026; only if the selected exact OA1.7 loan is remissible and no more specific binding route term or agreement displaces the rule.
Only if the eventual OA1.7 loan product is remissible: General Rules 49/2026 require the cited no-public-reimbursement, timely completion/effect, durability-expiry, minimum timely repayment and current-Fund-obligations conditions. The exact route page does not identify remissible versus non-remissible loan subtype, so remission paths are conditional and not promised.
Other conditionCurrent WFOŚiGW Katowice General Rules 49/2026; conditional for exact OA1.7 only if the corresponding Fund instrument/product is selected; current page and linked 2021 rule conflict on grant availability, and any special current route term controls unless displaced by a more specific binding route term or agreement.
Only if this route’s eventual loan is remissible and all joint §3.1 conditions are met: remission is reduced by any Fund grant used on the same task; by 15% for amendments in the specific §3.2.3(a) cases (sewer connections, asbestos-removal mass, or municipal low-emission programmes); by 30% for other amendments reducing planned ecological effect; and by 5% per qualifying document or principal-installment delay exceeding 30 days. The §2.3(a) examples are not treated as OA1.7 conditions. Loans for tasks resulting from an administrative order to remove pollution consequences are not eligible for remission. These are conditional general rules, not evidence of this route’s loan subtype or remission entitlement.

Conditional on eventual remissible subtype, all joint §3.1 prerequisites and the precise facts in each cited subclause. §3.2.3(a) examples are not treated as route terms; the 30%/5% reductions and §3.4 exclusion apply only within their cited scopes.

Other conditionCurrent WFOŚiGW Katowice General Rules 49/2026; conditional for exact OA1.7 only if the corresponding Fund instrument/product is selected; current page and linked 2021 rule conflict on grant availability, and any special current route term controls unless displaced by a more specific binding route term or agreement.
Submitting a partial-remission request does not suspend current payments. Under the remission agreement, amounts paid under the loan after the remission request are refunded, without interest on the refunded sums.

Only if the loan subtype is remissible and a remission request and agreement occur. This does not establish that the route loan is remissible or that remission will be granted.

Other conditionConditional common remission procedure, General Rules Table 3 §§3.3.1–3.3.4; exact OA1.7 route page does not identify loan subtype.
Only if the eventual OA1.7 loan is remissible and a remission request is made: General Rules 49/2026 place decisions up to 0.5% of the Fund’s prior-year revenue with the Management Board and larger decisions with the Supervisory Board; the approved amount cannot exceed the borrower’s actual obligations under the loan contract on the request date. The rules in force on request date govern the decision; the Fund contracts with the applicant for the partial remission and controls the new task funded from remission proceeds. This is conditional procedure, not evidence that OA1.7 loan is remissible or remission will be approved.
Other conditionCurrent WFOŚiGW Katowice General Rules 49/2026; conditional for exact OA1.7 only if the corresponding Fund instrument/product is selected; current page and linked 2021 rule conflict on grant availability, and any special current route term controls unless displaced by a more specific binding route term or agreement.
A Fund-financing agreement is generally concluded after applicant selection of contractors or suppliers; earlier conclusion is possible when justified by the project’s nature.

Conditional general contract-process rule; the exact route does not establish procurement timing or a project-specific exception.

Other conditionCurrent WFOŚiGW Katowice General Rules 49/2026; conditional for exact OA1.7 only if the corresponding Fund instrument/product is selected; current page and linked 2021 rule conflict on grant availability, and any special current route term controls unless displaced by a more specific binding route term or agreement.
Fund support settlement counts expenditures incurred after the date the application was submitted, documented by invoices and related payment confirmations; both invoice date and payment date must satisfy this rule.
Other conditionLinked regulation §3(2) plus current separate General Rules; not an absolute route or call allocation.
The linked 2021 regulation refers maximum loan/grant amounts to the Fund’s separate “Rules.” The current captured General Rules 49/2026 are included as a separate source, but the route’s 2021 link and current route announcement create a source-version issue; route/project maxima remain unstated.
Other conditionEquipment condition only for the specified installation type, conditional on the linked regulation’s applicability.
If an eligible task installs a biomass- or solid-fuel-fired heat source, the linked 2021 regulation requires at least class-5 emissions performance and compliance with the listed Ecodesign requirements. This conditional equipment rule does not establish that such an installation is eligible under the route.
Other conditionCurrent WFOŚiGW Katowice General Rules 49/2026; conditional for exact OA1.7 only if the corresponding Fund instrument/product is selected; current page and linked 2021 rule conflict on grant availability, and any special current route term controls unless displaced by a more specific binding route term or agreement.
The beneficiary must maintain durability of the investment project created through the funded task for at least five years from its completion.
Other conditionCurrent WFOŚiGW Katowice General Rules 49/2026; conditional for exact OA1.7 only if the corresponding Fund instrument/product is selected; current page and linked 2021 rule conflict on grant availability, and any special current route term controls unless displaced by a more specific binding route term or agreement.
Foreign-currency invoices are settled using the NBP average exchange rate announced for the business day before the invoice date.

Applies only if the project has qualifying foreign-currency invoices.

Other conditionCurrent WFOŚiGW Katowice General Rules 49/2026; conditional for exact OA1.7 only if the corresponding Fund instrument/product is selected; current page and linked 2021 rule conflict on grant availability, and any special current route term controls unless displaced by a more specific binding route term or agreement.
At every stage of task implementation, the beneficiary must inform the Fund of the amount of financing obtained from other sources.
Other conditionCurrent WFOŚiGW Katowice General Rules 49/2026; conditional for exact OA1.7 only if the corresponding Fund instrument/product is selected; current page and linked 2021 rule conflict on grant availability, and any special current route term controls unless displaced by a more specific binding route term or agreement.
General rules permit advance payments according to the physical-financial schedule up to 90% of its value; for tasks financed through the state-budget targeted reserve, advances may reach 100%. The remaining amount is paid against invoices after previously paid advances are settled. This is a disbursement mechanism, not a total financing rate.

Conditional general disbursement rule; the route does not establish targeted-reserve financing, an awarded schedule, or actual advance amount.

Other conditionCurrent WFOŚiGW Katowice General Rules 49/2026; conditional for exact OA1.7 only if the corresponding Fund instrument/product is selected; current page and linked 2021 rule conflict on grant availability, and any special current route term controls unless displaced by a more specific binding route term or agreement.
Planned installments are paid no more often than once per calendar quarter.

Conditional on Fund support being disbursed in installments.

Other conditionCurrent WFOŚiGW Katowice General Rules 49/2026; conditional for exact OA1.7 only if the corresponding Fund instrument/product is selected; current page and linked 2021 rule conflict on grant availability, and any special current route term controls unless displaced by a more specific binding route term or agreement.
Installments, including advances, are conditional on Fund acceptance of a settlement reflecting current project progress and planned disbursements; subsequent advance installments also require accepted settlement of invoices for the prior advance.

Conditional general disbursement conditions; actual award and schedule are unknown.

Other conditionExact OA1.7 current page compared with exact linked 2021 regulation; instrument eligibility and route-specific current legal version remain unresolved.
The current page says grant and loan are jointly available up to 100% eligible costs, while its directly linked regulation (attached to 2021 resolution 1651/2021) says tasks co-financed from foreign funds receive Fund support exclusively as a loan. The current page’s 2026 modified metadata and 2027 priority code differ from the regulation’s 2021 classification. The sources do not establish whether the linked rule remains operative or whether the page reflects a superseding special rule; do not resolve the discrepancy.
Other conditionLinked 2021 regulation §6.2.2 for its OA1.8 category; current route applicability beyond the exact link is unresolved.
The linked 2021 regulation lists foreign-funded atmosphere protection under its OA1.8 category and applies its §2.1.1 and §2.1.2 criteria adapted to project character: EU standards/commitments, co-financing from EU or other foreign and domestic sources, ecological/economic efficiency and social effects. Because current route and 2027 codes differ, this records the linked criteria, not a confirmed current exhaustive test.
Other conditionSource-vintage/linkage statement only; does not itself determine continuing legal force.
The exact route links “Regulamin naboru wniosków” at the 2021 OA22 PDF URL. That PDF is attached to Management Board resolution 1651/2021 dated 11 October 2021. The route page is modified in 2026 and the 2027 priority list uses TE1.7; no newer route-linked replacement regulation was found in the captured page.
Other conditionCurrent WFOŚiGW Katowice General Rules 49/2026; conditional for exact OA1.7 only if the corresponding Fund instrument/product is selected; current page and linked 2021 rule conflict on grant availability, and any special current route term controls unless displaced by a more specific binding route term or agreement.
Under the general ordinary-loan rule, interest is preferential and variable by the bill rediscount rate; the applicable coefficient is applied to the rate in force on the first day of the contract month, and the rate is adjusted each subsequent month using the rediscount or base rate in force on that month’s first day. Public-aid loans may use the distinct §1.3.6 base-rate-plus-margin method, already stated separately in this packet. The exact contract rate remains unknown.

Conditional common-rule treatment where this exact route loan is governed by Table 1 and no more specific route terms displace it. Existing floors are minima, not actual rates. Public-aid terms remain conditional and route applicability is unknown.

Other conditionPartial negative finding limited to retained route page, linked regulation and form materials; personnel eligibility remains unknown.
The exact route page, linked 2021 regulation and route-linked application forms do not establish hiring permission, fundable job titles, headcount, salary rates, payroll reimbursement or a number of staff. No hiring or pay figures are inferred.
Other conditionExact current page, 2027 priority list and linked 2021 regulation; classification only.
The current route page identifies the route as OA1.7 and the 2027 priority list classifies the matching foreign-funded atmosphere-protection title as TE1.7. The linked 2021 regulation lists that category as OA1.8. These are source-version/category identifiers, not evidence that every priority-list task is eligible under this route.
Other conditionCurrent WFOŚiGW Katowice General Rules 49/2026; conditional for exact OA1.7 only if the corresponding Fund instrument/product is selected; current page and linked 2021 rule conflict on grant availability, and any special current route term controls unless displaced by a more specific binding route term or agreement.
For tasks governed by public-aid rules, the Fund may set a different annual interest calculation using the base rate at contract date plus the margin under the applicable European Commission communication, but not below the corresponding §1.3.2, §1.3.3 or §1.3.4 floor. The specific aid regime and resulting rate for an OA1.7 applicant are unknown.
Other conditionExact current route page; tab presence only, not a remission entitlement or loan subtype.
The page includes a tab labelled “Loan remission” and a line for a remission application, but it does not state whether the loan offered under this route is remissible or set remission criteria there. Conditional current General Rules remission terms are recorded separately.

No remission entitlement is inferred.

Other conditionExact current OA1.7 route page tab; implementation/publicity timing only, not cost eligibility.
The exact route page says an informational board is required for tasks planned to take more than six months, and a commemorative board is due within 30 days after task completion.

Applies to the route page’s specified project-duration condition and resulting Fund marking duty.

Other conditionNegative finding limited to exact current route page, local v26 row, linked archives and reviewed regulation; no absolute award/budget amount inferred.
The exact route page and v26 row state no route allocation, remaining call balance, per-project amount, absolute route cap or itemized eligible-cost schedule. The 100% intensity is a percentage ceiling, not an award amount or funding pool.
Amounts and costs17
Eligible costCurrent WFOŚiGW Katowice General Rules 49/2026; conditional for exact OA1.7 only where the corresponding Fund instrument/product is selected and no more specific binding route term or agreement displaces it; current page and linked 2021 rule conflict on grant availability.
General eligible costs are the physical-financial schedule items necessary to achieve the ecological effect and allowed by the schedule instructions. For publicly co-financed tasks, eligible costs also follow the rules of those public funding sources. No exact OA1.7 asbestos-specific cost line list or unit cap is established by the reviewed exact route page.
Funding intensity, maximumCurrent WFOŚiGW Katowice General Rules 49/2026 §4; conditional for exact OA1.7 where Fund and other public support are both used for the same task; applies across Fund forms, with bridge loans excepted, unless a more specific binding term displaces it. Separate from the route-page 100% grant+loan intensity and does not resolve route product availability.
100 percent of eligible project costs combined from Fund and other public sources

General Rules §4 caps combined Fund and other public support at 100% of eligible task costs, irrespective of Fund form, except bridge loans. Apply only where both Fund support and other public support finance the same task and no more specific binding term displaces the rule; this is not an OA1.7 product entitlement or project award cap.

Funding intensity, maximumGeneral Rules 49/2026 Table 1 §1.2.1, ordinary Fund loan; conditional for OA1.7 route. Conditional for exact OA1.7 only where the relevant Fund product is selected and no specific route term displaces it.
100 percent of eligible task costs

Only if the eventual selected Fund product is an ordinary loan; this loan-specific cap is separate from the route page’s announced joint grant-and-loan intensity and the General Rules §4 aggregate public-support cap.

Funding intensity, maximumExact current route page text. Preserve separately from the General Rules combined Fund-plus-other-public-aid limit and the linked 2021 regulation conflict.
100 percent of eligible project costs for grant and loan combined

The current route page announces grant and loan together up to this combined intensity. It does not assign separate caps to either form, define per-project award amounts, or resolve conflict with the linked 2021 regulation’s foreign-cofinancing loan-only clause.

Ineligible costOnly the specifically described task, conditional on the linked 2021 regulation still applying.
The linked 2021 regulation excludes funding tasks that disconnect, on the recipient’s initiative, from a public municipal district-heating network supplied by a heat source with an emitter exceeding 40 metres.
Grace period, maximumCurrent WFOŚiGW Katowice General Rules 49/2026; conditional for exact OA1.7 only if the corresponding Fund instrument/product is selected; current page and linked 2021 rule conflict on grant availability, and any special current route term controls unless displaced by a more specific binding route term or agreement.
18 months maximum after contractually stated project completion

Repayment starts not earlier than 6 months after contractual completion; bridge-loan exception does not apply to this route loan branch.

Loan interest, minimumCurrent WFOŚiGW Katowice General Rules 49/2026; conditional for exact OA1.7 only if the corresponding Fund instrument/product is selected; current page and linked 2021 rule conflict on grant availability, and any special current route term controls unless displaced by a more specific binding route term or agreement.
1.5 percent per annum minimum for non-remissible loans

Only if the route contract is non-remissible; rate in the actual agreement remains unknown.

Loan interest, minimumCurrent WFOŚiGW Katowice General Rules 49/2026; conditional for exact OA1.7 only if the corresponding Fund instrument/product is selected; current page and linked 2021 rule conflict on grant availability, and any special current route term controls unless displaced by a more specific binding route term or agreement.
2 percent per annum minimum

Only a qualifying municipality/county and remissible loan; subsidy entitlement year is the year the loan application is filed.

Loan interest, minimumCurrent WFOŚiGW Katowice General Rules 49/2026; conditional for exact OA1.7 only if the corresponding Fund instrument/product is selected; current page and linked 2021 rule conflict on grant availability, and any special current route term controls unless displaced by a more specific binding route term or agreement.
3 percent per annum minimum for remissible loans

If remissible; §1.3.4 contains a separate qualifying municipal/county rate floor.

Loan partial remission, maximum amountCurrent WFOŚiGW Katowice General Rules 49/2026; conditional for exact OA1.7 only if the corresponding Fund instrument/product is selected; current page and linked 2021 rule conflict on grant availability, and any special current route term controls unless displaced by a more specific binding route term or agreement.
PLN 200,000

10% of principal used, capped at PLN 200,000; no earmark to a new task.

Loan partial remission, maximum amountCurrent WFOŚiGW Katowice General Rules 49/2026; conditional for exact OA1.7 only if the corresponding Fund instrument/product is selected; current page and linked 2021 rule conflict on grant availability, and any special current route term controls unless displaced by a more specific binding route term or agreement.
PLN 4,000,000

35% of principal used; remission proceeds must fund a qualifying new environmental task.

Loan partial remission, maximum shareCurrent WFOŚiGW Katowice General Rules 49/2026; conditional for exact OA1.7 only if the corresponding Fund instrument/product is selected; current page and linked 2021 rule conflict on grant availability, and any special current route term controls unless displaced by a more specific binding route term or agreement.
10 percent of principal used

Alternative A; capped at PLN 200,000 and has no new-task earmark.

Loan partial remission, maximum shareCurrent WFOŚiGW Katowice General Rules 49/2026; conditional for exact OA1.7 only if the corresponding Fund instrument/product is selected; current page and linked 2021 rule conflict on grant availability, and any special current route term controls unless displaced by a more specific binding route term or agreement.
35 percent of principal used

Alternative B; requires remission proceeds for a new environmental task aligned with Environmental Protection Law objectives, with separate PLN 4m cap.

Loan principal, maximum shareCurrent WFOŚiGW Katowice General Rules 49/2026; conditional for exact OA1.7 only if the corresponding Fund instrument/product is selected; current page and linked 2021 rule conflict on grant availability, and any special current route term controls unless displaced by a more specific binding route term or agreement.
100 percent of beneficiary own contribution for a publicly cofinanced task

Only for tasks cofinanced from public sources; up to 100% of beneficiary own contribution, not 100% of all project costs. Table 7 definition 4 defines own contribution as scheduled task outlays equal to eligible task costs less public aid obtained. The exact route does not establish the foreign-funding/public-aid status or an own-contribution amount.

Repayment required before remission, minimumGeneral Rules 49/2026 Table 3 §3.1(d), conditional only; exact OA1.7 loan subtype unverified.
50 percent of loan principal used, repaid on time

Only if eventual loan subtype is remissible, all joint §3.1 prerequisites apply, and early repayment alone is not enough; this is a general conditional prerequisite, not an OA1.7 entitlement.

Loan term, maximumCurrent WFOŚiGW Katowice General Rules 49/2026; conditional for exact OA1.7 only if the corresponding Fund instrument/product is selected; current page and linked 2021 rule conflict on grant availability, and any special current route term controls unless displaced by a more specific binding route term or agreement.
240 months maximum from contractually stated project-completion date, including grace

Ordinary loan; §1.4.2 bridge exception is not route-listed. Half-principal repayment schedule condition also applies.

Loan term, minimumCurrent WFOŚiGW Katowice General Rules 49/2026; conditional for exact OA1.7 only if the corresponding Fund instrument/product is selected; current page and linked 2021 rule conflict on grant availability, and any special current route term controls unless displaced by a more specific binding route term or agreement.
48 months minimum from contractually stated project-completion date, including grace

Ordinary loan lower bound; actual schedule set by agreement. The §1.4 limits exclude bridge loans, which are not listed for this route.

Source documents9
Call facts
Opens
—
Provider
WFOŚiGW Katowice
Checked
24 Oct 2026
Review status
Partial review
Independent QA
No published hold
Reviewed
24 Oct 2026

This is a summary of the source page, not the official text. Eligibility, conditions and the submission system are at the source.