scindu funding
All calls

Działania zmierzające do zmniejszenia uciążliwości hałasu drogowego

WFOŚiGW Katowice · National call

HA 1.1.

Summary

Not an R&D call a Polish company can use, by Scindu's rule.

Supports measures reducing road noise impacts; applicant types are unspecified.

Who can apply
Unclear from the source.
Amount
Budget not stated
Deadline
No deadline
Status
Open
Open the official pageRegister to keep this call

Machine-classified from the call text; check eligibility at the source.

Description

The description is on the provider's page.

Who can apply, in detail
Purpose
Energy, environment, infrastructure
R&D relevance
0 of 3
Poland eligible
Yes
Country limit
Poland
Region
Any
Consortium
Unclear
Readiness level (TRL)
—
Topics
  • Road noise
  • Noise mitigation

Machine-classified from the call text; check eligibility at the source. 23 Oct 2026

Conditions31

Typed facts extracted from the source documents by Scindu's grant-data review. Each value keeps its own conditions. Unknown means unstated, not zero or unlimited.

Applicant restrictionCurrent General Rules 49/2026, conditional for exact HA1.1 Fund loan.
The Fund’s general rules exclude contracting with entities that do not meet statutory fee/penalty obligations or have due liabilities to the Fund where collection steps have been taken. The route page’s legal-person applicant statement remains a separate route-specific class.

Conditional Fund contracting screen; exact application may be affected by a later binding provision.

Applicant restrictionCurrent WFOŚiGW Katowice General Rules 49/2026; conditional for exact HA1.1 loan unless displaced by a more specific binding route term or agreement.
The Fund conditions the loan and its amount on creditworthiness under banking law and appropriate legal security for repayment; the exact security form is not named on the route page.
Applicant restrictionCurrent WFOŚiGW Katowice General Rules 49/2026; conditional for exact HA1.1 loan unless displaced by a more specific binding route term or agreement.
The Fund will not contract with entities that do not meet statutory fee/penalty obligations or have due liabilities to the Fund where collection steps have been taken.
Applicant typeExact current route page; page prose distinguished from catalogue tags.
The route prose names legal persons as the applicant class. The route’s catalogue category tags are broader and are not independent evidence that a natural person can apply.
Application restrictionCurrent WFOŚiGW Katowice General Rules 49/2026; conditional for exact HA1.1 loan unless displaced by a more specific binding route term or agreement.
For year-round directions in General Rules §5.2.2, tasks completed before application submission are not funded; this is a general rule, conditional on no more specific applicable exception.
Application restrictionExact HA1.1 route page plus current read-only catalogue snapshot.
The exact route page states a continuous application intake. The current v27 local row also has status open; neither source provides opening/deadline dates, current remaining funds, or confirmation that an application submitted at a later time will be funded.
Application restrictionCurrent WFOŚiGW Katowice General Rules 49/2026, conditional for exact HA1.1; physical pp.9–10.
Under current General Rules 49/2026, Fund application forms are provided in its ICT system and applications are registered there. Formal completeness requires proper completion, all necessary information and required documents. The Fund normally gives written completeness/deficiency notice within 30 days of receipt, extendable to 180 days when justified by application volume; the applicant has 30 days to correct after notice (on request and with justification this may extend to 60), otherwise the application receives no further assessment. The Fund may request supplements at any stage. A funding decision or promise is made by the competent Fund body, decisions require tasks fully prepared with documents appropriate to the task and delivery method, and the applicant receives written notice. Unless the decision sets another term, the funding agreement must be concluded within four months; the Fund Board may set a new term on a timely request submitted before expiry, otherwise the decision expires.

General Rules workflow is conditional for exact HA1.1 where not displaced by a more specific route rule or decision. These general requirements do not establish a route-specific HA application form, award, or guarantee of funding.

Eligible project scopeAnnual priority classification only; applicable list depends on relevant year.
The 2026 and 2027 Katowice priority lists include HA1.1: road-noise nuisance reduction, matching the title and scope of this route. The classification does not supply technical eligibility thresholds or a cost catalogue.
Eligible project scopeExact route page; interpret only the stated intervention.
The route page describes tasks consisting of constructing acoustic screens along roads to reduce road-noise nuisance. It gives no numeric noise-reduction threshold, road class, project length, screen specification, or detailed cost lines.
Other conditionCurrent WFOŚiGW Katowice General Rules 49/2026; conditional for exact HA1.1 loan unless displaced by a more specific binding route term or agreement.
A beneficiary must mark the project under the Fund’s project-marking rules available on its website.

Conditional on becoming a Fund beneficiary; details are in the separate referenced guidance.

Other conditionMetadata discrepancy only; do not treat tags as additional applicant authority.
The route page’s category tags include JST, SME, entrepreneur, and housing-cooperative/community/TBS classes. These tags are recorded separately from the route prose “legal persons”; the exact public page’s prose does not itself enumerate the tagged classes or explain their relationship.
Other conditionCurrent WFOŚiGW Katowice General Rules 49/2026; only if the selected exact HA1.1 loan is remissible and no more specific binding route term or agreement displaces the rule.
Only if the selected HA1.1 loan product is remissible: under current General Rules, a partial-remission request is conditional on no reimbursement from public funds (including EU funds), timely task completion and settlement, achievement of agreed effects on time, expiry of task durability, at least 50% of used principal repaid on time (early repayment alone does not qualify), and the borrower being current on statutory charges and obligations to the Fund. The exact route page does not identify the loan subtype, so these are conditional general-rule terms, not a route entitlement.
Other conditionCurrent WFOŚiGW Katowice General Rules 49/2026; conditional for exact HA1.1 loan unless displaced by a more specific binding route term or agreement.
Only if this route’s eventual loan is remissible and all joint §3.1 conditions are met: remission is reduced by any Fund grant used on the same task; by 15% for amendments in the specific §3.2.3(a) cases (sewer connections, asbestos-removal mass, or municipal low-emission programmes); by 30% for other amendments reducing planned ecological effect; and by 5% per qualifying document or principal-installment delay exceeding 30 days. The §2.3(a) examples are not treated as HA1.1 conditions. Loans for tasks resulting from an administrative order to remove pollution consequences are not eligible for remission. These are conditional general rules, not evidence of this route’s loan subtype or remission entitlement.

Conditional on eventual remissible subtype, all joint §3.1 prerequisites and the precise facts in each cited subclause. §3.2.3(a) examples are not treated as route terms; the 30%/5% reductions and §3.4 exclusion apply only within their cited scopes.

Other conditionCurrent WFOŚiGW Katowice General Rules 49/2026; conditional for exact HA1.1 loan unless displaced by a more specific binding route term or agreement.
Submitting a partial-remission request does not suspend current payments. Under the remission agreement, amounts paid under the loan after the remission request are refunded, without interest on the refunded sums.

Only if the loan subtype is remissible and a remission request and agreement occur. This does not establish that the route loan is remissible or that remission will be granted.

Other conditionConditional common remission procedure, General Rules Table 3 §§3.3.1–3.3.4; exact HA1.1 route page does not identify loan subtype.
Only if the eventual HA1.1 loan is remissible and a remission request is made: General Rules 49/2026 place decisions up to 0.5% of the Fund’s prior-year revenue with the Management Board and larger decisions with the Supervisory Board; the approved amount cannot exceed the borrower’s actual obligations under the loan contract on the request date. The rules in force on request date govern the decision; the Fund contracts with the applicant for the partial remission and controls the new task funded from remission proceeds. This is conditional procedure, not evidence that HA1.1 loan is remissible or remission will be approved.
Other conditionCurrent WFOŚiGW Katowice General Rules 49/2026; conditional for exact HA1.1 loan unless displaced by a more specific binding route term or agreement.
A Fund-financing agreement is generally concluded after applicant selection of contractors or suppliers; earlier conclusion is possible when justified by the project’s nature.

Conditional general contract-process rule; the exact route does not establish procurement timing or a project-specific exception.

Other conditionCurrent WFOŚiGW Katowice General Rules 49/2026; conditional for exact HA1.1 loan unless displaced by a more specific binding route term or agreement.
Fund support settlement counts expenditures incurred after the date the application was submitted, documented by invoices and related payment confirmations; both invoice date and payment date must satisfy this rule.
Other conditionCurrent General Rules 49/2026; current 2026/2027 priority versions retained separately.
Fund support is based on the current annual priority list, project-selection criteria, Fund financial plan, and General Rules, subject to applicable public-aid law. This establishes the governing decision framework but does not assert a route-specific score or funding entitlement.
Other conditionCurrent WFOŚiGW Katowice General Rules 49/2026; conditional for exact HA1.1 loan unless displaced by a more specific binding route term or agreement.
The beneficiary must maintain durability of the investment project created through the funded task for at least five years from its completion.
Other conditionCurrent WFOŚiGW Katowice General Rules 49/2026; conditional for exact HA1.1 loan unless displaced by a more specific binding route term or agreement.
Foreign-currency invoices are settled using the NBP average exchange rate announced for the business day before the invoice date.

Applies only if the project has qualifying foreign-currency invoices.

Other conditionCurrent WFOŚiGW Katowice General Rules 49/2026; conditional for exact HA1.1 loan unless displaced by a more specific binding route term or agreement.
At every stage of task implementation, the beneficiary must inform the Fund of the amount of financing obtained from other sources.
Other conditionCurrent WFOŚiGW Katowice General Rules 49/2026; conditional for exact HA1.1 loan unless displaced by a more specific binding route term or agreement.
General rules permit advance payments according to the physical-financial schedule up to 90% of its value; for tasks financed through the state-budget targeted reserve, advances may reach 100%. The remaining amount is paid against invoices after previously paid advances are settled. This is a disbursement mechanism, not a total financing rate.

Conditional general disbursement rule; the route does not establish targeted-reserve financing, an awarded schedule, or actual advance amount.

Other conditionCurrent WFOŚiGW Katowice General Rules 49/2026; conditional for exact HA1.1 loan unless displaced by a more specific binding route term or agreement.
Planned installments are paid no more often than once per calendar quarter.

Conditional on Fund support being disbursed in installments.

Other conditionCurrent WFOŚiGW Katowice General Rules 49/2026; conditional for exact HA1.1 loan unless displaced by a more specific binding route term or agreement.
Installments, including advances, are conditional on Fund acceptance of a settlement reflecting current project progress and planned disbursements; subsequent advance installments also require accepted settlement of invoices for the prior advance.

Conditional general disbursement conditions; actual award and schedule are unknown.

Other conditionPreserves source wording differences; no guarantee, credit or loan subtype inferred.
The exact route page specifically states loan funding, while the normalized catalogue action type groups loan, guarantee, or credit under a repayable-instrument label. The page does not identify any guarantee or credit product or the loan subtype.
Other conditionExact page and current local row; no denominator or pool is inferred.
Neither the exact page nor the current local row states an annual call allocation, remaining budget, or fixed PLN project-award cap. The 100% intensity is a percentage ceiling, not a funding pool or an absolute award amount.
Other conditionCurrent WFOŚiGW Katowice General Rules 49/2026; conditional for exact HA1.1 loan unless displaced by a more specific binding route term or agreement.
Under the general ordinary-loan rule, interest is preferential and variable by the bill rediscount rate; the applicable coefficient is applied to the rate in force on the first day of the contract month, and the rate is adjusted each subsequent month using the rediscount or base rate in force on that month’s first day. Public-aid loans may use the distinct §1.3.6 base-rate-plus-margin method, already stated separately in this packet. The exact contract rate remains unknown.

Conditional common-rule treatment where this exact route loan is governed by Table 1 and no more specific route terms displace it. Existing floors are minima, not actual rates. Public-aid terms remain conditional and route applicability is unknown.

Other conditionNo staffing/compensation rows are supported by the retained applicable sources.
The exact route page and reviewed applicable current sources do not establish funded roles, hiring conditions, headcount, employment type, salary, or pay rates. No job or payroll promise is made.
Other conditionCurrent WFOŚiGW Katowice General Rules 49/2026; conditional for exact HA1.1 loan unless displaced by a more specific binding route term or agreement.
For tasks governed by public-aid rules, the Fund may set a different annual interest calculation using the base rate at contract date plus the margin under the applicable European Commission communication, but not below the corresponding §1.3.2, §1.3.3 or §1.3.4 floor. The specific aid regime and resulting rate for an HA1.1 applicant are unknown.
Other conditionExact page link labels; OA24 content not treated as HA1.1 operative terms.
The route page’s application tab links materials explicitly labeled for other atmosphere-protection tasks and the OA24 regulation. These are not presented as HA1.1-specific application conditions; no OA-only eligibility or technical provisions are imported into this noise route. The route page does link the general Fund project-marking guidance.
Other conditionUnknowns are route-specific; no cost or personnel category is inferred from unrelated OA forms linked in the page.
The route page supplies only the intervention description and eligible-cost percentage. It does not list detailed eligible or excluded acoustic-screen cost lines, design/supervision treatment, equipment dimensions, staffing or payroll categories.
Amounts and costs16
Eligible costCurrent WFOŚiGW Katowice General Rules 49/2026; conditional for exact HA1.1 unless displaced by a more specific binding route term or agreement.
General eligible costs are the physical-financial schedule items necessary to achieve the ecological effect and allowed by the schedule instructions. For publicly co-financed tasks, eligible costs also follow the rules of those public funding sources. No exact HA1.1 asbestos-specific cost line list or unit cap is established by the reviewed exact route page.
Funding intensity, maximumCurrent WFOŚiGW Katowice General Rules 49/2026 §4; conditionally applicable to exact call 95476 whenever Fund support and other public support finance the same task, irrespective of Fund support form, unless a more specific binding term displaces the rule; bridge loans are excepted. This does not establish availability of a grant, loan subtype, route-specific award, or remaining budget.
100 percent of eligible project costs combined from Fund and other public sources

General Rules 49/2026 §4: where a task receives both WFOŚiGW Fund support and support from other public sources, their combined support may not exceed 100% of eligible task costs, except for bridge loans. This is a general aggregate ceiling, not a route-specific product entitlement or award cap; apply only when both kinds of support finance the task and no more specific binding term displaces it.

Funding intensity, maximumGeneral Rules 49/2026 Table 1 §1.2.1, ordinary Fund loan; conditional for HA1.1 route.
100 percent of eligible task costs

Conditional ordinary-loan rule only, where not displaced by more specific binding terms; amount depends on ecological effects and Fund financial capacity. It is not an actual award or route budget.

Grace period, maximumCurrent WFOŚiGW Katowice General Rules 49/2026; conditional for exact HA1.1 loan unless displaced by a more specific binding route term or agreement.
18 months maximum after contractually stated project completion

Repayment starts not earlier than 6 months after contractual completion; bridge-loan exception does not apply to this route loan branch.

Loan interest, minimumCurrent WFOŚiGW Katowice General Rules 49/2026; conditional for exact HA1.1 loan unless displaced by a more specific binding route term or agreement.
1.5 percent per annum minimum for non-remissible loans

Only if the route contract is non-remissible; rate in the actual agreement remains unknown.

Loan interest, minimumCurrent WFOŚiGW Katowice General Rules 49/2026; conditional for exact HA1.1 loan unless displaced by a more specific binding route term or agreement.
2 percent per annum minimum

Only a qualifying municipality/county and remissible loan; subsidy entitlement year is the year the loan application is filed.

Loan interest, minimumCurrent WFOŚiGW Katowice General Rules 49/2026; conditional for exact HA1.1 loan unless displaced by a more specific binding route term or agreement.
3 percent per annum minimum for remissible loans

If remissible; §1.3.4 contains a separate qualifying municipal/county rate floor.

Loan partial remission, maximum amountCurrent WFOŚiGW Katowice General Rules 49/2026; conditional for exact HA1.1 loan unless displaced by a more specific binding route term or agreement.
PLN 200,000

10% of principal used, capped at PLN 200,000; no earmark to a new task.

Loan partial remission, maximum amountCurrent WFOŚiGW Katowice General Rules 49/2026; conditional for exact HA1.1 loan unless displaced by a more specific binding route term or agreement.
PLN 4,000,000

35% of principal used; remission proceeds must fund a qualifying new environmental task.

Loan partial remission, maximum shareCurrent WFOŚiGW Katowice General Rules 49/2026; conditional for exact HA1.1 loan unless displaced by a more specific binding route term or agreement.
10 percent of principal used

Alternative A; capped at PLN 200,000 and has no new-task earmark.

Loan partial remission, maximum shareCurrent WFOŚiGW Katowice General Rules 49/2026; conditional for exact HA1.1 loan unless displaced by a more specific binding route term or agreement.
35 percent of principal used

Alternative B; requires remission proceeds for a new environmental task aligned with Environmental Protection Law objectives, with separate PLN 4m cap.

Loan principal, maximum shareExact HA1.1 route page; loan branch explicitly stated.
100 percent of eligible task costs

The route page says a loan may finance up to 100% of eligible costs. It states no fixed project-amount cap or remaining allocation; actual amount and underwriting depend on Fund assessment and applicable current rules.

Loan principal, maximum shareCurrent WFOŚiGW Katowice General Rules 49/2026; conditional for exact HA1.1 loan unless displaced by a more specific binding route term or agreement.
100 percent of beneficiary own contribution for a publicly cofinanced task

Only for tasks cofinanced from public sources; up to 100% of beneficiary own contribution, not 100% of all project costs. General Rules Table 7 definition 4 defines own contribution as scheduled task outlays equal to eligible task costs less public aid obtained. The exact HA1.1 route does not establish public cofinancing or an own-contribution amount.

Repayment required before remission, minimumGeneral Rules 49/2026 Table 3 §3.1(d), conditional only; exact HA1.1 loan subtype unverified.
50 percent of loan principal used, repaid on time

Only if eventual loan subtype is remissible, all joint §3.1 prerequisites apply, and early repayment alone is not enough; this is a general conditional prerequisite, not an HA1.1 entitlement.

Loan term, maximumCurrent WFOŚiGW Katowice General Rules 49/2026; conditional for exact HA1.1 loan unless displaced by a more specific binding route term or agreement.
240 months maximum from contractually stated project-completion date, including grace

Ordinary loan; §1.4.2 bridge exception is not route-listed. Half-principal repayment schedule condition also applies.

Loan term, minimumCurrent WFOŚiGW Katowice General Rules 49/2026; conditional for exact HA1.1 loan unless displaced by a more specific binding route term or agreement.
48 months minimum from contractually stated project-completion date, including grace

Ordinary loan lower bound; actual schedule set by agreement. The §1.4 limits exclude bridge loans, which are not listed for this route.

Source documents5
Call facts
Opens
—
Provider
WFOŚiGW Katowice
Checked
24 Oct 2026
Review status
Partial review
Independent QA
No published hold
Reviewed
24 Oct 2026

This is a summary of the source page, not the official text. Eligibility, conditions and the submission system are at the source.