scindu funding
All calls

Usuwanie skutków zagrożeń środowiska, w tym poważnych awarii w środowisku i poprzez doposażenie służb ratowniczych

WFOŚiGW Katowice · National call

NZ 2.1.

Summary

Not an R&D call a Polish company can use, by Scindu's rule.

Supports environmental emergency remediation and equipment for rescue services; eligible applicants are unspecified.

Who can apply
Unclear from the source.
Amount
Budget not stated
Deadline
No deadline
Status
Open
Open the official pageRegister to keep this call

Machine-classified from the call text; check eligibility at the source.

Description

The description is on the provider's page.

Who can apply, in detail
Purpose
Energy, environment, infrastructure
R&D relevance
0 of 3
Poland eligible
Yes
Country limit
Poland, Silesian Voivodeship
Region
śląskie
Consortium
Unclear
Readiness level (TRL)
—
Topics
  • Environmental emergency response
  • Rescue equipment
  • Industrial accident remediation

Machine-classified from the call text; check eligibility at the source. 23 Oct 2026

Conditions16

Typed facts extracted from the source documents by Scindu's grant-data review. Each value keeps its own conditions. Unknown means unstated, not zero or unlimited.

Applicant type
The route page specifies State Fire Service and Volunteer Fire Service units operating in the Silesian Voivodeship.
Eligible project scope
The route supports equipment and equipment-upgrade purchases, including specialist vehicles and rescue-firefighting vehicles, for responding to environmental threats and major accidents.
Other condition
Separately, §1.2.3(b) states that a bridge loan may reach up to 100% of public co-financing obtained. Bridge loans are excepted from the ordinary combined public-support ceiling. The route page does not identify a bridge-loan subtype or establish that one is offered; this is not the ordinary-loan cap.
Other condition
If an ordinary standard loan is the applicable route instrument, its preferential interest is variable by reference to the bill rediscount rate. The applicable factor is applied to the rate in force on the first day of the month in which the loan agreement is concluded, and the rate is adjusted on the first day of each subsequent month. The route does not establish the loan subtype or that this loan option is offered.
Other condition
For an ordinary standard loan under §1.4.1, half of the loan principal must be scheduled for repayment no earlier than halfway through the repayment period (the period from first to last instalment). Repayment begins no earlier than six months after the contractual task-completion date. This is a conditional framework rule, not a route-specific offer; bridge loans are excluded.
Other condition
Only if the task is subject to public-aid rules, §1.3.6 provides an alternative rate based on the applicable base rate and European Commission reference/discounter margin on the contract date, and not below the relevant minimum rate. The exact route does not establish public-aid status or that this rate branch applies.
Other condition
For a task co-financed from public funds, §1.2.3(a) states that financing may reach 100% of the beneficiary’s own contribution. Table 7 defines that contribution as the scheduled part of outlays equal to eligible task costs minus public aid obtained; this is not automatically the entire project budget or every financing gap. This distinct public-cofinance branch does not establish that the exact route has this structure or offers the product.

Conditional public-cofinance framework branch only; the route does not establish this financing structure or offer. The denominator is the beneficiary own contribution as defined in Table 7 definition 4 (planned eligible costs minus public aid obtained), not a general project-cost ceiling.

Other condition
For directions not assigned a deadline or competition, the Fund accepts applications throughout the year. Such tasks completed before submission are not financed. The exact route page labels an intake continuous, but portal acceptance and available funds were not checked.
Other condition
Eligible costs are the necessary schedule positions specified in the schedule-filling instructions to achieve the environmental effect; work performed by the beneficiary’s own forces is excluded. For publicly co-financed tasks the source-specific eligible-cost definitions also apply.
Other condition
Under the current general rules, expenditure is considered only if incurred after application; both invoice date and related payment date must be after submission and evidenced by invoices and payment confirmations.
Other condition
The Fund conditions ordinary-loan granting and amount on borrower creditworthiness under banking law and suitable legal repayment security. The exact route page does not establish its loan subtype or offer.
Other condition
A non-remissible loan cannot be combined with a Fund grant for the same task; this applies only if the route’s loan is determined to be non-remissible.
Other condition
The page labels this intake continuous; live availability and funds remain unverified.
Other condition
The route lists a loan and transfer of funds; it states no rate, cap or repayment terms here.
Other condition
The 2027 list includes equipping rescue services to remove environmental threats, including major accidents; it is not an intake schedule.
Other condition
General Rules 49/2026 became effective on 1 May 2026 and apply to decisions from that date. Route-specific special rules govern their own terms, deadlines, forms and funding amounts; the General Rules fill matters not regulated by those special rules.
Amounts and costs7
Funding intensity, maximumcombined WFOŚiGW and other public support for the same task
100 percent of eligible task costs

Except bridge loans; route-specific special conditions take precedence under §15.

Grace period, maximumordinary loan branch only
18 months after contractual completion

Grace is measured after the contractual task-completion date; repayments begin no earlier than six months after that date. Ordinary standard-loan framework only; bridge loans excluded; exact route subtype unresolved.

Loan interest, minimumordinary non-remissible loan option only
1.5 percent per annum minimum

Variable rate at 0.40 s.r.w. with 1.5% floor; exact route subtype unresolved.

Loan interest, minimumordinary remissible loan option only
3 percent per annum minimum

Rate is variable at 0.80 s.r.w. with 3% floor; route-specific subtype and borrower eligibility unresolved.

Loan principal, maximum shareordinary loan branch only; not the route’s transfer component
100 percent of eligible costs

Exact route loan subtype is unconfirmed. Excludes bridge loan; special rules may control.

Loan term, maximumordinary loan branch only
240 months maximum repayment period including grace

The repayment period is measured from the contractual task-completion date and includes grace; half of principal must be scheduled no earlier than halfway through the repayment period. Ordinary standard-loan framework only; bridge loans excluded; exact route subtype unresolved.

Loan term, minimumordinary loan branch only
48 months minimum repayment period including grace

Maximum 240 months including grace; the period is measured from the contractual task-completion date. The 48-month minimum includes grace. Ordinary standard-loan framework only; bridge loans excluded; exact route subtype unresolved.

Source documents3
Call facts
Opens
—
Provider
WFOŚiGW Katowice
Checked
24 Oct 2026
Review status
Partial review
Independent QA
No published hold
Reviewed
23 Oct 2026

This is a summary of the source page, not the official text. Eligibility, conditions and the submission system are at the source.