scindu funding
All calls

Tworzenie warunków do przeciwdziałania poważnym awariom

WFOŚiGW Katowice · National call

NZ 1.1.

Summary

Not an R&D call a Polish company can use, by Scindu's rule.

Supports measures enabling prevention of major accidents; eligible applicants are unspecified.

Who can apply
Unclear from the source.
Amount
Budget not stated
Deadline
No deadline
Status
Open
Open the official pageRegister to keep this call

Machine-classified from the call text; check eligibility at the source.

Description

The description is on the provider's page.

Who can apply, in detail
Purpose
Energy, environment, infrastructure
R&D relevance
0 of 3
Poland eligible
Yes
Country limit
Poland, Silesian Voivodeship
Region
śląskie
Consortium
Unclear
Readiness level (TRL)
—
Topics
  • Major accident prevention
  • Environmental safety

Machine-classified from the call text; check eligibility at the source. 23 Oct 2026

Conditions14

Typed facts extracted from the source documents by Scindu's grant-data review. Each value keeps its own conditions. Unknown means unstated, not zero or unlimited.

Applicant type
The page specifies a direct investor with legal title to dispose of the property.
Eligible project scope
The route covers replacement or adaptation of installation elements intended to prevent or limit consequences of a major accident.
Other condition
Separately, a bridge loan may reach 100% of public co-financing obtained and is excepted from the combined support ceiling. The exact route does not identify a bridge-loan subtype or establish that one is offered; this branch is distinct from the ordinary-loan ceiling.
Other condition
If an ordinary standard loan is the applicable route instrument, its general preferential rate is variable by reference to the bill rediscount rate; the applicable factor uses the rate in force on the first day of the agreement month, with monthly adjustment on the first day of each subsequent month. The exact route does not establish this loan subtype or that it is offered.
Other condition
For an ordinary standard loan, half the principal must be scheduled no earlier than halfway through the repayment period (measured first to last instalment); repayment begins no earlier than six months after the contractual task-completion date. Conditional framework only, not a route-specific offer; bridge loans are excluded.
Other condition
Only for tasks subject to public-aid rules, §1.3.6 permits another rate based on the contract-date base rate plus the European Commission reference/discounter margin, not below the relevant minimum floor. The route does not establish public-aid status or that this branch applies.
Other condition
For public-cofinanced tasks, §1.2.3(a) allows financing up to 100% of the beneficiary’s own contribution. Table 7 definition 4 defines own contribution as scheduled outlays equal to eligible task costs less public aid obtained. This does not establish that the exact route has this funding structure or offers this product.
Other condition
Rules 49/2026 apply to decisions from 1 May 2026; where special task rules exist, they govern their own deadlines, process, forms and amounts, with General Rules applying to gaps.
Other condition
Eligible costs are necessary schedule items specified in the current schedule instructions to achieve the environmental effect; investment work performed by the beneficiary’s own forces is excluded.
Other condition
Eligible expenditure must be incurred after submission; both invoice and payment dates must be after application and supported by invoices and payment confirmations.
Other condition
For directions without a set intake deadline or competition, applications are accepted throughout the year; tasks under this procedure completed before filing are not financed. This does not verify portal acceptance or remaining funds for the route.
Other condition
The page labels the intake continuous; live availability and remaining allocation are not verified.
Other condition
The page lists loan, grant and transfer forms. This does not establish a numeric rate, cap, or automatic combination.
Other condition
The 2027 priorities list identifies NZ 1.1 as creating conditions to prevent major accidents. This classifies a planned priority only; it does not set a current intake or independently establish eligibility.
Amounts and costs10
Funding intensity, maximumgrant for qualifying investment purchases under Table 2 §2.2.2(a)
50 percent of eligible costs

Only eligible investment-purchase costs; conditional mapping subject to effects, Fund capacity and route-specific terms.

Funding intensity, maximumgrant for activity classified under Table 2 §2.2.1(c)
80 percent of eligible costs

Conditional category mapping; subject to task effects, Fund capacity and route-specific special terms.

Funding intensity, maximumcombined public support for the same task
100 percent of eligible task costs

Bridge-loan exception; route-specific special rules take precedence under §15.

Grace period, maximumordinary loan branch only
18 months after contractual completion

Maximum grace 18 months; bridge loans excluded; exact loan subtype unresolved.

Loan interest, minimumconditional ordinary non-remissible-loan variant
1.5 percent per annum minimum

Variable at 0.40 bill-rediscounter rate; exact route loan subtype unresolved.

Loan interest, minimumconditional ordinary remissible-loan variant
3 percent per annum minimum

Variable at 0.80 bill-rediscounter rate; exact route loan subtype and borrower eligibility unresolved.

Loan interest, minimumordinary remissible loan for an eligible gmina or powiat
2 percent per annum minimum

Applies only to gminy or powiaty eligible for the equalisation part of the general subsidy in the year of loan application; variable rate is 0.50 s.r.w., with a 2% floor. Route-specific borrower and loan subtype eligibility remain unresolved.

Loan principal, maximum shareordinary-loan branch only; distinct from grant/transfer options
100 percent of eligible costs

Route loan subtype unresolved; excludes bridge loan; subject to effects and Fund capacity.

Loan term, maximumordinary loan branch only
240 months maximum repayment period including grace

Maximum 240 months; route subtype unresolved; bridge loans excluded.

Loan term, minimumordinary loan branch only
48 months minimum repayment period including grace

Minimum 48 months; route subtype unresolved; bridge loans excluded.

Source documents3
Call facts
Opens
—
Provider
WFOŚiGW Katowice
Checked
24 Oct 2026
Review status
Partial review
Independent QA
No published hold
Reviewed
23 Oct 2026

This is a summary of the source page, not the official text. Eligibility, conditions and the submission system are at the source.