scindu funding
All calls

Program Priorytetowy „Czyste Powietrze” — ścieżka dotacji

Program Priorytetowy Czyste Powietrze · National call

czyste-powietrze-direct-grant-current

Summary

Not an R&D call a Polish company can use, by Scindu's rule.

Funds heating replacement and energy efficiency improvements for eligible individual owners or co-owners of single-family homes or separately titled units.

Who can apply
Companies cannot apply: individual.
Amount
Budget not stated
Deadline
No deadline
Status
Openopened 31 Mar 2025
Open the official pageRegister to keep this call

Machine-classified from the call text; check eligibility at the source.

Description

The description is on the provider's page.

Who can apply, in detail
Applicant types
Individual
Purpose
Energy, environment, infrastructure
R&D relevance
0 of 3
Poland eligible
Yes
Country limit
Poland
Region
Any
Consortium
Single applicant
Readiness level (TRL)
—
Topics
  • Residential energy efficiency
  • Heating replacement
  • Air pollution reduction

Machine-classified from the call text; check eligibility at the source. 23 Oct 2026

Conditions13

Typed facts extracted from the source documents by Scindu's grant-data review. Each value keeps its own conditions. Unknown means unstated, not zero or unlimited.

Applicant restriction
Highest tier also allows an alternative qualifying-benefit route for listed permanent/periodic/family/care benefits, subject to the prescribed certificate and six consecutive preceding months plus entitlement through application.

The income-threshold route and the benefit route are alternatives; other highest-tier conditions remain.

Applicant restriction
For the highest tier income/benefit route, the eligible building must have a useful heating energy demand index above 140 kWh/(m²·year).

The programme says this index is established in the energy-audit summary document.

Applicant restriction
No funding is provided for a home whose construction permit/design-approval application or building-work notification was filed after 31 December 2020.
Applicant type
Natural person meeting the applicable programme conditions; the core route requires ownership/co-ownership of an eligible single-family home or separately titled unit, subject to the stated ownership-duration rule and exceptions.

Income tier, building, and ownership details must be checked against the full current programme and annexes for an applicant.

Application restriction
The programme rule provides continuous intake but allows suspension if funds from a financing source are exhausted.

This rule is not proof of authenticated live GWD availability or remaining regional funds.

Application restriction
First eligible cost may be incurred no earlier than six months before the application date; costs incurred earlier or before the building was put into use are ineligible.

This project-cost window is not an application opening date.

Eligible project scope
Poprawa jakości powietrza oraz zmniejszenie emisji gazów cieplarnianych poprzez wymianę źródeł ciepła i poprawę efektywności energetycznej budynków mieszkalnych jednorodzinnych1.
Eligible project scope
Eligible home means a structurally independent detached, semi-detached, terraced, or group residential building with at most two dwellings, or one dwelling plus a non-residential unit not exceeding 30% of total floor area; separately titled units are handled under the programme.
Other condition
Only devices, materials, and services listed in current programme Annex 2 are eligible; the annex sets maximum grant amounts and technical minimum requirements by cost category.
Other condition
The WFO Kraków page says the programme change took effect on 20 July 2026; the national notice says these rules apply to applications submitted from that date.
Other condition
Kraków’s intake notice says this intake began 31 March 2025; the July 2026 programme change is an effective date, not a new opening date.
Other condition
The current programme rule describes PLN 10 billion in Modernisation Fund money for grants at national programme level; it does not state a Kraków-specific allocation.

National programme budget only; not a regional pool or per-call award limit.

Ownership duration, minimum
36 month

For the basic-tier rule represented by programme §8.1(1): general ownership/co-ownership minimum is 3 years. §8.1 exceptions: inheritance and acquisitive prescription waive the minimum; purchase of at least 50% waives it to 1 year; purchase from ascendants of at least 50% by life-annuity or gift reduces it to 1 year; merging premises waives it only when applicant owned/co-owned all merged units for at least 3 years and the whole building met the single-family-home definition before merging. Co-ownership requires consent from all other co-owners. The separately-extracted numeric fact represents 36 months for the general basic-tier case. No rule from §§8.2–8.3 is asserted by this fact.

Amounts and costs15
Applicant income, maximum
PLN 135,000

Basic tier; only the beneficiary’s income is counted, not household-per-capita income; other cumulative tier criteria apply.

Applicant income, maximum
PLN 1,300

Highest tier income route; average per-person monthly income, certified by the municipal authority. The alternative qualifying-benefit route, building energy-demand threshold, and business-revenue test are also in §8.3.

Applicant income, maximum
PLN 1,800

Highest tier income route; average per-person monthly income, certified by the municipal authority. The alternative qualifying-benefit route, building energy-demand threshold, and business-revenue test are also in §8.3.

Applicant income, maximum
PLN 2,250

Increased tier; average per-person monthly income, certified by the municipal authority. Full married-household and beneficiary/spouse business-revenue tests also apply.

Applicant income, maximum
PLN 3,150

Increased tier; average per-person monthly income, certified by the municipal authority. Full married-household and beneficiary/spouse business-revenue tests also apply.

Cost item funding, maximum
PLN 110

Maximum grant per square metre of eligible wall-insulation cost for the basic funding level; technical requirements and programme-wide conditions apply.

Cost item funding, maximum
PLN 275

Maximum grant per square metre of eligible wall-insulation cost for the highest funding level; technical requirements and programme-wide conditions apply.

Cost item funding, maximum
PLN 193

Maximum grant per square metre of eligible wall-insulation cost for the increased funding level; technical requirements and programme-wide conditions apply.

Cost item funding, maximum
PLN 528

Maximum grant per square metre of eligible window replacement cost for the basic funding level; replacement is limited to heated rooms and technical requirements apply.

Cost item funding, maximum
PLN 1,320

Maximum grant per square metre of eligible window replacement cost for the highest funding level; replacement is limited to heated rooms and technical requirements apply.

Cost item funding, maximum
PLN 924

Maximum grant per square metre of eligible window replacement cost for the increased funding level; replacement is limited to heated rooms and technical requirements apply.

Funding intensity
40 %

Rate for eligible costs only, for the basic tier; level eligibility criteria apply.

Funding intensity
100 %

Rate for eligible costs only, for the highest tier; level eligibility criteria apply.

Funding intensity
70 %

Rate for eligible costs only, for the increased tier; level eligibility criteria apply.

Ineligible cost
Podatek od towarów i usług (VAT) jest kosztem niekwalifikowanym.
Source documents5
Call facts
Opens
31 Mar 2025
Provider
Program Priorytetowy Czyste Powietrze
Checked
24 Oct 2026
Review status
Partial review
Independent QA
No published hold
Reviewed
23 Oct 2026

This is a summary of the source page, not the official text. Eligibility, conditions and the submission system are at the source.