EKOkredyty BOŚ Bank we współpracy z WFOŚiGW w Opolu
WFOŚiGW Opole · National call
Summary
Not an R&D call a Polish company can use, by Scindu's rule.
Offers environmental loans through BOŚ Bank in cooperation with WFOŚiGW Opole; eligible applicants and investment conditions are unspecified.
- Who can apply
- Unclear from the source.
- Amount
- Budget not stated
- Deadline
- No deadline
- Status
- Open
Machine-classified from the call text; check eligibility at the source.
Description
The description is on the provider's page.
Who can apply, in detail
- Purpose
- Deployment and investment
- R&D relevance
- 0 of 3
- Poland eligible
- Yes
- Country limit
- Poland, Opole Voivodeship
- Region
- opolskie
- Consortium
- Unclear
- Readiness level (TRL)
- —
- Topics
- Environmental investment
- Green financing
Machine-classified from the call text; check eligibility at the source. 23 Oct 2026
Conditions
Typed facts extracted from the source documents by Scindu's grant-data review. Each value keeps its own conditions. Unknown means unstated, not zero or unlimited.
- Applicant typeEnergy branch
- Natural persons not using financing for business activity, farms, cooperatives and housing communities.
- Eligible project scopeEnergy branch; actual project types subject to complete DOM terms
- Energy efficiency, emissions-reduction and renewable-energy investments, including heat sources, energy systems/storage, measurement/control systems, thermal renovation and specified connections.
- Eligible project scopeWater-sewage branch
- The BOŚ water/sewage branch includes sewer/water connections, small treatment plants up to 100 m³/day, and rainwater/greywater management systems. The current Fund route page also expressly lists rainwater/greywater systems.
Both retained official sources describe rainwater/greywater management within this partner route. Applicable technical limits and borrower conditions remain branch-specific; no individual project eligibility is inferred.
- Other conditionBOŚ Opolskie energy branch, heat-source equipment including the listed hybrid/cogeneration options.
- Eligible heat-source equipment must comply with EU, national and local law effective on the date the credit is awarded.
The source anchors applicable law to credit award. No particular device, borrower, location-specific anti-smog compliance or award date is established by this review.
- Other conditionEnergy branch; specified exceptions
- Central-heating and hot-water modernization is fundable only with purchase and installation of a heat source; new-build heat sources, installations and thermal insulation are excluded, except renewables, energy storage and energy management systems.
- Other conditionCurrent WFOŚiGW Opole / BOŚ route
- The current WFOŚiGW Opole route page states “Nabór ciągły” (continuous intake) for the BOŚ preferential-credit route.
Does not establish current remaining Fund or Bank allocation, application availability, or borrower approval.
- Project duration, maximumEnergy branch task implementation deadline
- 12 months from credit availability
Numeric ceiling/term as stated for the scoped borrower and credit branch.
- Technical requirement, maximumEnergy branch: boilers/devices for central heating and domestic hot water
- 250 kW combined rated power
Combined output cap for listed boilers/devices.
- Technical requirement, maximumEnergy branch renewable energy installations/equipment
- 200 kW combined installed power
Combined output cap for renewable-energy devices and installations.
- Technical requirement, maximumWater-sewage branch small wastewater treatment facilities
- 100 m³/day treatment capacity
Numeric ceiling/term as stated for the scoped borrower and credit branch.
Amounts and costs
- Ineligible costBOŚ Opolskie energy branch; thermal renovation costs.
- Roof coverings during thermal renovation cannot be financed, except thermal-insulation materials such as styropapa.
The exception is for thermal-insulation materials, not a general permission for roof coverings. Necessary building, installation/dismantling, material/equipment and other works remain fundable only within the listed eligible undertakings and other branch conditions.
- Grace period, maximumEnergy branch
- 6 months from completion of task
Numeric ceiling/term as stated for the scoped borrower and credit branch.
- Loan interest, minimumEnergy branch
- 3.5 percent per year
The 3.5% is a floor, not the full variable formula; exact rate derives from 0.5 × NBP bill rediscount rate.
- Loan principal, maximumEnergy branch maximum; independently also limited to 90% task value
- PLN 200,000
VAT may be included only if it is a borrower cost.
- Loan principal, maximumWater-sewage branch maximum; independently also limited to 90% task value
- PLN 100,000
Numeric ceiling/term as stated for the scoped borrower and credit branch.
- Loan principal, maximum shareEnergy branch
- 90 percent of task value
VAT may be included only if it is a cost of the borrower; hard maximum also PLN200,000.
- Loan principal, maximum shareWater-sewage branch
- 90 percent of task value
Hard maximum also PLN100,000; VAT included only if it is a borrower cost.
- Loan term, maximumEnergy branch
- 96 months after completion of task
Maximum period runs from task completion.
- Loan term, maximumWater-sewage branch
- 96 months after completion of task
Numeric ceiling/term as stated for the scoped borrower and credit branch.
Source documents
Call facts
- Opens
- —
- Provider
- WFOŚiGW Opole
- Source
- wfosigw.opole.pl
- Checked
- 24 Oct 2026
- Review status
- Partial review
- Independent QA
- No published hold
- Reviewed
- 23 Oct 2026
This is a summary of the source page, not the official text. Eligibility, conditions and the submission system are at the source.