scindu funding
All calls

EKOkredyty BOŚ Bank we współpracy z WFOŚiGW w Opolu

WFOŚiGW Opole · National call

kredyt-preferencyjny

Summary

Not an R&D call a Polish company can use, by Scindu's rule.

Offers environmental loans through BOŚ Bank in cooperation with WFOŚiGW Opole; eligible applicants and investment conditions are unspecified.

Who can apply
Unclear from the source.
Amount
Budget not stated
Deadline
No deadline
Status
Open
Open the official pageRegister to keep this call

Machine-classified from the call text; check eligibility at the source.

Description

The description is on the provider's page.

Who can apply, in detail
Purpose
Deployment and investment
R&D relevance
0 of 3
Poland eligible
Yes
Country limit
Poland, Opole Voivodeship
Region
opolskie
Consortium
Unclear
Readiness level (TRL)
—
Topics
  • Environmental investment
  • Green financing

Machine-classified from the call text; check eligibility at the source. 23 Oct 2026

Conditions10

Typed facts extracted from the source documents by Scindu's grant-data review. Each value keeps its own conditions. Unknown means unstated, not zero or unlimited.

Applicant typeEnergy branch
Natural persons not using financing for business activity, farms, cooperatives and housing communities.
Eligible project scopeEnergy branch; actual project types subject to complete DOM terms
Energy efficiency, emissions-reduction and renewable-energy investments, including heat sources, energy systems/storage, measurement/control systems, thermal renovation and specified connections.
Eligible project scopeWater-sewage branch
The BOŚ water/sewage branch includes sewer/water connections, small treatment plants up to 100 m³/day, and rainwater/greywater management systems. The current Fund route page also expressly lists rainwater/greywater systems.

Both retained official sources describe rainwater/greywater management within this partner route. Applicable technical limits and borrower conditions remain branch-specific; no individual project eligibility is inferred.

Other conditionBOŚ Opolskie energy branch, heat-source equipment including the listed hybrid/cogeneration options.
Eligible heat-source equipment must comply with EU, national and local law effective on the date the credit is awarded.

The source anchors applicable law to credit award. No particular device, borrower, location-specific anti-smog compliance or award date is established by this review.

Other conditionEnergy branch; specified exceptions
Central-heating and hot-water modernization is fundable only with purchase and installation of a heat source; new-build heat sources, installations and thermal insulation are excluded, except renewables, energy storage and energy management systems.
Other conditionCurrent WFOŚiGW Opole / BOŚ route
The current WFOŚiGW Opole route page states “Nabór ciągły” (continuous intake) for the BOŚ preferential-credit route.

Does not establish current remaining Fund or Bank allocation, application availability, or borrower approval.

Project duration, maximumEnergy branch task implementation deadline
12 months from credit availability

Numeric ceiling/term as stated for the scoped borrower and credit branch.

Technical requirement, maximumEnergy branch: boilers/devices for central heating and domestic hot water
250 kW combined rated power

Combined output cap for listed boilers/devices.

Technical requirement, maximumEnergy branch renewable energy installations/equipment
200 kW combined installed power

Combined output cap for renewable-energy devices and installations.

Technical requirement, maximumWater-sewage branch small wastewater treatment facilities
100 m³/day treatment capacity

Numeric ceiling/term as stated for the scoped borrower and credit branch.

Amounts and costs9
Ineligible costBOŚ Opolskie energy branch; thermal renovation costs.
Roof coverings during thermal renovation cannot be financed, except thermal-insulation materials such as styropapa.

The exception is for thermal-insulation materials, not a general permission for roof coverings. Necessary building, installation/dismantling, material/equipment and other works remain fundable only within the listed eligible undertakings and other branch conditions.

Grace period, maximumEnergy branch
6 months from completion of task

Numeric ceiling/term as stated for the scoped borrower and credit branch.

Loan interest, minimumEnergy branch
3.5 percent per year

The 3.5% is a floor, not the full variable formula; exact rate derives from 0.5 × NBP bill rediscount rate.

Loan principal, maximumEnergy branch maximum; independently also limited to 90% task value
PLN 200,000

VAT may be included only if it is a borrower cost.

Loan principal, maximumWater-sewage branch maximum; independently also limited to 90% task value
PLN 100,000

Numeric ceiling/term as stated for the scoped borrower and credit branch.

Loan principal, maximum shareEnergy branch
90 percent of task value

VAT may be included only if it is a cost of the borrower; hard maximum also PLN200,000.

Loan principal, maximum shareWater-sewage branch
90 percent of task value

Hard maximum also PLN100,000; VAT included only if it is a borrower cost.

Loan term, maximumEnergy branch
96 months after completion of task

Maximum period runs from task completion.

Loan term, maximumWater-sewage branch
96 months after completion of task

Numeric ceiling/term as stated for the scoped borrower and credit branch.

Source documents2
Call facts
Opens
—
Provider
WFOŚiGW Opole
Checked
24 Oct 2026
Review status
Partial review
Independent QA
No published hold
Reviewed
23 Oct 2026

This is a summary of the source page, not the official text. Eligibility, conditions and the submission system are at the source.