An independent quality check has put this review on hold. The structured terms below are kept as history and are not cleared; read the official documents.

Summary

Not an R&D call a Polish company can use, by Scindu's rule.

Offers support under the Clean Air priority programme through WFOŚiGW Poznań; eligible applicants and specific measures are unspecified.

Who can apply
Unclear from the source.
Amount
Budget not stated
Deadline
No deadline
Status
Open
Open the official pageRegister to keep this call

Machine-classified from the call text; check eligibility at the source.

Description

The description is on the provider's page.

Who can apply, in detail
Purpose
Energy, environment, infrastructure
R&D relevance
0 of 3
Poland eligible
Yes
Country limit
Poland
Region
Any
Consortium
Unclear
Readiness level (TRL)
—
Topics
  • Clean air
  • Environmental protection

Machine-classified from the call text; check eligibility at the source. 23 Oct 2026

Conditions13

Typed facts extracted from the source documents by Scindu's grant-data review. Each value keeps its own conditions. Unknown means unstated, not zero or unlimited.

Applicant restrictionQA hold
For enhanced and highest support, when the applicant or spouse conducts an activity included in the programme definition, annual revenue from each such activity in the calendar year used for the municipal income certificate is limited separately: at enhanced level to 40 times, and at highest level to 12 times, the minimum wage in force in December before the application year. Highest-level test is not applied when the specified qualifying-benefit certificate is submitted. Spouse activity is assessed only if there is no final legal separation at application. The basic-level PLN 135,000 annual ceiling and income-source rules are stated separately.
Applicant restrictionQA hold
A beneficiary cannot receive another basic, enhanced or highest-level grant for a different dwelling where the specified agreement was based on an application submitted on or after 22 April 2024.
Applicant typeQA hold
WFOŚiGW for the property’s voivodeship administers the grant route. The downstream beneficiary is a natural person owning/co-owning an eligible single-family residential building or separately titled dwelling. The national July 20 2026 programme and rules were reviewed in this packet; the underlying programme assigns submissions to the territorially competent WFOŚiGW.
Eligible geographyQA hold
The dwelling/building must be in the province served by the territorially competent WFOŚiGW; this provider record is the WFOŚiGW Poznań route.

The programme routes applications to the WFOŚiGW whose territory includes the residential building or dwelling. This provider page identifies the specific fund route.

Eligible project scopeQA hold
The financed subject is heat-source replacement and energy-efficiency improvement in existing single-family residential buildings or separately titled dwellings in such buildings. Programme §9.2.2 requires an existing/commissioned building or dwelling; costs incurred before it is put into use are excluded.
Other conditionQA hold
Electric heating other than a heat pump is eligible only when the application includes this cost and purchase (invoice or equivalent) and installation are completed by the end of 2026.

Applies specifically to Annex 2 Table 2 row 7 electric heating other than heat pumps; not a general programme deadline.

Other conditionQA hold
At highest support level, the building’s pre-project usable energy demand for heating must exceed 140 kWh/(m²·year). The programme defines type 2 projects for 80–140 kWh/(m²·year) with at least 40% reduction and a post-project ceiling of 80; type 3 begins above 140 and requires at least 40% reduction and a post-project ceiling of 140.
Other conditionQA hold
The reviewed July 20 2026 programme, current cost annex and grant regulations specify household benefit eligibility, eligible renovation goods/works/services, and reimbursement conditions; they do not establish employee headcount, hiring obligations, salary amounts, or a payroll wage rate. The applicant is a natural-person household beneficiary; contractor work is not a beneficiary payroll rule.
Other conditionQA hold
Baseline minimum is 3 years. No minimum tenure applies to acquisition by inheritance or acquisitive prescription; inheritance must be evidenced by a final court ruling or registered certificate of succession unless ownership appears in the land register. The period is reduced to 1 year for purchase of at least 50% of the property, and for acquisition from an ascendant by life-annuity or gift of at least 50%. In the premises-merger exception, no minimum period applies only if the applicant owned all merged premises for at least 3 years and the whole building met the programme single-family definition before merger. Every other co-owner must consent. For a premises created by subdivision, prior ownership of its parent property does not count toward the dwelling’s 3 years; the separate-title entry date applies.
Other conditionQA hold
The programme allows a grant, a grant for partial repayment of bank-loan principal, and a grant with pre-financing; pre-financing is available only at enhanced or highest support level and through programme operators.
Ownership duration, minimumQA hold
36 months

Baseline only: applicant must own/co-own the qualifying single-family building or separately titled dwelling for at least 3 years before application; for a dwelling formed by subdivision, the 3-year period starts from the separate-title entry, not prior ownership of the parent building. Inheritance and other exceptions, including evidence of inheritance, acquisitive prescription, qualifying 50% transfers, premises merger and co-owner consent, are explicitly set out in the linked ownership-tenure-exceptions fact and cited here.

Project duration, maximumQA hold
24 months

For a grant or grant with pre-financing, completion within 24 months from application submission. Do not extend this cap to bank-financed partial-loan repayment without applying its separate programme conditions.

Technical requirement, maximumEnhanced-standard wood gasification boiler emissions for cost eligibility under Annex 2QA hold
20 mg/m³ particulate matter

Maximum particulate-matter emissions threshold; applies to the named enhanced-standard boiler class. It is a technical threshold, not a grant/cost amount.

Amounts and costs79
Applicant revenue as a multiple of the statutory minimum wageMaximum annual revenue from each relevant non-agricultural business of the applicant or spouse, for the enhanced Czyste Powietrze support level; threshold is expressed as a multiple of the statutory monthly minimum wage in force in December before the application year.QA hold
40 multiple

For the calendar year used to establish the average monthly income shown in the municipal income certificate, annual revenue from each relevant business must not exceed 40 times the statutory minimum monthly wage in force in December of the year preceding application. The applicant’s and spouse’s activity is considered; spouse business revenue is tested only where no final legal separation existed on the application date. Programme footnote definition includes non-agricultural registered and unregistered business activity (including rent and occasional rent) and excludes agricultural activity other than special agricultural production departments. This is a revenue threshold, not household income, profit, grant amount, or an absolute PLN threshold; no PLN conversion is made without the applicable wage amount.

Applicant revenue as a multiple of the statutory minimum wageMaximum annual revenue from each relevant non-agricultural business of the applicant or spouse, for the highest Czyste Powietrze support level; threshold is expressed as a multiple of the statutory monthly minimum wage in force in December before the application year.QA hold
12 multiple

For the calendar year used to establish the average monthly income shown in the municipal income certificate, annual revenue from each relevant business must not exceed 12 times the statutory minimum monthly wage in force in December of the year preceding application. The applicant’s and spouse’s activity is considered; spouse business revenue is tested only where no final legal separation existed on the application date. The revenue condition is not examined when the required certificate establishes entitlement to a permanent, periodic, family, or special-care allowance. Programme footnote definition includes non-agricultural registered and unregistered business activity (including rent and occasional rent) and excludes agricultural activity other than special agricultural production departments. This is a revenue threshold, not household income, profit, grant amount, or an absolute PLN threshold; no PLN conversion is made without the applicable wage amount.

Applicant income, maximumQA hold
PLN 135,000

Basic support level. Only the applicant’s annual income is counted, not household per-capita income; eligible income may come from the listed taxable, lump-sum, agricultural, or specified non-taxable sources.

Applicant income, maximumQA hold
PLN 2,250

Enhanced-level municipal-certificate route: average monthly income per household member; threshold depends on one-person versus multi-person household. For a married applicant without court-ordered separation, the programme treats the spouses as one shared household; a one-person household cannot be claimed.

Applicant income, maximumQA hold
PLN 3,150

Enhanced-level municipal-certificate route: average monthly income per household member; threshold depends on one-person versus multi-person household. For a married applicant without court-ordered separation, the programme treats the spouses as one shared household; a one-person household cannot be claimed.

Applicant income, maximumQA hold
PLN 1,300

Highest-level municipal-certificate route only: average monthly income per household member; threshold depends on one-person versus multi-person household. A separate qualifying-benefit certificate is an alternative route and is not represented by this numeric threshold. For married applicants without court-ordered separation, spouses are treated as one shared household.

Applicant income, maximumQA hold
PLN 1,800

Highest-level municipal-certificate route only: average monthly income per household member; threshold depends on one-person versus multi-person household. A separate qualifying-benefit certificate is an alternative route and is not represented by this numeric threshold. For married applicants without court-ordered separation, spouses are treated as one shared household.

Call allocationNational programme grant envelopeQA hold
PLN 10,000,000,000

National Czyste Powietrze programme allocation for grants financed from the Modernisation Fund; this is a programme-wide allocation, not a Białystok regional allocation, project cap or current available balance.

Cost item funding, maximumTable 1 row 1 — energy audit and summary document; basic grant tierQA hold
PLN 480

Annex 2 maximum grant for Table 1 row 1 — energy audit and summary document; basic grant tier. PLN per dwelling cost item. Tier reimbursement intensity is separately capped at 40% of eligible cost. These are cost-category caps, not regional allocation.

Cost item funding, maximumTable 1 row 1 — energy audit and summary document; enhanced grant tierQA hold
PLN 840

Annex 2 maximum grant for Table 1 row 1 — energy audit and summary document; enhanced grant tier. PLN per dwelling cost item. Tier reimbursement intensity is separately capped at 70% of eligible cost. These are cost-category caps, not regional allocation.

Cost item funding, maximumTable 1 row 1 — energy audit and summary document; highest grant tierQA hold
PLN 1,200

Annex 2 maximum grant for Table 1 row 1 — energy audit and summary document; highest grant tier. PLN per dwelling cost item. Tier reimbursement intensity is separately capped at 100% of eligible cost. These are cost-category caps, not regional allocation.

Cost item funding, maximumTable 1 row 2 — energy performance certificate; basic grant tierQA hold
PLN 160

Annex 2 maximum grant for Table 1 row 2 — energy performance certificate; basic grant tier. PLN per dwelling cost item. Tier reimbursement intensity is separately capped at 40% of eligible cost. These are cost-category caps, not regional allocation.

Cost item funding, maximumTable 1 row 2 — energy performance certificate; enhanced grant tierQA hold
PLN 280

Annex 2 maximum grant for Table 1 row 2 — energy performance certificate; enhanced grant tier. PLN per dwelling cost item. Tier reimbursement intensity is separately capped at 70% of eligible cost. These are cost-category caps, not regional allocation.

Cost item funding, maximumTable 1 row 2 — energy performance certificate; highest grant tierQA hold
PLN 400

Annex 2 maximum grant for Table 1 row 2 — energy performance certificate; highest grant tier. PLN per dwelling cost item. Tier reimbursement intensity is separately capped at 100% of eligible cost. These are cost-category caps, not regional allocation.

Cost item funding, maximumTable 2 row 3 — air/air heat pump; basic grant tierQA hold
PLN 4,480

Annex 2 maximum grant for Table 2 row 3 — air/air heat pump; basic grant tier. PLN per dwelling cost item. Tier reimbursement intensity is separately capped at 40% of eligible cost. These are cost-category caps, not regional allocation.

Cost item funding, maximumTable 2 row 3 — air/air heat pump; enhanced grant tierQA hold
PLN 7,840

Annex 2 maximum grant for Table 2 row 3 — air/air heat pump; enhanced grant tier. PLN per dwelling cost item. Tier reimbursement intensity is separately capped at 70% of eligible cost. These are cost-category caps, not regional allocation.

Cost item funding, maximumTable 2 row 3 — air/air heat pump; highest grant tierQA hold
PLN 11,200

Annex 2 maximum grant for Table 2 row 3 — air/air heat pump; highest grant tier. PLN per dwelling cost item. Tier reimbursement intensity is separately capped at 100% of eligible cost. These are cost-category caps, not regional allocation.

Cost item funding, maximumTable 2 row 2 — air/water heat pump, enhanced energy class; basic grant tierQA hold
PLN 14,080

Annex 2 maximum grant for Table 2 row 2 — air/water heat pump, enhanced energy class; basic grant tier. PLN per dwelling cost item. Tier reimbursement intensity is separately capped at 40% of eligible cost. These are cost-category caps, not regional allocation.

Cost item funding, maximumTable 2 row 2 — air/water heat pump, enhanced energy class; enhanced grant tierQA hold
PLN 24,640

Annex 2 maximum grant for Table 2 row 2 — air/water heat pump, enhanced energy class; enhanced grant tier. PLN per dwelling cost item. Tier reimbursement intensity is separately capped at 70% of eligible cost. These are cost-category caps, not regional allocation.

Cost item funding, maximumTable 2 row 2 — air/water heat pump, enhanced energy class; highest grant tierQA hold
PLN 35,200

Annex 2 maximum grant for Table 2 row 2 — air/water heat pump, enhanced energy class; highest grant tier. PLN per dwelling cost item. Tier reimbursement intensity is separately capped at 100% of eligible cost. These are cost-category caps, not regional allocation.

Cost item funding, maximumTable 2 row 8a — necessary auxiliary works for central heating/DHW installation; basic grant tierQA hold
PLN 820

Annex 2 maximum grant for Table 2 row 8a — necessary auxiliary works for central heating/DHW installation; basic grant tier. PLN per dwelling cost item. Tier reimbursement intensity is separately capped at 40% of eligible cost. These are cost-category caps, not regional allocation. This is an auxiliary-works cap; grant may not exceed 10% of grant calculated on eligible costs in Table 2 row 8.

Cost item funding, maximumTable 2 row 8a — necessary auxiliary works for central heating/DHW installation; enhanced grant tierQA hold
PLN 1,435

Annex 2 maximum grant for Table 2 row 8a — necessary auxiliary works for central heating/DHW installation; enhanced grant tier. PLN per dwelling cost item. Tier reimbursement intensity is separately capped at 70% of eligible cost. These are cost-category caps, not regional allocation. This is an auxiliary-works cap; grant may not exceed 10% of grant calculated on eligible costs in Table 2 row 8.

Cost item funding, maximumTable 2 row 8a — necessary auxiliary works for central heating/DHW installation; highest grant tierQA hold
PLN 2,050

Annex 2 maximum grant for Table 2 row 8a — necessary auxiliary works for central heating/DHW installation; highest grant tier. PLN per dwelling cost item. Tier reimbursement intensity is separately capped at 100% of eligible cost. These are cost-category caps, not regional allocation. This is an auxiliary-works cap; grant may not exceed 10% of grant calculated on eligible costs in Table 2 row 8.

Cost item funding, maximumTable 2 row 1 — district heating connection and node; basic grant tierQA hold
PLN 8,900

Annex 2 maximum grant for Table 2 row 1 — district heating connection and node; basic grant tier. PLN per dwelling cost item. Tier reimbursement intensity is separately capped at 40% of eligible cost. These are cost-category caps, not regional allocation.

Cost item funding, maximumTable 2 row 1 — district heating connection and node; enhanced grant tierQA hold
PLN 15,575

Annex 2 maximum grant for Table 2 row 1 — district heating connection and node; enhanced grant tier. PLN per dwelling cost item. Tier reimbursement intensity is separately capped at 70% of eligible cost. These are cost-category caps, not regional allocation.

Cost item funding, maximumTable 2 row 1 — district heating connection and node; highest grant tierQA hold
PLN 22,250

Annex 2 maximum grant for Table 2 row 1 — district heating connection and node; highest grant tier. PLN per dwelling cost item. Tier reimbursement intensity is separately capped at 100% of eligible cost. These are cost-category caps, not regional allocation.

Cost item funding, maximumTable 2 row 7 — electric heating other than heat pump; basic grant tierQA hold
PLN 4,480

Annex 2 maximum grant for Table 2 row 7 — electric heating other than heat pump; basic grant tier. PLN per dwelling cost item. Tier reimbursement intensity is separately capped at 40% of eligible cost. These are cost-category caps, not regional allocation.

Cost item funding, maximumTable 2 row 7 — electric heating other than heat pump; enhanced grant tierQA hold
PLN 7,840

Annex 2 maximum grant for Table 2 row 7 — electric heating other than heat pump; enhanced grant tier. PLN per dwelling cost item. Tier reimbursement intensity is separately capped at 70% of eligible cost. These are cost-category caps, not regional allocation.

Cost item funding, maximumTable 2 row 7 — electric heating other than heat pump; highest grant tierQA hold
PLN 11,200

Annex 2 maximum grant for Table 2 row 7 — electric heating other than heat pump; highest grant tier. PLN per dwelling cost item. Tier reimbursement intensity is separately capped at 100% of eligible cost. These are cost-category caps, not regional allocation.

Cost item funding, maximumTable 2 row 4 — ground-source heat pump, enhanced energy class; basic grant tierQA hold
PLN 18,000

Annex 2 maximum grant for Table 2 row 4 — ground-source heat pump, enhanced energy class; basic grant tier. PLN per dwelling cost item. Tier reimbursement intensity is separately capped at 40% of eligible cost. These are cost-category caps, not regional allocation.

Cost item funding, maximumTable 2 row 4 — ground-source heat pump, enhanced energy class; enhanced grant tierQA hold
PLN 31,500

Annex 2 maximum grant for Table 2 row 4 — ground-source heat pump, enhanced energy class; enhanced grant tier. PLN per dwelling cost item. Tier reimbursement intensity is separately capped at 70% of eligible cost. These are cost-category caps, not regional allocation.

Cost item funding, maximumTable 2 row 4 — ground-source heat pump, enhanced energy class; highest grant tierQA hold
PLN 45,000

Annex 2 maximum grant for Table 2 row 4 — ground-source heat pump, enhanced energy class; highest grant tier. PLN per dwelling cost item. Tier reimbursement intensity is separately capped at 100% of eligible cost. These are cost-category caps, not regional allocation.

Cost item funding, maximumTable 2 row 4.1 — lower heat source for ground-source heat pump; basic grant tierQA hold
PLN 8,000

Annex 2 maximum grant for Table 2 row 4.1 — lower heat source for ground-source heat pump; basic grant tier. PLN per dwelling cost item. Tier reimbursement intensity is separately capped at 40% of eligible cost. These are cost-category caps, not regional allocation.

Cost item funding, maximumTable 2 row 4.1 — lower heat source for ground-source heat pump; enhanced grant tierQA hold
PLN 14,000

Annex 2 maximum grant for Table 2 row 4.1 — lower heat source for ground-source heat pump; enhanced grant tier. PLN per dwelling cost item. Tier reimbursement intensity is separately capped at 70% of eligible cost. These are cost-category caps, not regional allocation.

Cost item funding, maximumTable 2 row 4.1 — lower heat source for ground-source heat pump; highest grant tierQA hold
PLN 20,000

Annex 2 maximum grant for Table 2 row 4.1 — lower heat source for ground-source heat pump; highest grant tier. PLN per dwelling cost item. Tier reimbursement intensity is separately capped at 100% of eligible cost. These are cost-category caps, not regional allocation.

Cost item funding, maximumTable 2 row 8 — central heating and domestic hot water installation; basic grant tierQA hold
PLN 8,200

Annex 2 maximum grant for Table 2 row 8 — central heating and domestic hot water installation; basic grant tier. PLN per dwelling cost item. Tier reimbursement intensity is separately capped at 40% of eligible cost. These are cost-category caps, not regional allocation.

Cost item funding, maximumTable 2 row 8 — central heating and domestic hot water installation; enhanced grant tierQA hold
PLN 14,350

Annex 2 maximum grant for Table 2 row 8 — central heating and domestic hot water installation; enhanced grant tier. PLN per dwelling cost item. Tier reimbursement intensity is separately capped at 70% of eligible cost. These are cost-category caps, not regional allocation.

Cost item funding, maximumTable 2 row 8 — central heating and domestic hot water installation; highest grant tierQA hold
PLN 20,500

Annex 2 maximum grant for Table 2 row 8 — central heating and domestic hot water installation; highest grant tier. PLN per dwelling cost item. Tier reimbursement intensity is separately capped at 100% of eligible cost. These are cost-category caps, not regional allocation.

Cost item funding, maximumTable 2 row 5 — wood gasification boiler, enhanced standard; basic grant tierQA hold
PLN 8,200

Annex 2 maximum grant for Table 2 row 5 — wood gasification boiler, enhanced standard; basic grant tier. PLN per dwelling cost item. Tier reimbursement intensity is separately capped at 40% of eligible cost. These are cost-category caps, not regional allocation.

Cost item funding, maximumTable 2 row 5 — wood gasification boiler, enhanced standard; enhanced grant tierQA hold
PLN 14,350

Annex 2 maximum grant for Table 2 row 5 — wood gasification boiler, enhanced standard; enhanced grant tier. PLN per dwelling cost item. Tier reimbursement intensity is separately capped at 70% of eligible cost. These are cost-category caps, not regional allocation.

Cost item funding, maximumTable 2 row 5 — wood gasification boiler, enhanced standard; highest grant tierQA hold
PLN 20,500

Annex 2 maximum grant for Table 2 row 5 — wood gasification boiler, enhanced standard; highest grant tier. PLN per dwelling cost item. Tier reimbursement intensity is separately capped at 100% of eligible cost. These are cost-category caps, not regional allocation.

Cost item funding, maximumTable 2 row 6 — wood-pellet boiler, enhanced standard; basic grant tierQA hold
PLN 8,200

Annex 2 maximum grant for Table 2 row 6 — wood-pellet boiler, enhanced standard; basic grant tier. PLN per dwelling cost item. Tier reimbursement intensity is separately capped at 40% of eligible cost. These are cost-category caps, not regional allocation.

Cost item funding, maximumTable 2 row 6 — wood-pellet boiler, enhanced standard; enhanced grant tierQA hold
PLN 14,350

Annex 2 maximum grant for Table 2 row 6 — wood-pellet boiler, enhanced standard; enhanced grant tier. PLN per dwelling cost item. Tier reimbursement intensity is separately capped at 70% of eligible cost. These are cost-category caps, not regional allocation.

Cost item funding, maximumTable 2 row 6 — wood-pellet boiler, enhanced standard; highest grant tierQA hold
PLN 20,500

Annex 2 maximum grant for Table 2 row 6 — wood-pellet boiler, enhanced standard; highest grant tier. PLN per dwelling cost item. Tier reimbursement intensity is separately capped at 100% of eligible cost. These are cost-category caps, not regional allocation.

Cost item funding, maximumTable 3 row 1 — ceiling/attic insulation; basic grant tierQA hold
PLN 88

Annex 2 maximum grant for Table 3 row 1 — ceiling/attic insulation; basic grant tier. PLN per m² eligible cost. Tier reimbursement intensity is separately capped at 40% of eligible cost. These are cost-category caps, not regional allocation.

Cost item funding, maximumTable 3 row 1 — ceiling/attic insulation; enhanced grant tierQA hold
PLN 154

Annex 2 maximum grant for Table 3 row 1 — ceiling/attic insulation; enhanced grant tier. PLN per m² eligible cost. Tier reimbursement intensity is separately capped at 70% of eligible cost. These are cost-category caps, not regional allocation.

Cost item funding, maximumTable 3 row 1 — ceiling/attic insulation; highest grant tierQA hold
PLN 220

Annex 2 maximum grant for Table 3 row 1 — ceiling/attic insulation; highest grant tier. PLN per m² eligible cost. Tier reimbursement intensity is separately capped at 100% of eligible cost. These are cost-category caps, not regional allocation.

Cost item funding, maximumTable 3 row 5 — exterior door joinery; basic grant tierQA hold
PLN 1,100

Annex 2 maximum grant for Table 3 row 5 — exterior door joinery; basic grant tier. PLN per m² eligible cost. Tier reimbursement intensity is separately capped at 40% of eligible cost. These are cost-category caps, not regional allocation.

Cost item funding, maximumTable 3 row 5 — exterior door joinery; enhanced grant tierQA hold
PLN 1,925

Annex 2 maximum grant for Table 3 row 5 — exterior door joinery; enhanced grant tier. PLN per m² eligible cost. Tier reimbursement intensity is separately capped at 70% of eligible cost. These are cost-category caps, not regional allocation.

Cost item funding, maximumTable 3 row 5 — exterior door joinery; highest grant tierQA hold
PLN 2,750

Annex 2 maximum grant for Table 3 row 5 — exterior door joinery; highest grant tier. PLN per m² eligible cost. Tier reimbursement intensity is separately capped at 100% of eligible cost. These are cost-category caps, not regional allocation.

Cost item funding, maximumTable 3 row 2 — floor insulation; basic grant tierQA hold
PLN 66

Annex 2 maximum grant for Table 3 row 2 — floor insulation; basic grant tier. PLN per m² eligible cost. Tier reimbursement intensity is separately capped at 40% of eligible cost. These are cost-category caps, not regional allocation.

Cost item funding, maximumTable 3 row 2 — floor insulation; enhanced grant tierQA hold
PLN 116

Annex 2 maximum grant for Table 3 row 2 — floor insulation; enhanced grant tier. PLN per m² eligible cost. Tier reimbursement intensity is separately capped at 70% of eligible cost. These are cost-category caps, not regional allocation.

Cost item funding, maximumTable 3 row 2 — floor insulation; highest grant tierQA hold
PLN 165

Annex 2 maximum grant for Table 3 row 2 — floor insulation; highest grant tier. PLN per m² eligible cost. Tier reimbursement intensity is separately capped at 100% of eligible cost. These are cost-category caps, not regional allocation.

Cost item funding, maximumTable 3 row 6 — garage gates; basic grant tierQA hold
PLN 660

Annex 2 maximum grant for Table 3 row 6 — garage gates; basic grant tier. PLN per m² eligible cost. Tier reimbursement intensity is separately capped at 40% of eligible cost. These are cost-category caps, not regional allocation.

Cost item funding, maximumTable 3 row 6 — garage gates; enhanced grant tierQA hold
PLN 1,155

Annex 2 maximum grant for Table 3 row 6 — garage gates; enhanced grant tier. PLN per m² eligible cost. Tier reimbursement intensity is separately capped at 70% of eligible cost. These are cost-category caps, not regional allocation.

Cost item funding, maximumTable 3 row 6 — garage gates; highest grant tierQA hold
PLN 1,650

Annex 2 maximum grant for Table 3 row 6 — garage gates; highest grant tier. PLN per m² eligible cost. Tier reimbursement intensity is separately capped at 100% of eligible cost. These are cost-category caps, not regional allocation.

Cost item funding, maximumTable 3 row 7 — heat-recovery mechanical ventilation; basic grant tierQA hold
PLN 6,680

Annex 2 maximum grant for Table 3 row 7 — heat-recovery mechanical ventilation; basic grant tier. PLN per set; wall recuperator subcap PLN per unit. Tier reimbursement intensity is separately capped at 40% of eligible cost. These are cost-category caps, not regional allocation. Includes an additional maximum 800/1,400/2,000 PLN per wall recuperator unit for the respective tier; these subcaps are separately recorded below.

Cost item funding, maximumTable 3 row 7 — heat-recovery mechanical ventilation; enhanced grant tierQA hold
PLN 11,690

Annex 2 maximum grant for Table 3 row 7 — heat-recovery mechanical ventilation; enhanced grant tier. PLN per set; wall recuperator subcap PLN per unit. Tier reimbursement intensity is separately capped at 70% of eligible cost. These are cost-category caps, not regional allocation. Includes an additional maximum 800/1,400/2,000 PLN per wall recuperator unit for the respective tier; these subcaps are separately recorded below.

Cost item funding, maximumTable 3 row 7 — heat-recovery mechanical ventilation; highest grant tierQA hold
PLN 16,700

Annex 2 maximum grant for Table 3 row 7 — heat-recovery mechanical ventilation; highest grant tier. PLN per set; wall recuperator subcap PLN per unit. Tier reimbursement intensity is separately capped at 100% of eligible cost. These are cost-category caps, not regional allocation. Includes an additional maximum 800/1,400/2,000 PLN per wall recuperator unit for the respective tier; these subcaps are separately recorded below.

Cost item funding, maximumTable 3 row 8 — aggregate cap for all Table 3 categories in project type 2; basic grant tierQA hold
PLN 19,200

Table 3 row 8 — aggregate cap for all Table 3 categories in project type 2; basic tier aggregate amount applies only across the specified Table 3 categories and only for the listed project type. It is not a total award cap across all Annex 2 tables.

Cost item funding, maximumTable 3 row 8 — aggregate cap for all Table 3 categories in project type 2; enhanced grant tierQA hold
PLN 33,600

Table 3 row 8 — aggregate cap for all Table 3 categories in project type 2; enhanced tier aggregate amount applies only across the specified Table 3 categories and only for the listed project type. It is not a total award cap across all Annex 2 tables.

Cost item funding, maximumTable 3 row 9 — aggregate cap for all Table 3 categories in project type 3; basic grant tierQA hold
PLN 33,200

Table 3 row 9 — aggregate cap for all Table 3 categories in project type 3; basic tier aggregate amount applies only across the specified Table 3 categories and only for the listed project type. It is not a total award cap across all Annex 2 tables.

Cost item funding, maximumTable 3 row 9 — aggregate cap for all Table 3 categories in project type 3; enhanced grant tierQA hold
PLN 58,100

Table 3 row 9 — aggregate cap for all Table 3 categories in project type 3; enhanced tier aggregate amount applies only across the specified Table 3 categories and only for the listed project type. It is not a total award cap across all Annex 2 tables.

Cost item funding, maximumTable 3 row 9 — aggregate cap for all Table 3 categories in project type 3; highest grant tierQA hold
PLN 83,000

Table 3 row 9 — aggregate cap for all Table 3 categories in project type 3; highest tier aggregate amount applies only across the specified Table 3 categories and only for the listed project type. It is not a total award cap across all Annex 2 tables.

Cost item funding, maximumTable 3 row 3 — wall insulation; basic grant tierQA hold
PLN 110

Annex 2 maximum grant for Table 3 row 3 — wall insulation; basic grant tier. PLN per m² eligible cost. Tier reimbursement intensity is separately capped at 40% of eligible cost. These are cost-category caps, not regional allocation.

Cost item funding, maximumTable 3 row 3 — wall insulation; enhanced grant tierQA hold
PLN 193

Annex 2 maximum grant for Table 3 row 3 — wall insulation; enhanced grant tier. PLN per m² eligible cost. Tier reimbursement intensity is separately capped at 70% of eligible cost. These are cost-category caps, not regional allocation.

Cost item funding, maximumTable 3 row 3 — wall insulation; highest grant tierQA hold
PLN 275

Annex 2 maximum grant for Table 3 row 3 — wall insulation; highest grant tier. PLN per m² eligible cost. Tier reimbursement intensity is separately capped at 100% of eligible cost. These are cost-category caps, not regional allocation.

Cost item funding, maximumTable 3 row 7 wall recuperator subcap; basic grant tierQA hold
PLN 800

Sub-cap per wall recuperator, included within Table 3 row 7 ventilation set cap; not additive beyond that set cap.

Cost item funding, maximumTable 3 row 7 wall recuperator subcap; enhanced grant tierQA hold
PLN 1,400

Sub-cap per wall recuperator, included within Table 3 row 7 ventilation set cap; not additive beyond that set cap.

Cost item funding, maximumTable 3 row 7 wall recuperator subcap; highest grant tierQA hold
PLN 2,000

Sub-cap per wall recuperator, included within Table 3 row 7 ventilation set cap; not additive beyond that set cap.

Cost item funding, maximumTable 3 row 4a — auxiliary works during window installation; basic grant tierQA hold
PLN 53

Annex 2 maximum grant for Table 3 row 4a — auxiliary works during window installation; basic grant tier. PLN per m² eligible cost; additionally limited to 10% of grant calculated for eligible row 4 costs. Tier reimbursement intensity is separately capped at 40% of eligible cost. These are cost-category caps, not regional allocation. Auxiliary work grant cannot exceed 10% of the grant calculated for eligible row 4 costs.

Cost item funding, maximumTable 3 row 4a — auxiliary works during window installation; enhanced grant tierQA hold
PLN 92

Annex 2 maximum grant for Table 3 row 4a — auxiliary works during window installation; enhanced grant tier. PLN per m² eligible cost; additionally limited to 10% of grant calculated for eligible row 4 costs. Tier reimbursement intensity is separately capped at 70% of eligible cost. These are cost-category caps, not regional allocation. Auxiliary work grant cannot exceed 10% of the grant calculated for eligible row 4 costs.

Cost item funding, maximumTable 3 row 4a — auxiliary works during window installation; highest grant tierQA hold
PLN 132

Annex 2 maximum grant for Table 3 row 4a — auxiliary works during window installation; highest grant tier. PLN per m² eligible cost; additionally limited to 10% of grant calculated for eligible row 4 costs. Tier reimbursement intensity is separately capped at 100% of eligible cost. These are cost-category caps, not regional allocation. Auxiliary work grant cannot exceed 10% of the grant calculated for eligible row 4 costs.

Cost item funding, maximumTable 3 row 4 — window joinery; basic grant tierQA hold
PLN 528

Annex 2 maximum grant for Table 3 row 4 — window joinery; basic grant tier. PLN per m² eligible cost. Tier reimbursement intensity is separately capped at 40% of eligible cost. These are cost-category caps, not regional allocation.

Cost item funding, maximumTable 3 row 4 — window joinery; enhanced grant tierQA hold
PLN 924

Annex 2 maximum grant for Table 3 row 4 — window joinery; enhanced grant tier. PLN per m² eligible cost. Tier reimbursement intensity is separately capped at 70% of eligible cost. These are cost-category caps, not regional allocation.

Cost item funding, maximumTable 3 row 4 — window joinery; highest grant tierQA hold
PLN 1,320

Annex 2 maximum grant for Table 3 row 4 — window joinery; highest grant tier. PLN per m² eligible cost. Tier reimbursement intensity is separately capped at 100% of eligible cost. These are cost-category caps, not regional allocation.

Funding intensity, maximumQA hold
40 eligible costs

Maximum grant intensity for basic level; eligible costs exclude VAT. This rate is not a per-project or programme allocation.

Funding intensity, maximumQA hold
70 eligible costs

Maximum grant intensity for enhanced level; eligible costs exclude VAT. This rate is not a per-project or programme allocation.

Funding intensity, maximumQA hold
100 eligible costs

Maximum grant intensity for highest level; eligible costs exclude VAT. This rate is not a per-project or programme allocation.

Personnel and services2
  • Registered professional service provider signing the energy audit and its summary.QA hold

    Technical staff · Service the grant can fund

    Eligible cost is the energy audit plus programme-form summary, conditional on implementing the scope in the funded application before project completion. This is a reimbursed service, not an employment entitlement; no headcount, FTE or salary is stated.

  • Professional service preparing and signing/registry-numbering the post-works energy performance certificate.QA hold

    Technical staff · Service the grant can fund

    Certificate is prepared after the works specified in the audit-summary document are completed. This is a service requirement, not employment; no headcount, FTE or pay amount is given.

Source documents4
Call facts
Opens
—
Provider
WFOŚiGW Poznań
Checked
24 Oct 2026
Review status
Partial review
Independent QA
On hold
Reviewed
23 Oct 2026

This is a summary of the source page, not the official text. Eligibility, conditions and the submission system are at the source.