scindu funding
All calls

EKO Pożyczka Refundacyjna

WFOŚiGW Szczecin · National call

41

Summary

Not an R&D or investment call a Polish company can use, by Scindu's rule.

Preferential reimbursement loans support individual homeowners undertaking eligible heating, solar, storage, asbestos removal and thermal renovation investments in Zachodniopomorskie.

Who can apply
Companies cannot apply: individual.
Amount
Budget not stated
Deadline
No deadline
Status
Openopened 29 Jan 2026
Open the official pageRegister to keep this call

Machine-classified from the call text; check eligibility at the source.

Description

The description is on the provider's page.

Who can apply, in detail
Applicant types
Individual
Purpose
Energy, environment, infrastructure
R&D relevance
0 of 3
Poland eligible
Yes
Country limit
Zachodniopomorskie Voivodeship, Poland
Region
zachodniopomorskie
Consortium
Single applicant
Readiness level (TRL)
—
Topics
  • Residential thermal renovation
  • Heating and ventilation
  • Solar photovoltaics
  • Energy storage
  • Asbestos removal

Machine-classified from the call text; check eligibility at the source. 24 Oct 2026

Conditions38

Typed facts extracted from the source documents by Scindu's grant-data review. Each value keeps its own conditions. Unknown means unstated, not zero or unlimited.

Applicant type
Where marital community property applies, spouse signature/consent is required.
Applicant type
Natural persons; page describes simplified intake directed to natural persons.
Applicant type
Natural person owning or co-owning a residential house or apartment in a single-family building.
Eligible geography
Investment property must be located in the West Pomeranian Voivodeship.
Eligible project scope
Preferential refunding loans to residents of West Pomerania for listed environmental investments: heat and ventilation, PV/storage, asbestos removal/roof replacement, and building thermal renovation.
Other condition
Total public funding and energy-efficiency aid for the same scope may not exceed 100% of eligible costs.
Other conditionProject durability period
Three-year durability period from project completion.years after project completion
Other conditionLoan documentation retention
Retain documents at least five years after loan repayment, or for any longer period required by law.years after full repayment
Other conditionNegative loan/payment/amendment decision
Negative loan/payment/amendment decision — Request for reconsideration must include reasons; Fund has up to 30 calendar days to respond, extendable with notice; outcome final within programme procedure.calendar days from decision receipt

Request for reconsideration must include reasons; Fund has up to 30 calendar days to respond, extendable with notice; outcome final within programme procedure.

Other conditionApplication corrections
Application corrections — WFOŚiGW may request clarification or supplementation; review clock extends by time for supplement.business days from notice receipt

WFOŚiGW may request clarification or supplementation; review clock extends by time for supplement.

Other condition
Application is generated from the five-step interactive form; attach required documents and submit separately.
Other condition
The generated application is not submitted through the form; submit a signed PDF through the stated delivery channels.
Other conditionBorrower eligibility for this loan product
Eligible borrowers must be no older than 70 on the date the loan obligation is repaid.

The threshold is assessed on the repayment date, not at application or signature, and is distinct from loan maturity length. This clause does not establish a waiver or co-borrower exception.

Other conditionLoan eligibility
Loan eligibility — Positive creditworthiness assessment is required; final collateral forms/value are set by Fund after creditworthiness review.boolean condition

Positive creditworthiness assessment is required; final collateral forms/value are set by Fund after creditworthiness review.

Other conditionDurability
Durability — Maintain project for at least 3 years after completion; Fund may inspect during this period.years from project completion

Maintain project for at least 3 years after completion; Fund may inspect during this period.

Other conditionConditional remission
Conditional remission — Any early repayment removes the right to apply for remission.boolean condition

Any early repayment removes the right to apply for remission.

Other conditionVAT eligibility
VAT eligibility — VAT is eligible only where beneficiary has no legal right to deduct or recover it.boolean condition

VAT is eligible only where beneficiary has no legal right to deduct or recover it.

Other conditionEligible expense boundary
Eligible expense boundary — Only costs and unit/package maxima in Annex 2 are eligible; amounts above the applicable listed ceiling are financed only up to that ceiling. VAT qualifies only if legally non-deductible and non-recoverable.scope-limiting catalogue; not a single amount

Only costs and unit/package maxima in Annex 2 are eligible; amounts above the applicable listed ceiling are financed only up to that ceiling. VAT qualifies only if legally non-deductible and non-recoverable.

Other conditionPre-award expense date
Pre-award expense date — Only costs incurred from application filing date are eligible; projects completed before filing are excluded.boolean condition

Only costs incurred from application filing date are eligible; projects completed before filing are excluded.

Other condition
Income evidence is required according to the applicant’s income source; examples are employment, pension, business, farm and other income documents.
Other conditionLoan application review
Loan application review — Clock extends by time required to supplement; in justified cases applicant has 10 business days from request to clarify/supplement.business days from filing

Clock extends by time required to supplement; in justified cases applicant has 10 business days from request to clarify/supplement.

Other condition
Loan payment is made as reimbursement of incurred costs after completion of a stage or of the whole project.
Other condition
Proof of ownership is conditionally required when the ownership is not visible in the land and mortgage register.
Other conditionDisbursement review
Disbursement review — Incomplete supplementation within requested deadline can cause negative assessment and contract termination.calendar days from request filing

Incomplete supplementation within requested deadline can cause negative assessment and contract termination.

Other conditionCumulative public funding
The application declaration caps aggregate public funding sources for the same project, including this Regulation and support under Energy Efficiency Act Article 15a, at 100% of eligible project costs. This scope is also represented by the distinct typed aggregate-public-funding-ceiling-typed fact; that field is not a loan-principal cap and does not imply a duplicate-cost ban.percent of eligible project costs

The eligible-cost denominator and all-public-sources aggregate scope are typed separately in aggregate-public-funding-ceiling-typed. Do not treat this fact as proposal-only.

Other conditionRecords
Records — Keep all loan/project documents for legally required tax-record period and no less than 5 years after loan repayment.years after loan repayment

Keep all loan/project documents for legally required tax-record period and no less than 5 years after loan repayment.

Other condition
No installment delay longer than 30 days (cumulative over the loan term) is allowed for remission; see exact Regulation and Annex 3.
Other conditionRemission decision
Remission application reviewed within 30 calendar days, subject to supplementation; decision by Fund Board.calendar days from receipt

Decision by Fund Board; deadline extends while supplementing application.

Other conditionLoan disbursement
Loan disbursement — Refund after a completed stage or whole project; payout request and required attachments; maximum three tranches.tranches

Refund after a completed stage or whole project; payout request and required attachments; maximum three tranches.

Other conditionLoan security
Loan security — Blank promissory note required; additional art.777 declaration/mortgage may be required; original collateral evidence before tranche; borrower bears establishment/modification/release cost.boolean condition

Blank promissory note required; additional art.777 declaration/mortgage may be required; original collateral evidence before tranche; borrower bears establishment/modification/release cost.

Other condition
A blank promissory note is the stated baseline proposed security; additional security depends on principal bands and the Fund creditworthiness assessment.
Project duration, maximumProject implementation period
18 months from application

Extension only on justified written addendum.

Project duration, maximumImplementation period
18 months from application filing

Extension by up to 6 months only for justified case, written paid annex; Annex fee PLN400.

Technical requirement, maximumMaximum particulate matter emissions for eligible biomass boiler
20 mg/m³

Applicable to listed wood-gasification or wood-pellet boilers; other applicable Annex 2 technical requirements also apply.

Technical requirement, maximumCommercial-use share of supported building
30 percent of building floor area

More than 30% fails the form condition.

Technical requirement, maximumPV microinstallation
20 kW electrical capacity

Supported PV range is 2–20 kW.

Technical requirement, minimumEnergy storage eligible alongside PV
2 kWh capacity

Minimum capacity; the programme says PV and/or storage.

Technical requirement, minimumPV microinstallation
2 kW electrical capacity

Supported PV range is 2–20 kW; this is the lower edge of that range.

Amounts and costs28
Call allocationStated programme budget
PLN 5,000,000

Page-level budget; current uncommitted balance not verified.

Eligible unit cost, maximumpompa ciepła powietrze/powietrze
PLN 30,000

Maximum eligible amount per listed unit; subject to overall eligible-cost and loan ceilings.

Eligible unit cost, maximumpompa ciepła powietrze/woda
PLN 40,000

Maximum eligible amount per listed unit; subject to overall eligible-cost and loan ceilings.

Eligible unit cost, maximumdemontaż, transport i unieszkodliwienie wyrobów zawierających azbest
PLN 1,000

Maximum eligible amount per listed unit; subject to overall eligible-cost and loan ceilings.

Eligible unit cost, maximumtransport i unieszkodliwienie wyrobów zawierających azbest
PLN 700

Maximum eligible amount per listed unit; subject to overall eligible-cost and loan ceilings.

Eligible unit cost, maximumocieplenie stropów/poddasza
PLN 250

Maximum eligible amount per listed unit; subject to overall eligible-cost and loan ceilings.

Eligible unit cost, maximuminstalacja c.o. i c.w.u.
PLN 20,000

Maximum eligible amount per listed unit; subject to overall eligible-cost and loan ceilings.

Eligible unit cost, maximumdrzwi
PLN 2,500

Maximum eligible amount per listed unit; subject to overall eligible-cost and loan ceilings.

Eligible unit cost, maximumogrzewanie elektryczne
PLN 20,000

Maximum eligible amount per listed unit; subject to overall eligible-cost and loan ceilings.

Eligible unit cost, maximumocieplenie podłóg
PLN 200

Maximum eligible amount per listed unit; subject to overall eligible-cost and loan ceilings.

Eligible unit cost, maximumbramy garażowe
PLN 1,500

Maximum eligible amount per listed unit; subject to overall eligible-cost and loan ceilings.

Eligible unit cost, maximumpompa ciepła gruntowa
PLN 80,000

Maximum eligible amount per listed unit; subject to overall eligible-cost and loan ceilings.

Eligible unit cost, maximummikroinstalacja fotowoltaiczna
PLN 60,000

Maximum eligible amount per listed unit; subject to overall eligible-cost and loan ceilings.

Eligible unit cost, maximumnowe pokrycie dachowe
PLN 350

Maximum eligible amount per listed unit; subject to overall eligible-cost and loan ceilings.

Eligible unit cost, maximummagazyn energii
PLN 32,000

Maximum eligible amount per listed unit; subject to overall eligible-cost and loan ceilings.

Eligible unit cost, maximumwentylacja z odzyskiem ciepła
PLN 16,700

Maximum eligible amount per listed unit; subject to overall eligible-cost and loan ceilings.

Eligible unit cost, maximumocieplenie ścian
PLN 400

Maximum eligible amount per listed unit; subject to overall eligible-cost and loan ceilings.

Eligible unit cost, maximumrekuperator ścienny
PLN 2,000

Maximum eligible amount per listed unit; subject to overall eligible-cost and loan ceilings.

Eligible unit cost, maximumokna
PLN 1,200

Maximum eligible amount per listed unit; subject to overall eligible-cost and loan ceilings.

Funding intensity, maximumAggregate support for the undertaking/project from all public funding sources under this Regulation plus energy-efficiency improvement aid under Article 15a of the Energy Efficiency Act, capped against eligible project costs.
100 percent of eligible project costs

Aggregate cap stated in the application declaration combines all public-source funding under this Regulation with energy-efficiency improvement support under Article 15a of the Energy Efficiency Act; the combined total must not exceed 100% of eligible project costs. This is not the programme loan-principal ratio and does not itself imply a duplicate-cost ban.

Loan interest, fixed rateEKO Refund Loan rate stated on programme page
4.5 percent per year

Page describes low-interest loan at 4.5% per annum; linked loan agreement details not independently reviewed.

Loan partial remission, maximum shareConditional partial remission at end of repayment
10 percent of outstanding loan balance after timely repayment of 90% of principal

Not 10% of original principal. Requires scheduled repayment, no delay over 30 days cumulatively, at least 90% principal repaid and completion on contractual deadline; early repayment removes entitlement; Fund Board decides.

Loan principal, maximumMaximum individual EKO Refund Loan
PLN 150,000

Subject also to 100% of eligible costs; actual credit subject to lender decision.

Loan principal, maximum shareEKO Refund Loan principal ceiling
100 percent of eligible costs specified in Annex 2

Only Annex 2 eligible-cost values; PLN 150,000 absolute loan maximum; creditworthiness and security apply.

Repayment required before remission, minimumMinimum principal repaid before remission consideration
90 percent of loan principal

At least 90% and timely; scheduled instalment and cumulative late-payment constraints and timely project completion also apply.

Loan term, maximumEKO Refund Loan term
120 months from first tranche

Page gives term range of 5 to 10 years from date first tranche is paid.

Loan term, minimumMinimum financing period
60 months

Fixed minimum; 10-year maximum is measured from first tranche and may be changed by creditworthiness review.

Project cost, maximumThermal-modernization eligible costs
PLN 100,000

Separate from equipment unit ceilings.

Source documents9
Call facts
Opens
29 Jan 2026
Provider
WFOŚiGW Szczecin
Checked
24 Oct 2026
Review status
Partial review
Independent QA
No published hold
Reviewed
24 Oct 2026

This is a summary of the source page, not the official text. Eligibility, conditions and the submission system are at the source.