Program Priorytetowy „Czyste Powietrze”
WFOŚiGW Warszawa · National call
Summary
Not an R&D call a Polish company can use, by Scindu's rule.
Funds heating replacement and energy improvements in existing single-family homes for individual owners meeting ownership, income and building requirements.
- Who can apply
- Companies cannot apply: individual.
- Amount
- Budget not stated
- Deadline
- No deadline
- Status
- Open
Machine-classified from the call text; check eligibility at the source.
Description
The description is on the provider's page.
Who can apply, in detail
- Applicant types
- Individual
- Purpose
- Energy, environment, infrastructure
- R&D relevance
- 0 of 3
- Poland eligible
- Yes
- Country limit
- —
- Region
- Any
- Consortium
- Single applicant
- Readiness level (TRL)
- —
- Topics
- Residential energy efficiency
- Heating replacement
- Building insulation
- Ventilation
Machine-classified from the call text; check eligibility at the source. 23 Oct 2026
Conditions
Typed facts extracted from the source documents by Scindu's grant-data review. Each value keeps its own conditions. Unknown means unstated, not zero or unlimited.
- Applicant restriction
- Basic-tier applicant annual income must not exceed PLN 135,000; only the beneficiary’s income is counted, not income per household member. The threshold is only one of the combined basic-tier conditions.
- Applicant restriction
- Enhanced-tier eligibility requires average monthly household income no more than PLN 2,250 per member in a multi-person household or PLN 3,150 for a single-person household, with municipal income certificate and conditions on spouses/business revenue.
- Applicant restriction
- Highest-tier eligibility requires average monthly household income no more than PLN 1,300 per member in multi-person household or PLN 1,800 for single-person household, or qualifying benefits, plus qualifying building-energy indicator and other stated conditions.
- Applicant type
- Natural person who has owned/co-owned for at least three years the single-family residential building or separately title-registered residential unit (with stated legal exceptions); other co-owners must consent.
- Application restriction
- The separate grant-with-prefinancing option is only for enhanced/highest tiers, through a programme operator, against up to three applicant-contractor agreements for services, supplies or construction; total advances are capped at 35% of the awarded grant.
- Application restriction
- Grant applications are continuous. Applications go to the WFOŚiGW for the building location. Programme funding can be suspended when requests reach 100% of the available funding; the Warsaw route is source-listed, not a guarantee that the portal will accept a submission.
- Eligible project scope
- The programme scopes interventions according to pre/post building energy-demand indicators. Examples include replacing a sub-class-5 solid-fuel source, or insulation/windows/doors/ventilation interventions without a source replacement, with the required outcome thresholds evidenced by an energy audit and post-works certificate.
- Eligible project scope
- Measures must concern an existing single-family residential building or separately registered residential unit; work/costs before the building was commissioned are ineligible.
- Other condition
- Annex 2 cost-row maxima are not a universal project cap: Table 1 and Table 2 maxima sum across eligible cost items at the applicable tier; Table 3 has separate aggregate ceilings for intervention types 2 and 3. The type-specific aggregate amounts remain represented by the existing intervention-2/intervention-3 facts.
- Other condition
- This Warsaw route applies the official CP grant and grant-with-prefinancing application rules for applications from 20 July 2026, under the underlying priority programme effective from 31 March 2025. The July date is a version/application-rule effective date, not a newly established first intake date.
- Other condition
- Warsaw’s linked notice identifies the July 2026 amendment/version. The underlying programme itself began 31 March 2025; July 20 is the current-rule effective date, not the first round start.
- Other condition
- The 10 billion PLN figure in the priority programme is a national NFOŚiGW Fundusz Modernizacyjny pool, not a Warsaw regional allocation.
- Other condition
- Annex 2 sets item-specific caps for eligible-cost categories and aggregate Table 3 caps for intervention types 2 and 3. The amounts are not one universal grant ceiling; maximums are per building/unit and depend on tier and selected project type.
- Other condition
- Thermomodernisation tax relief can be combined with CP grant, but expenses funded/refunded by public grant may not be deducted again; the two instruments have different eligible-cost catalogues.
Amounts and costs
- Cost item funding, maximum
- PLN 4,480
Maximum eligible grant for Air-to-air heat pump, at the basic tier only, scoped to this cost row. Purchase/installation with accessories; the eligible unit must be entered on the ZUM list on the invoice date, subject to the Annex footnote for a unit removed after advance-invoice date. Table 1 and Table 2 item ceilings are summed for the relevant eligible costs; this row amount is not a standalone total-project maximum.
- Cost item funding, maximum
- PLN 7,840
Maximum eligible grant for Air-to-air heat pump, at the enhanced tier only, scoped to this cost row. Purchase/installation with accessories; the eligible unit must be entered on the ZUM list on the invoice date, subject to the Annex footnote for a unit removed after advance-invoice date. Table 1 and Table 2 item ceilings are summed for the relevant eligible costs; this row amount is not a standalone total-project maximum.
- Cost item funding, maximum
- PLN 11,200
Maximum eligible grant for Air-to-air heat pump, at the highest tier only, scoped to this cost row. Purchase/installation with accessories; the eligible unit must be entered on the ZUM list on the invoice date, subject to the Annex footnote for a unit removed after advance-invoice date. Table 1 and Table 2 item ceilings are summed for the relevant eligible costs; this row amount is not a standalone total-project maximum.
- Cost item funding, maximum
- PLN 14,080
Maximum eligible grant amount for this one named cost item at the basic tier only; subject to the tier intensity and any programme-specific technology/eligibility conditions in the cited row.
- Cost item funding, maximum
- PLN 24,640
Maximum eligible grant amount for this one named cost item at the enhanced tier only; subject to the tier intensity and any programme-specific technology/eligibility conditions in the cited row.
- Cost item funding, maximum
- PLN 35,200
Maximum eligible grant amount for this one named cost item at the highest tier only; subject to the tier intensity and any programme-specific technology/eligibility conditions in the cited row.
- Cost item funding, maximum
- PLN 88
Maximum eligible grant for Insulation of ceilings/attics, at the basic tier only, scoped to this cost row. Applies to specified internal ceiling boundaries under unheated attics or qualifying roof insulation where the top-floor rooms are heated; qualifying insulation must meet technical-building thermal requirements. Table 3 totals for eligible cost rows are separately bounded by intervention type 2 or 3; this row amount is not a standalone total-project maximum.
- Cost item funding, maximum
- PLN 154
Maximum eligible grant for Insulation of ceilings/attics, at the enhanced tier only, scoped to this cost row. Applies to specified internal ceiling boundaries under unheated attics or qualifying roof insulation where the top-floor rooms are heated; qualifying insulation must meet technical-building thermal requirements. Table 3 totals for eligible cost rows are separately bounded by intervention type 2 or 3; this row amount is not a standalone total-project maximum.
- Cost item funding, maximum
- PLN 220
Maximum eligible grant for Insulation of ceilings/attics, at the highest tier only, scoped to this cost row. Applies to specified internal ceiling boundaries under unheated attics or qualifying roof insulation where the top-floor rooms are heated; qualifying insulation must meet technical-building thermal requirements. Table 3 totals for eligible cost rows are separately bounded by intervention type 2 or 3; this row amount is not a standalone total-project maximum.
- Cost item funding, maximum
- PLN 480
Maximum eligible grant amount for this one named cost item at the basic tier only; subject to the tier intensity and any programme-specific technology/eligibility conditions in the cited row.
- Cost item funding, maximum
- PLN 840
Maximum eligible grant amount for this one named cost item at the enhanced tier only; subject to the tier intensity and any programme-specific technology/eligibility conditions in the cited row.
- Cost item funding, maximum
- PLN 1,200
Maximum eligible grant amount for this one named cost item at the highest tier only; subject to the tier intensity and any programme-specific technology/eligibility conditions in the cited row.
- Cost item funding, maximum
- PLN 820
Maximum eligible grant for Necessary ancillary works at central-heating/DHW installation, at the basic tier only, scoped to this cost row. The grant for these works may not exceed 10% of the grant calculated from eligible row-8 costs; each amount is included in, not additional to, the row-8 maximum. Table 1 and Table 2 item ceilings are summed for the relevant eligible costs; this row amount is not a standalone total-project maximum.
- Cost item funding, maximum
- PLN 1,435
Maximum eligible grant for Necessary ancillary works at central-heating/DHW installation, at the enhanced tier only, scoped to this cost row. The grant for these works may not exceed 10% of the grant calculated from eligible row-8 costs; each amount is included in, not additional to, the row-8 maximum. Table 1 and Table 2 item ceilings are summed for the relevant eligible costs; this row amount is not a standalone total-project maximum.
- Cost item funding, maximum
- PLN 2,050
Maximum eligible grant for Necessary ancillary works at central-heating/DHW installation, at the highest tier only, scoped to this cost row. The grant for these works may not exceed 10% of the grant calculated from eligible row-8 costs; each amount is included in, not additional to, the row-8 maximum. Table 1 and Table 2 item ceilings are summed for the relevant eligible costs; this row amount is not a standalone total-project maximum.
- Cost item funding, maximum
- PLN 8,200
Maximum eligible grant for Central-heating and domestic-hot-water installation, at the basic tier only, scoped to this cost row. Includes eligible system materials/equipment; solar collectors and DHW heat pumps must meet ZUM-list conditions, and non-heat-pump electric water heaters must meet the stated minimum C energy class. Table 1 and Table 2 item ceilings are summed for the relevant eligible costs; this row amount is not a standalone total-project maximum.
- Cost item funding, maximum
- PLN 14,350
Maximum eligible grant for Central-heating and domestic-hot-water installation, at the enhanced tier only, scoped to this cost row. Includes eligible system materials/equipment; solar collectors and DHW heat pumps must meet ZUM-list conditions, and non-heat-pump electric water heaters must meet the stated minimum C energy class. Table 1 and Table 2 item ceilings are summed for the relevant eligible costs; this row amount is not a standalone total-project maximum.
- Cost item funding, maximum
- PLN 20,500
Maximum eligible grant for Central-heating and domestic-hot-water installation, at the highest tier only, scoped to this cost row. Includes eligible system materials/equipment; solar collectors and DHW heat pumps must meet ZUM-list conditions, and non-heat-pump electric water heaters must meet the stated minimum C energy class. Table 1 and Table 2 item ceilings are summed for the relevant eligible costs; this row amount is not a standalone total-project maximum.
- Cost item funding, maximum
- PLN 8,900
Maximum eligible grant for Connection to district heating network, including connection, at the basic tier only, scoped to this cost row. Purchase/installation of a heat node with temperature controller and storage/DHW tank equipment, plus the network-to-node connection and connection fee. Table 1 and Table 2 item ceilings are summed for the relevant eligible costs; this row amount is not a standalone total-project maximum.
- Cost item funding, maximum
- PLN 15,575
Maximum eligible grant for Connection to district heating network, including connection, at the enhanced tier only, scoped to this cost row. Purchase/installation of a heat node with temperature controller and storage/DHW tank equipment, plus the network-to-node connection and connection fee. Table 1 and Table 2 item ceilings are summed for the relevant eligible costs; this row amount is not a standalone total-project maximum.
- Cost item funding, maximum
- PLN 22,250
Maximum eligible grant for Connection to district heating network, including connection, at the highest tier only, scoped to this cost row. Purchase/installation of a heat node with temperature controller and storage/DHW tank equipment, plus the network-to-node connection and connection fee. Table 1 and Table 2 item ceilings are summed for the relevant eligible costs; this row amount is not a standalone total-project maximum.
- Cost item funding, maximum
- PLN 1,100
Maximum eligible grant amount for this one named cost item at the basic tier only; subject to the tier intensity and any programme-specific technology/eligibility conditions in the cited row.
- Cost item funding, maximum
- PLN 1,925
Maximum eligible grant amount for this one named cost item at the enhanced tier only; subject to the tier intensity and any programme-specific technology/eligibility conditions in the cited row.
- Cost item funding, maximum
- PLN 2,750
Maximum eligible grant amount for this one named cost item at the highest tier only; subject to the tier intensity and any programme-specific technology/eligibility conditions in the cited row.
- Cost item funding, maximum
- PLN 4,480
Maximum eligible grant for Electric heating device other than a heat pump, at the basic tier only, scoped to this cost row. The application must include this cost and purchase/invoice and installation must occur by 31 December 2026 under the row footnote. Table 1 and Table 2 item ceilings are summed for the relevant eligible costs; this row amount is not a standalone total-project maximum.
- Cost item funding, maximum
- PLN 7,840
Maximum eligible grant for Electric heating device other than a heat pump, at the enhanced tier only, scoped to this cost row. The application must include this cost and purchase/invoice and installation must occur by 31 December 2026 under the row footnote. Table 1 and Table 2 item ceilings are summed for the relevant eligible costs; this row amount is not a standalone total-project maximum.
- Cost item funding, maximum
- PLN 11,200
Maximum eligible grant for Electric heating device other than a heat pump, at the highest tier only, scoped to this cost row. The application must include this cost and purchase/invoice and installation must occur by 31 December 2026 under the row footnote. Table 1 and Table 2 item ceilings are summed for the relevant eligible costs; this row amount is not a standalone total-project maximum.
- Cost item funding, maximum
- PLN 160
Maximum eligible grant for Energy performance certificate after completion, at the basic tier only, scoped to this cost row. The certificate must be prepared after the works specified in the energy-audit summary and bear a central-register number and authorized-person signature. Table 1 and Table 2 item ceilings are summed for the relevant eligible costs; this row amount is not a standalone total-project maximum.
- Cost item funding, maximum
- PLN 280
Maximum eligible grant for Energy performance certificate after completion, at the enhanced tier only, scoped to this cost row. The certificate must be prepared after the works specified in the energy-audit summary and bear a central-register number and authorized-person signature. Table 1 and Table 2 item ceilings are summed for the relevant eligible costs; this row amount is not a standalone total-project maximum.
- Cost item funding, maximum
- PLN 400
Maximum eligible grant for Energy performance certificate after completion, at the highest tier only, scoped to this cost row. The certificate must be prepared after the works specified in the energy-audit summary and bear a central-register number and authorized-person signature. Table 1 and Table 2 item ceilings are summed for the relevant eligible costs; this row amount is not a standalone total-project maximum.
- Cost item funding, maximum
- PLN 66
Maximum eligible grant for Floor insulation, at the basic tier only, scoped to this cost row. Applies to specified ceilings over unheated rooms/closed underfloor spaces or floors on ground; qualifying insulation must meet technical-building thermal requirements. Table 3 totals for eligible cost rows are separately bounded by intervention type 2 or 3; this row amount is not a standalone total-project maximum.
- Cost item funding, maximum
- PLN 116
Maximum eligible grant for Floor insulation, at the enhanced tier only, scoped to this cost row. Applies to specified ceilings over unheated rooms/closed underfloor spaces or floors on ground; qualifying insulation must meet technical-building thermal requirements. Table 3 totals for eligible cost rows are separately bounded by intervention type 2 or 3; this row amount is not a standalone total-project maximum.
- Cost item funding, maximum
- PLN 165
Maximum eligible grant for Floor insulation, at the highest tier only, scoped to this cost row. Applies to specified ceilings over unheated rooms/closed underfloor spaces or floors on ground; qualifying insulation must meet technical-building thermal requirements. Table 3 totals for eligible cost rows are separately bounded by intervention type 2 or 3; this row amount is not a standalone total-project maximum.
- Cost item funding, maximum
- PLN 660
Maximum eligible grant for Garage doors, at the basic tier only, scoped to this cost row. Purchase/installation and necessary ancillary materials; thermal-transmittance requirements in the Annex apply. Table 3 totals for eligible cost rows are separately bounded by intervention type 2 or 3; this row amount is not a standalone total-project maximum.
- Cost item funding, maximum
- PLN 1,155
Maximum eligible grant for Garage doors, at the enhanced tier only, scoped to this cost row. Purchase/installation and necessary ancillary materials; thermal-transmittance requirements in the Annex apply. Table 3 totals for eligible cost rows are separately bounded by intervention type 2 or 3; this row amount is not a standalone total-project maximum.
- Cost item funding, maximum
- PLN 1,650
Maximum eligible grant for Garage doors, at the highest tier only, scoped to this cost row. Purchase/installation and necessary ancillary materials; thermal-transmittance requirements in the Annex apply. Table 3 totals for eligible cost rows are separately bounded by intervention type 2 or 3; this row amount is not a standalone total-project maximum.
- Cost item funding, maximum
- PLN 8,000
Maximum eligible grant for Ground heat source for ground-source heat pump, at the basic tier only, scoped to this cost row. Purchase/installation of the ground heat source, including ground works necessary for correct installation and operation of the ground-source heat pump. Table 1 and Table 2 item ceilings are summed for the relevant eligible costs; this row amount is not a standalone total-project maximum.
- Cost item funding, maximum
- PLN 14,000
Maximum eligible grant for Ground heat source for ground-source heat pump, at the enhanced tier only, scoped to this cost row. Purchase/installation of the ground heat source, including ground works necessary for correct installation and operation of the ground-source heat pump. Table 1 and Table 2 item ceilings are summed for the relevant eligible costs; this row amount is not a standalone total-project maximum.
- Cost item funding, maximum
- PLN 20,000
Maximum eligible grant for Ground heat source for ground-source heat pump, at the highest tier only, scoped to this cost row. Purchase/installation of the ground heat source, including ground works necessary for correct installation and operation of the ground-source heat pump. Table 1 and Table 2 item ceilings are summed for the relevant eligible costs; this row amount is not a standalone total-project maximum.
- Cost item funding, maximum
- PLN 18,000
Maximum eligible grant amount for this one named cost item at the basic tier only; subject to the tier intensity and any programme-specific technology/eligibility conditions in the cited row.
- Cost item funding, maximum
- PLN 31,500
Maximum eligible grant amount for this one named cost item at the enhanced tier only; subject to the tier intensity and any programme-specific technology/eligibility conditions in the cited row.
- Cost item funding, maximum
- PLN 45,000
Maximum eligible grant amount for this one named cost item at the highest tier only; subject to the tier intensity and any programme-specific technology/eligibility conditions in the cited row.
- Cost item funding, maximum
- PLN 6,680
Maximum eligible grant for Mechanical ventilation with heat recovery, at the basic tier only, scoped to this cost row. Eligible installation materials for a mechanical heat-recovery ventilation system; per-wall recuperator amounts are separately capped below. Minimum class A applies under the technical annex. Table 3 totals for eligible cost rows are separately bounded by intervention type 2 or 3; this row amount is not a standalone total-project maximum.
- Cost item funding, maximum
- PLN 11,690
Maximum eligible grant for Mechanical ventilation with heat recovery, at the enhanced tier only, scoped to this cost row. Eligible installation materials for a mechanical heat-recovery ventilation system; per-wall recuperator amounts are separately capped below. Minimum class A applies under the technical annex. Table 3 totals for eligible cost rows are separately bounded by intervention type 2 or 3; this row amount is not a standalone total-project maximum.
- Cost item funding, maximum
- PLN 16,700
Maximum eligible grant for Mechanical ventilation with heat recovery, at the highest tier only, scoped to this cost row. Eligible installation materials for a mechanical heat-recovery ventilation system; per-wall recuperator amounts are separately capped below. Minimum class A applies under the technical annex. Table 3 totals for eligible cost rows are separately bounded by intervention type 2 or 3; this row amount is not a standalone total-project maximum.
- Cost item funding, maximum
- PLN 19,200
Maximum grant across the complete eligible Table 3 cost basket for intervention type 2 at the 40% intensity tier. This Table 3 aggregate does not cap the separate Table 1 and Table 2 costs.
- Cost item funding, maximum
- PLN 33,600
Maximum grant across the complete eligible Table 3 cost basket for intervention type 2 at the 70% intensity tier. This Table 3 aggregate does not cap the separate Table 1 and Table 2 costs.
- Cost item funding, maximum
- PLN 83,000
Maximum grant across the complete eligible Table 3 cost basket for intervention type 3 at the 100% intensity tier. This Table 3 aggregate does not cap the separate Table 1 and Table 2 costs.
- Cost item funding, maximum
- PLN 33,200
Maximum grant across the complete eligible Table 3 cost basket for intervention type 3 at the 40% intensity tier. This Table 3 aggregate does not cap the separate Table 1 and Table 2 costs.
- Cost item funding, maximum
- PLN 58,100
Maximum grant across the complete eligible Table 3 cost basket for intervention type 3 at the 70% intensity tier. This Table 3 aggregate does not cap the separate Table 1 and Table 2 costs.
- Cost item funding, maximum
- PLN 110
Maximum eligible grant amount for this one named cost item at the basic tier only; subject to the tier intensity and any programme-specific technology/eligibility conditions in the cited row.
- Cost item funding, maximum
- PLN 193
Maximum eligible grant amount for this one named cost item at the enhanced tier only; subject to the tier intensity and any programme-specific technology/eligibility conditions in the cited row.
- Cost item funding, maximum
- PLN 275
Maximum eligible grant amount for this one named cost item at the highest tier only; subject to the tier intensity and any programme-specific technology/eligibility conditions in the cited row.
- Cost item funding, maximum
- PLN 800
Maximum eligible grant for Wall recuperator included in heat-recovery ventilation, at the basic tier only, scoped to this cost row. A sublimit included in the row-7 ventilation-set maximum; it is not an additional project ceiling. Table 3 totals for eligible cost rows are separately bounded by intervention type 2 or 3; this row amount is not a standalone total-project maximum.
- Cost item funding, maximum
- PLN 1,400
Maximum eligible grant for Wall recuperator included in heat-recovery ventilation, at the enhanced tier only, scoped to this cost row. A sublimit included in the row-7 ventilation-set maximum; it is not an additional project ceiling. Table 3 totals for eligible cost rows are separately bounded by intervention type 2 or 3; this row amount is not a standalone total-project maximum.
- Cost item funding, maximum
- PLN 2,000
Maximum eligible grant for Wall recuperator included in heat-recovery ventilation, at the highest tier only, scoped to this cost row. A sublimit included in the row-7 ventilation-set maximum; it is not an additional project ceiling. Table 3 totals for eligible cost rows are separately bounded by intervention type 2 or 3; this row amount is not a standalone total-project maximum.
- Cost item funding, maximum
- PLN 53
Maximum eligible grant for Necessary ancillary works for window installation, at the basic tier only, scoped to this cost row. Includes listed ancillary materials/work such as internal/external sill replacement; grant cannot exceed 10% of the grant calculated from row-4 eligible costs, and is included within row 4 maximum. Table 3 totals for eligible cost rows are separately bounded by intervention type 2 or 3; this row amount is not a standalone total-project maximum.
- Cost item funding, maximum
- PLN 92
Maximum eligible grant for Necessary ancillary works for window installation, at the enhanced tier only, scoped to this cost row. Includes listed ancillary materials/work such as internal/external sill replacement; grant cannot exceed 10% of the grant calculated from row-4 eligible costs, and is included within row 4 maximum. Table 3 totals for eligible cost rows are separately bounded by intervention type 2 or 3; this row amount is not a standalone total-project maximum.
- Cost item funding, maximum
- PLN 132
Maximum eligible grant for Necessary ancillary works for window installation, at the highest tier only, scoped to this cost row. Includes listed ancillary materials/work such as internal/external sill replacement; grant cannot exceed 10% of the grant calculated from row-4 eligible costs, and is included within row 4 maximum. Table 3 totals for eligible cost rows are separately bounded by intervention type 2 or 3; this row amount is not a standalone total-project maximum.
- Cost item funding, maximum
- PLN 528
Maximum eligible grant amount for this one named cost item at the basic tier only; subject to the tier intensity and any programme-specific technology/eligibility conditions in the cited row.
- Cost item funding, maximum
- PLN 924
Maximum eligible grant amount for this one named cost item at the enhanced tier only; subject to the tier intensity and any programme-specific technology/eligibility conditions in the cited row.
- Cost item funding, maximum
- PLN 1,320
Maximum eligible grant amount for this one named cost item at the highest tier only; subject to the tier intensity and any programme-specific technology/eligibility conditions in the cited row.
- Cost item funding, maximum
- PLN 8,200
Maximum eligible grant for Higher-standard wood-gasification boiler, at the basic tier only, scoped to this cost row. Only the specified higher-standard wood-gasification/biomass configuration qualifies; ZUM listing, local anti-smog requirements where established, safe buffer/DHW storage and compliant flue are conditions in the row and continuation. Table 1 and Table 2 item ceilings are summed for the relevant eligible costs; this row amount is not a standalone total-project maximum.
- Cost item funding, maximum
- PLN 14,350
Maximum eligible grant for Higher-standard wood-gasification boiler, at the enhanced tier only, scoped to this cost row. Only the specified higher-standard wood-gasification/biomass configuration qualifies; ZUM listing, local anti-smog requirements where established, safe buffer/DHW storage and compliant flue are conditions in the row and continuation. Table 1 and Table 2 item ceilings are summed for the relevant eligible costs; this row amount is not a standalone total-project maximum.
- Cost item funding, maximum
- PLN 20,500
Maximum eligible grant for Higher-standard wood-gasification boiler, at the highest tier only, scoped to this cost row. Only the specified higher-standard wood-gasification/biomass configuration qualifies; ZUM listing, local anti-smog requirements where established, safe buffer/DHW storage and compliant flue are conditions in the row and continuation. Table 1 and Table 2 item ceilings are summed for the relevant eligible costs; this row amount is not a standalone total-project maximum.
- Cost item funding, maximum
- PLN 8,200
Maximum eligible grant for Higher-standard wood-pellet boiler, at the basic tier only, scoped to this cost row. Automatic pellet feed is required; emergency grate or its installation capability is excluded. ZUM listing and local anti-smog/flue conditions apply. Table 1 and Table 2 item ceilings are summed for the relevant eligible costs; this row amount is not a standalone total-project maximum.
- Cost item funding, maximum
- PLN 14,350
Maximum eligible grant for Higher-standard wood-pellet boiler, at the enhanced tier only, scoped to this cost row. Automatic pellet feed is required; emergency grate or its installation capability is excluded. ZUM listing and local anti-smog/flue conditions apply. Table 1 and Table 2 item ceilings are summed for the relevant eligible costs; this row amount is not a standalone total-project maximum.
- Cost item funding, maximum
- PLN 20,500
Maximum eligible grant for Higher-standard wood-pellet boiler, at the highest tier only, scoped to this cost row. Automatic pellet feed is required; emergency grate or its installation capability is excluded. ZUM listing and local anti-smog/flue conditions apply. Table 1 and Table 2 item ceilings are summed for the relevant eligible costs; this row amount is not a standalone total-project maximum.
- Eligible cost
- Eligible costs are products, materials and services in Annex 2. Installation services include transport and removal/waste handling within the listed installation cost; ancillary project documentation is eligible only when the related work is completed under the application.
- Funding intensity, maximum
- 40
Percentage of eligible costs for beneficiaries who satisfy all conditions of the basic tier. VAT is excluded from eligible costs. This percentage is not a uniform project cap.
- Funding intensity, maximum
- 70
Percentage of eligible costs for beneficiaries who satisfy all conditions of the enhanced tier. VAT is excluded from eligible costs. This percentage is not a uniform project cap.
- Funding intensity, maximum
- 100
Percentage of eligible costs for beneficiaries who satisfy all conditions of the highest tier. VAT is excluded from eligible costs. This percentage is not a uniform project cap.
- Ineligible cost
- VAT is not included in eligible costs.
Personnel and services
Other role
Service the grant can fund
Conditional project-service pathways; the documents do not prescribe a beneficiary employee headcount, FTE or salary. The prefinancing variant limits the applicant to at most three provider contracts and pays advances up to the grant percentage stated in the programme; those amounts are funding/payment terms, not provider wages.
Source documents
- Instructions for the CP grant application, 21 September 2026
- Official 20 July 2026 Czyste Powietrze programme change notice
- WFOŚiGW Warszawa – current Czyste Powietrze programme notice
- Program Priorytetowy Czyste Powietrze – current 20 July 2026 version
- Regulamin naboru wniosków – Czyste Powietrze, version from 20 July 2026
- Załącznik nr 2 – eligible costs and maximum funding level
- Załącznik nr 1 – combining grant with thermomodernisation tax relief
Call facts
- Opens
- —
- Provider
- WFOŚiGW Warszawa
- Source
- wfosigw.pl
- Checked
- 24 Oct 2026
- Review status
- Partial review
- Independent QA
- No published hold
- Reviewed
- 23 Oct 2026
This is a summary of the source page, not the official text. Eligibility, conditions and the submission system are at the source.