GW-P2 Wspieranie zadań związanych z bezpieczeństwem przeciwpowodziowym, usuwaniem skutków powodzi oraz retencją wodną
WFOŚiGW Warszawa · National call
Summary
Not an R&D call a Polish company can use, by Scindu's rule.
Funds flood protection and water retention infrastructure for companies, local governments, public service providers, other legal persons and sole traders.
- Who can apply
- Companies can lead: SME, large company, startup, municipality, public body, individual, other.
- Amount
- Budget not stated
- Deadline
- No deadline
- Status
- Openopened 23 Mar 2026
Machine-classified from the call text; check eligibility at the source.
Description
The description is on the provider's page.
Who can apply, in detail
- Applicant types
- SME, Large company, Startup, Municipality, Public body, Individual, Other
- Purpose
- Energy, environment, infrastructure
- R&D relevance
- 0 of 3
- Poland eligible
- Yes
- Country limit
- —
- Region
- Any
- Consortium
- Unclear
- Readiness level (TRL)
- —
- Topics
- Flood protection
- Water retention
- Retention reservoirs
Machine-classified from the call text; check eligibility at the source. 23 Oct 2026
Conditions
Typed facts extracted from the source documents by Scindu's grant-data review. Each value keeps its own conditions. Unknown means unstated, not zero or unlimited.
- Applicant type
- JST and their associations; entities providing public services while performing JST own tasks; commercial companies; other legal persons; natural persons conducting business activity
- Eligible project scope
- construction/reconstruction of retention reservoirs and other water-retention structures; construction/reconstruction/repair of flood-protection devices; construction/modernization of small-retention facilities; purchase of specialist machines/vehicles/equipment used to build, repair or maintain water devices; other activities producing ecological effect in flood safety, flood recovery or water retention
- Other condition
- instrument: loan; qualification: Open-mode intake until allocation exhaustion; the Fund may suspend or terminate earlier.; status: open_as_of_capture; status as of: 2026-10-23; window start: 2026-03-23
- Other condition
- JST unions and 100pct owned companies max: up to 40% of paid loan under specified variants and indicator conditions; additional exclusions include: liquidity-preservation loans, certain EU/foreign cofunded loans, <=48-month loans, below-25%-of-potential ecological effect, and loans for specialist water-device machinery/equipment; availability: may be partially remitted only if the specified application, repayment, project completion and environmental-effect conditions are met; not automatic; other beneficiaries max: up to 30% under specified variants
- Other condition
- creditworthiness or accepted security required: True; liquidity loan repayment: eligible costs awaiting reimbursement must be repaid within 14 calendar days after beneficiary receives reimbursement; principal grace: up to 24 months on request; public aid rate: EC base rate + at least 1.1 percentage points; minimum 1.5% p.a.; repayment term: up to 10 years; may be extended to 15 years in justified cases on request; specified reduced rate: 0.6 × rate; minimum 1.0% p.a. for gminy with 2024 G index <=1300 and powiaty with 2024 P index <=250; standard rate: 0.9 × bill rediscount rate; minimum 1.5% p.a.
- Other condition
- combined same task fund support max percent: 100; grant instrument listed: False; instruments: loan; liquidity-preservation loan; max share of eligible costs percent: 100; separate agreements required for multiple forms: True
- Other condition
- Projects must be located in Mazowieckie; beneficiary must document a balanced project budget; public-procurement, fair-competition and transparency requirements apply where applicable; 5-year project durability runs from contract-stated completion date; used machines/equipment over 2 years require appraisal and at least 3 photographs; maximum age 5 years
- Other condition
- applicant employee remuneration as fund cost: expressly ineligible; general hiring ban: False; named staff roles: ; salary or unit pay rates: not specified in reviewed programme; staffing minimum or qualifications: not specified in reviewed programme
Amounts and costs
- Eligible cost
- listed retention/flood-protection works and specialist machinery/equipment; design documentation integral to investment; earthworks and construction/installation; demolition of items being modernized/replaced; utility-conflict removal; complementary direct-investment works; geodetic service and investment supervision; road-lane occupation fees; other costs necessary to achieve ecological effect
- Eligible cost limit
- 100
For the same task, combined Fund support under the separately contracted listed forms may not exceed 100% of eligible costs; this aggregate ceiling is distinct from the loan-specific intensity.
- Funding intensity
- 100
Loan only: maximum share of eligible project costs. This is a financing percentage, not a monetary cap or salary rate.
Source documents
Call facts
- Opens
- 23 Mar 2026
- Provider
- WFOŚiGW Warszawa
- Source
- wfosigw.pl
- Checked
- 24 Oct 2026
- Review status
- Partial review
- Independent QA
- No published hold
- Reviewed
- 23 Oct 2026
This is a summary of the source page, not the official text. Eligibility, conditions and the submission system are at the source.