scindu funding
All calls

OWP-1 Zadania z zakresu ochrony wód

WFOŚiGW Warszawa · National call

OW-P1

Summary

Not an R&D call a Polish company can use, by Scindu's rule.

Funds wastewater infrastructure and sludge management for local governments, public service providers, companies, entrepreneurs and other legal persons.

Who can apply
Companies can lead: SME, large company, startup, public body, municipality, individual, other.
Amount
Budget not stated
Deadline
No deadline
Status
Openopened 23 Mar 2026
Open the official pageRegister to keep this call

Machine-classified from the call text; check eligibility at the source.

Description

The description is on the provider's page.

Who can apply, in detail
Applicant types
SME, Large company, Startup, Public body, Municipality, Individual, Other
Purpose
Energy, environment, infrastructure
R&D relevance
0 of 3
Poland eligible
Yes
Country limit
Poland, Mazowieckie
Region
mazowieckie
Consortium
Unclear
Readiness level (TRL)
—
Topics
  • Wastewater treatment
  • Sewer networks
  • Sludge management

Machine-classified from the call text; check eligibility at the source. 23 Oct 2026

Conditions7

Typed facts extracted from the source documents by Scindu's grant-data review. Each value keeps its own conditions. Unknown means unstated, not zero or unlimited.

Applicant type
local government units (JST) and their associations; entities providing public services while carrying out JST own tasks; commercial companies; other legal persons; natural persons conducting business activity
Eligible project scope
wastewater management: construction, expansion or modernization of wastewater/prefiltering treatment plants and sewer networks; sludge management; building connections to collective sanitary sewer networks; certified household wastewater treatment plants; vehicles and equipment for cleaning/clearing/maintenance of sewer systems or treatment processes; stormwater sewerage and related infrastructure serving water protection; other tasks producing an ecological effect in water protection
Other condition
instrument: loan; qualification: Open-mode intake; may stop before allocation exhaustion by Fund decision.; status: open_as_of_capture; status as of: 2026-10-23; window start: 2026-03-23
Other condition
grant available: False; loan products: ordinary loan; loan intended to preserve liquidity; maximum share of eligible costs percent: 100; same task combined fund support max percent: 100; separate agreements required for multiple forms: True
Other condition
base interest: 0.9 × bill rediscount rate, minimum 1.5% annually; conditional reduced interest: For stated 2024 G/P index thresholds: 0.6 × rate, minimum 1.0% annually; creditworthiness or approved security required: True; partial remission: conditional; varies by beneficiary and fulfilment of programme requirements; not automatic; repayment term years: up to 10; may be extended to 15 in justified cases on request
Other condition
project must be in Mazowieckie; for eligible household treatment plants, specified siting and technical conditions apply; purchase vehicles/equipment older than 2 years requires technical appraisal and at least 3 photos; maximum age 5 years; applicant must evidence balanced project costs; public procurement/competition and transparency duties apply where required
Other condition
applicant employee wages fundable: False; general hiring ban: False; named roles: ; salary or unit pay rates: not specified in reviewed programme; staffing minimums or qualifications: not specified in reviewed programme
Amounts and costs3
Eligible cost
project documentation integral to the investment; construction and installation works; demolition of items being modernized/replaced; technological buildings and laboratories; specified networks and connections; commissioning; utility-conflict removal; purchase and installation of equipment/materials; complementary direct-investment works; geodetic service; investment supervision; road-occupation fees; specified vehicles/equipment; other costs necessary for ecological effect
Eligible cost limit
100

For the same task, combined Fund support under the separately contracted listed forms may not exceed 100% of eligible costs; this aggregate ceiling is distinct from the loan-specific intensity.

Funding intensity
100

Loan only: maximum share of eligible project costs. This is a financing percentage, not a monetary cap or salary rate.

Source documents2
Call facts
Opens
23 Mar 2026
Provider
WFOŚiGW Warszawa
Checked
24 Oct 2026
Review status
Partial review
Independent QA
No published hold
Reviewed
23 Oct 2026

This is a summary of the source page, not the official text. Eligibility, conditions and the submission system are at the source.