scindu funding
All calls

Mikroretencja

WFOŚiGW Wrocław · National call

18/NC/UR/0.1/2026/Mikroretencja 2026 PJB: Nie

Summary

Not an R&D call a Polish company can use, by Scindu's rule.

Funds small-scale water retention; eligible applicants are unspecified.

Who can apply
Unclear from the source.
Amount
Budget not stated
Deadline
No deadline
Status
Openopened 22 Jun 2026
Open the official pageRegister to keep this call

Machine-classified from the call text; check eligibility at the source.

Description

The description is on the provider's page.

Who can apply, in detail
Purpose
Energy, environment, infrastructure
R&D relevance
0 of 3
Poland eligible
Yes
Country limit
Poland, Lower Silesia
Region
dolnośląskie
Consortium
Unclear
Readiness level (TRL)
—
Topics
  • Small-scale water retention
  • Water management

Machine-classified from the call text; check eligibility at the source. 23 Oct 2026

Conditions3

Typed facts extracted from the source documents by Scindu's grant-data review. Each value keeps its own conditions. Unknown means unstated, not zero or unlimited.

Applicant restriction
The route is for a natural person who owns, co-owns or holds perpetual usufruct over the property where a qualifying residential building is located. A joint property application is submitted by one co-owner/usufructuary with written consent from all the others; the applicant must hold legal title and evidence that the building was lawfully admitted to use. A property already subsidized under Moja Woda is excluded.
Application restriction
Applications are submitted through the GWD, not on paper. The call began 22 June 2026 and is continuous until the end date is announced, but the Fund may suspend or end it earlier if allocation is exceeded. Submissions after the applicable end date are left unexamined; submissions received after allocation are placed on a reserve list in arrival order and depend on available funds. For multiple applications concerning the same property, the first received is considered.
Eligible project scope
The eligible installation must collect rain or snowmelt water from non-permeable surfaces, store a total of at least 2 m³, retain water in the ground and/or use retained water. The project scope requires at least 50 m² of water-collecting surface and at least 2 m³ total storage capacity.
Amounts and costs12
Funding per beneficiary, maximum
PLN 8,000

Maximum grant amount per undertaking; also limited by the 90% eligible-cost rate.

Eligible cost
Eligible categories include collection, storage, soil-retention and use installations. The catalogue sets unit-cost maxima, including PLN 2,500 per m³ for closed tanks, PLN 300 per m³ for open ponds, and PLN 20 or PLN 40 per m² for specified collection, retention and water-use installations. The examples of ineligible costs include gutters/downpipes, green roofs/walls, used items, design documents and insurance; the source says the exclusion examples are not exhaustive.
Eligible cost
Eligible costs run from 1 July 2024 through no later than 31 December 2027. The grant is for undertakings completed by the application date; completion is measured by the date of the last invoice or equivalent accounting document for the purchase or service.
Eligible unit cost, maximumsealed (closed) above-ground tank; catalogue’s capacity footnote requires at least 2 m³ total qualifying tank capacity
PLN 2,500

This is the catalogue’s maximum gross eligible unit-cost amount, not the grant amount. It is subject to the programme’s up-to-90% grant rate, PLN 8,000 per-undertaking cap, and applicable minimum installation/area requirements.

Eligible unit cost, maximumsealed (closed) underground tank; catalogue’s capacity footnote requires at least 2 m³ total qualifying tank capacity
PLN 2,500

This is the catalogue’s maximum gross eligible unit-cost amount, not the grant amount. It is subject to the programme’s up-to-90% grant rate, PLN 8,000 per-undertaking cap, and applicable minimum installation/area requirements.

Eligible unit cost, maximumsoil-retention installation; minimum collection surface 50 m²
PLN 40

This is the catalogue’s maximum gross eligible unit-cost amount, not the grant amount. It is subject to the programme’s up-to-90% grant rate, PLN 8,000 per-undertaking cap, and applicable minimum installation/area requirements.

Eligible unit cost, maximumopen above-ground tank/pond; catalogue’s capacity footnote requires at least 2 m³ total qualifying tank capacity
PLN 300

This is the catalogue’s maximum gross eligible unit-cost amount, not the grant amount. It is subject to the programme’s up-to-90% grant rate, PLN 8,000 per-undertaking cap, and applicable minimum installation/area requirements.

Eligible unit cost, maximuminstallation collecting rain/meltwater from impermeable roofs, paths or driveways; minimum collection surface 50 m²
PLN 20

This is the catalogue’s maximum gross eligible unit-cost amount, not the grant amount. It is subject to the programme’s up-to-90% grant rate, PLN 8,000 per-undertaking cap, and applicable minimum installation/area requirements.

Funding intensity, maximum
90 percent of eligible project costs

Grant is reimbursement of expenditures; subject to the separate PLN 8,000 per-undertaking maximum.

Ineligible cost
Green roofs and green walls are explicitly listed as ineligible costs. The catalogue states its exclusion list is non-exhaustive.
Ineligible costApplies to this specific marital-community and invoice/service transaction; does not categorically exclude unrelated suppliers or all spouse-related costs.
The catalogue excludes a project cost when the grant recipient’s spouse, while remaining in the statutory marital community property regime and operating as a natural-person business, sells, delivers or performs a service to the grant recipient and issues an invoice or equivalent accounting document for it.
Project cost, minimum
PLN 2,000

Minimum value of the eligible project scope included in the application; not a minimum grant.

Source documents6
Call facts
Opens
22 Jun 2026
Provider
WFOŚiGW Wrocław
Checked
24 Oct 2026
Review status
Partial review
Independent QA
No published hold
Reviewed
23 Oct 2026

This is a summary of the source page, not the official text. Eligibility, conditions and the submission system are at the source.