scindu funding
All calls

Integrated Approaches for Retrofitting Infrastructures with Innovative Energy Storage Technologies

Horizon Europe · Grant topic

HORIZON-CL5-2027-07-D3-27

Summary

A Polish company can use this call for R&D.

Funds companies and research organisations demonstrating innovative energy storage integrated into obsolete infrastructure to improve flexibility, sustainability and economic viability.

Who can apply
Companies can lead: SME, large company, research org, university.
Amount
€22,500,000Indicative budget
Deadline
01 Dec 2027 01:00 CETin 403 days
Status
Forthcomingopens 4 Aug 2027
Open on the portalRegister to keep this call

Machine-classified from the call text; check eligibility at the source.

Description

Expected Outcome:

Project results are expected to contribute to all the following expected outcomes:

• Improved energy security of the energy system by offering cost-effective and efficient solutions for additional diverse and flexible energy storage capacities.

• Improve the sustainability and circularity of energy storage systems.

• Enhanced economic viability of energy storage by utilizing existing infrastructures.

Scope:

Demonstration of novel or improved technological solutions for cost-efficient, circular and sustainable energy storage, which contribute to grid flexibility and make use of existing obsolete or outdated energy or other infrastructures. Proposals should integrate the synergies between novel or improved energy storage technologies and retrofitting of obsolete or outdated infrastructures, like e.g. old hydropower dams and basins, decommissioned power plants, former industrial facilities, coal mines, fossil fuel infrastructure etc. by optimizing at the same time storage capacity and efficiency as well as circularity and socioeconomic and environmental sustainability, which should be addressed, e.g. by stakeholder outreach and consideration of possible environmental impacts. Furthermore, proposals should follow secure by design approach and integrate built-in security in the energy systems.

Selected projects are expected to contribute to the BRIDGE initiative[1] and actively participate in its activities.

Technology Readiness Level - Technology readiness level expected from completed projects

Activities are expected to achieve TRL 6-8 by the end of the project – see General Annex B. Activities may start at any TRL.

[1] https://bridge-smart-grid-storage-systems-digital-projects.ec.europa.eu/

Who can apply, in detail
Applicant types
SME, Large company, Research org, University
Purpose
Research and innovation
R&D relevance
3 of 3
Poland eligible
Yes
Country limit
—
Region
Any
Consortium
Unclear
Readiness level (TRL)
—
Topics
  • Innovative energy storage
  • Infrastructure retrofitting
  • Grid flexibility
  • Circular energy systems

Machine-classified from the call text; check eligibility at the source. 23 Oct 2026

Amounts and costs
Indicative budget
€22,500,000

Topic budget as stated in the portal's budget table. Lump-sum and per-project limits are in the call conditions.

Call facts
Opens
4 Aug 2027
Deadline model
Single-stage
Programme
Horizon Europe · 2021 - 2027
Call
HORIZON-CL5-2027-07 · ENERGY
Types of action
HORIZON Innovation Actions
Checked
24 Oct 2026
Portal updated
7 Oct 2026

This is a summary of the source page, not the official text. Eligibility, conditions and the submission system are at the source.