Integrated Approaches for Retrofitting Infrastructures with Innovative Energy Storage Technologies

Horyzont Europa · Temat konkursu

HORIZON-CL5-2027-07-D3-27

Podsumowanie

Polska firma może skorzystać z tego naboru na B+R.

Funds companies and research organisations demonstrating innovative energy storage integrated into obsolete infrastructure to improve flexibility, sustainability and economic viability.

Kto może złożyć wniosek
Firma może być liderem: SME, large company, research org, university.
Kwota
22 500 000 €Budżet orientacyjny
Termin
01.12.2027 01:00 CETza 403 dni
Status
Nadchodzącyotwarcie 4 sie 2027
Otwórz na portaluZarejestruj się, aby zachować nabór

Ocena maszynowa na podstawie tekstu naboru; warunki sprawdź u źródła.

Opis

Expected Outcome:

Project results are expected to contribute to all the following expected outcomes:

• Improved energy security of the energy system by offering cost-effective and efficient solutions for additional diverse and flexible energy storage capacities.

• Improve the sustainability and circularity of energy storage systems.

• Enhanced economic viability of energy storage by utilizing existing infrastructures.

Scope:

Demonstration of novel or improved technological solutions for cost-efficient, circular and sustainable energy storage, which contribute to grid flexibility and make use of existing obsolete or outdated energy or other infrastructures. Proposals should integrate the synergies between novel or improved energy storage technologies and retrofitting of obsolete or outdated infrastructures, like e.g. old hydropower dams and basins, decommissioned power plants, former industrial facilities, coal mines, fossil fuel infrastructure etc. by optimizing at the same time storage capacity and efficiency as well as circularity and socioeconomic and environmental sustainability, which should be addressed, e.g. by stakeholder outreach and consideration of possible environmental impacts. Furthermore, proposals should follow secure by design approach and integrate built-in security in the energy systems.

Selected projects are expected to contribute to the BRIDGE initiative[1] and actively participate in its activities.

Technology Readiness Level - Technology readiness level expected from completed projects

Activities are expected to achieve TRL 6-8 by the end of the project – see General Annex B. Activities may start at any TRL.

[1] https://bridge-smart-grid-storage-systems-digital-projects.ec.europa.eu/

Kto może złożyć wniosek – szczegóły
Typy wnioskodawców
SME, Large company, Research org, University
Cel
Badania i innowacje
Znaczenie dla B+R
3 z 3
Polska kwalifikuje się
Tak
Ograniczenie krajów
—
Region
Dowolny
Konsorcjum
Niejasne
Poziom gotowości (TRL)
—
Tematy
  • Innovative energy storage
  • Infrastructure retrofitting
  • Grid flexibility
  • Circular energy systems

Ocena maszynowa na podstawie tekstu naboru; warunki sprawdź u źródła. 23 paź 2026

Kwoty i koszty
Budżet orientacyjny
22 500 000 €

Budżet tematu z tabeli budżetowej portalu. Limity na projekt i ryczałty są w warunkach konkursu.

Dane naboru
Otwarcie
4 sie 2027
Tryb terminów
Single-stage
Program
Horyzont Europa · 2021 - 2027
Konkurs
HORIZON-CL5-2027-07 · ENERGY
Rodzaje działań
HORIZON Innovation Actions
Źródło
ec.europa.eu
Sprawdzono
24 paź 2026
Aktualizacja portalu
7 paź 2026

To skrót ze strony źródłowej, nie tekst urzędowy. Kwalifikowalność, warunki i system składania wniosków są u źródła.